| 1 | Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 2 | Sand Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. |
| 3 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 4 | Providing R.C.C. M20grade with 20mm and down graded CBHG chips including hoisting and laying with all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer-in- charge.Column Base |
| 5 | Column & Beam |
| 6 | Plinth Beam |
| 7 | Lintel |
| 8 | SlabChaja |
| 9 | TMT reinforcement for R.C.C. work including cutting, bending, binding and placing in position Labor for including cost of binding wire 18 to 20 gauge and cost conveyance of M.S. rod etc. all complete. |
| 10 | Fly ash Brick masonry in cement mortar (1:6) in F&P with all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in- charge. |
| 11 | Fly ash Brick masonry in cement mortar (1:6) in Superstructure with all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in- charge. |
| 12 | Providing 12mm thick cement plaster (1:6) over the brick masonry walls including all cost of the materials, carriage, royality,alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 13 | Providing 16mm thick cement plaster (1:6) over the brick masonry walls including all cost of the materials, carriage, royality,alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 14 | supplying fitting and fixing of vertrifed tile in floors of size 600mm x 600mm(plain) of approved make conforming to IS: 13755 laid on 20mm thick cement mortar (1:4) (1 cement: 4 Course sand) and filling joints with white cement of approved quality including cost , conveyance, taxes, cost of all labour etc. complete. |
| 15 | Supplying fitting fixing of main gate GI framed fitting including all cost of the materials, carriage, alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 16 | Supplying fitting fixing of Ply wood shooter including all cost of the materials, carriage, alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 17 | Wall painting two coats with plastic emulsion paint with cost of paint. |
| 18 | Painting two coats over a coat of primer on new wood/Steel work of doors, windows, grill and including all labour, T & P, cost of paints as per the direction of Engineer-in-charge. |
| 19 | Painting two coats with weather seal coat over a coat of water bound wall primer. |
| 20 | Providing P.C.C. (1:2:4) grade with 12mm and down graded CBHG chips including hoisting and laying with all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer-in- charge. |
| 21 | Providing 12mm thick cement plaster (1:6) with cement punning over the brick masonry walls including all cost of the materials, carriage, royality,alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 22 | Providing and laying heavy duty factory made hydraulically pressed and mechanically compacted precasted interlocking tuf a stone brand pavers of 80mm thick size shape with 50mm sand bed and leveling and laying of interlocking paver block with sandbinding and final compacting with plate vibrator finishing for the surface. |
| 23 | Rigid smooth centering and shuttering for C.C. work including stripping the same after completion of stripping time. |
| 24 | supplying all materials, labour, T&P and cutting holes through existing brick/stone masonry walls for taking HCI/PVC pipes and fittings including making good the damages in cement mortar (1:4) etc. all complete as per P.H. specification and direction of E.I.C.250mm to 375mm thick wall |
| 25 | Providing and fixing Chlorinated polyvinyl Chloride (CPVC) Pipes (SDR 11) conforming to I.S 15778 having the thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipes with clamps at 1.00 mtr spacing, this includes jointing of pipes and fittings with one step solvent cement and testing of joints etc all complete as per direction of the E.I.C. (Make: Oriplast/Supreme/Astral/Hariplast/Fenolex & Equivalent)32mm Outer dia C-PVC pipe(External) |
| 26 | 25mm Outer dia C-PVC pipe(External) |
| 27 | Supplying all materials, labour, T&P for providing fitting and fixing of brass/C.P fittings of the following nominal bore with supply of all jointing materialsetc. all completed as per approved specification and direction of E.I.C15mm dia C.P.angular stop cock |
| 28 | 15mm dia C.P. Long body bib cock |
| 29 | C.P. extension piece-2\\" |
| 30 | 110 mmdia UPVC SWR Pipe (Type B) |
| 31 | 75mm dia U-PVC SWR pipes (Type B) |
| 32 | 75x75x75 mm dia UPVC Plain Shoe Bend 45° |
| 33 | 110mm dia P.V.C. SWR S Trap |
| 34 | 110 mm dia P.V.C. SWR Vent Cowl |
| 35 | 550mm x 400mm wash hand basin (Hindware/Parryware/Neycer/ CERA) |
| 36 | C.I. Basin Bracket in pair |
| 37 | fixing G.C.I. Sheet in roof drilling hole in windties including fixing of ridges valleys wind ties etc. excluding cost of fittings. |
| 38 | Labour for fixing G.C.I. Sheet in roof drilling hole in windties including fixing of ridges valleys wind ties etc. excluding cost of fittings. (Labour Only) |
| 39 | Providing and fixing R.C.C. RING cylindrical vertical water storage tanks(1.2 dia 1.8 height) including cutting holes through the tank and fixing mild steel tubes and fittings and extra sockets jam ts, fixing ball valve etc, including hoisting upto a height of 5 metres above ground level and placing the tank to the required position etc all complete as per specification and direction of the Engineer in charge. |
| 40 | Supplying fitting fixingand febricating iron work arought and put up at purline including all cost of the materials, carriage, alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge.40 x 40 x 4.0 |
| 41 | 100x100x4mm |
| 42 | 12x12mm |
| 43 | Labour for fitting and fixing in position steel cutting edge as per approved design using M.S. angle plates, bolts and nuts complete including cutting angles to required size, bending to shape, drilling holes, reverting and welding, etc. complete in all respect but excluding cost of angles and plates. |
