| 1 | Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 2 | Sand Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. |
| 3 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 4 | Providing R.C.C. M20grade with 20mm and down graded CBHG chips including hoisting and laying with all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer-in- charge.Column Base |
| 5 | Column&Beam |
| 6 | Plinth Beam |
| 7 | Stair Case |
| 8 | Lintel |
| 9 | TMT reinforcement for R.C.C. work including cutting, bending, binding and placing in position Labor for including cost of binding wire 18 to 20 gauge and cost conveyance of M.S. rod etc. all complete. |
| 10 | Fly ash Brick masonry in cement mortar (1:6) in F&P with all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in- charge. |
| 11 | Fly ash Brick masonry in cement mortar (1:6) in Superstructure with all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in- charge. |
| 12 | Providing 12mm thick cement plaster (1:6) over the brick masonry walls including all cost of the materials, carriage, royality,alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 13 | Providing 16mm thick cement plaster (1:6) over the brick masonry walls including all cost of the materials, carriage, royality,alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 14 | Supplying fitting fixing of main gate GI framed fitting including all cost of the materials, carriage, alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 15 | Supplying fitting fixing of Ply wood shooter including all cost of the materials, carriage, alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. Please Enable Macros to View BoQ information |