| 44 | Recessed wiring to light point / fan point / exhaust fan point / call bell point with 1.5 sq.mm FR PVC insulatedsingle core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC conduit with 5 Amp, 250 V piano type switch with white colour frame ISI marked and ceiling rose ISI marked mounted on MS box having front bakelitecover of suitable size , MS box with 1.0 sq.mm FR PVC insulated single core multistrand copper conductor asearth wire including all accesories and connection as per direction of Engineer in Charge |
| 45 | Supplying and fixing of metal box of 150 mm x 75 mm x 60 mm deep (nominal size) on surface or inrecess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3pin 5 / 6 amps socket outlet and 5 / 6 amps piano type switch & with colour frame, connection, painting etc as required. complete as per the direction of Engineer-in-Charge.. |
| 46 | Supplying and fixing of metal box of 150 mm x 75 mm x 60 mm deep (nominal size) on surface or inrecess with suitable size of phenolic laminated sheet cover in front including providing and fixing 2 nos MCB & with colour frame, connection, painting etc as required. complete as per the direction of Engineer-in-Charge.. |
| 47 | Circuit or Sub-main wiring in 20/25/32/50mm dia. good quality ISI mark PVC Conduit with following sizes PVC insulated un-sheathed 1100V,Single Core FRLS Cu. conductor wire of approved make with all other required materials & labour complete as per the direction of Engineer-in-Charge. (2 x 1.5 + 1 x 1.0) sq.mm copper wire for 6A Light plug Point, wall fan. |
| 48 | (2 x 2.5 + 1 x 1.5) sq.mm copper wire from Main Switch to BDB. |
| 49 | Celling Fan |
| 50 | Supplying & Fixing of angle / Batten Holder fitting complete with 1 no of LED Lamp 10 watt of approved make complete with all other necessary fixing materials including termination & labour including all other materials as required complete as per the direction of Engineer-in-Charge(Philips/CG/Havells). |
| 51 | Supplying & Fixing of light angle / Batten Holder fitting complete with 1 no of LED Lamp 10 watt of approved make complete with all other necessary fixing materials including termination & labour including all other materials as required complete as per the direction of Engineer-in-Charge(Philips/CG/Havells). |
| 52 | Supplying & Fixing of outer flood light angle / Batten Holder fitting complete with 1 no of LED Lamp 10 watt of approved make complete with all other necessary fixing materials including termination & labour including all other materials as required complete as per the direction of Engineer-in-Charge(Philips/CG/Havells). |
| 53 | Supplying all material labour, tools and plants and setting up boreing equipments including erection of suitable staging for installation & dismatling & removeing the same after completion of the work including trnsportation of boring equipments cleaning & leveling the site excavation of mud pit cleaning etc complete as per direction of Engineer in charge.Setting boring equipments |
| 54 | Supplying all labour, tools and plants and transporting boring pipes, top casing, grouting pipes, PVC pipes and fittings, PVC well screens, cement bentonite and gravels etc to work sites including loading and unloading etc. complete as per the direction of the Engineer-in-charge |
| 55 | Supplying all labour, tools and plants and drilling pilot bore not less than 80 mm dia without casing pipes in all kinds of soils for the following depths excluding supply of necessary cutting equipments, extra sockets (whenever required) etc and withdrawing the boring pipes, washing and keeping the bore clear for logging if required all complete as per the direction of Engineer-in-chargeDrilling pilot bore from 0 to 360 metres |
| 56 | Supplying all labour, tools land plant and reaming the pilot bore to the following sizes and depths without casing pipes including withdrawing the boring pipes, washing the bore by means of pipe cylinder etc all complete as per direction of Engineer-in-Charge. Reaming 100mm to 150mm diaFrom 0 to 360 metres |
| 57 | Reaming 150mm to200mm diaFrom 0 to 360 metres |
| 58 | Reaming 200mm to250mm diaFrom 0 to 360 metres |
| 59 | Supplying all labour, tools and plant and lowering the 250mm dia top casing pipes into the positioin and removing the same after use all complete as per direction of Engineer-in-Charge. |
| 60 | Supplying all labour, tools and plant and jointing materials and lowering the pvc casing pipes, fittings and well screens in position including fitting and fixing of centraliser, cutter plug and washing the bore etc complete as per the direction of the Engineer in charge125/100mm dia ND PVC(80 schedule) strainer arrangement 0m to 29 mtr |
| 61 | 27 mto 32mtr |
| 62 | Supplying all labour, tools and plant and packing the bore with washed gravelof shingle of required size and specification arround the well screen & pipe etc as per the direction of the Engineer-in-charge |
| 63 | Supplying all labour, tools and plant and grouting with cement slurry for sanitary sealing in the bore around the upper most 3 metres of 125/100 mm dia PVC casing pipe properly as per the direction of the Engineer-in-Charge. (including the cost of cement) |
| 64 | Supplying all labour, tools and plant and materials for cleaning and developing the PW by 7 hr continuos pumping per day minimum of 7 consecutive day or till clear sand free water is obtained as per the direction of the EIC. |
| 65 | Cost of Material 125mm PVC casing Pipe |
| 66 | 100 mm PVC strainer |
| 67 | 100 mm C.I Plug cutter |
| 68 | Display board with writing painting and photograph (Pre,dring & post) Please Enable Macros to View BoQ information |