| 1 | Earthwork in excavation of foundation & plinth in hard soil mixed with gravels including dressing and levelling the bed up to the required depth & removing the excavated earth & depositing the same away from the work site within initial lead of 50 mtr & initial lift of 1.5 mtr, including cost of labour T&P articles required for the work including shoring, shuttering, propping & dewatering if required, etc. complete in all respect as per the specification & direction of the Engineer-in-Charge.complete as per direction of the Engineer-in-charge. |
| 2 | Supplying and filling foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceed 23.5cm(9\\") in depth with all lead and lift inclujding cost, conveyance, loading, unloading, royalities and taxes of all materials, cost of all labour, sundries, T&P required for the work etc complete in all respect as per direction by the Engineer -in- Charge |
| 3 | Providing and laying plain cement concrete of proportion M10 in foundation and floors using 40mm and down graded black Crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc complete as per the direction of the Engineer -in –charge |
| 4 | Brick Masonry work with Fly Ash brick of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. |
| 5 | R.C.C (M 20) using 20 mm and down graded H.G crusher broken chips of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. including Centering, Shuttering for all types of RCC works for COLUMN base including false works and dismantling them after casting and depositing the materials 50m away from the site of work complete and cost, conveyance royalties and taxes of all materials, labour and T&P required for the work etc complete as directed by Engineer – in- charge. |
| 6 | R.C.C (M 20) using 20 mm and down graded H.G crusher broken chips of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. including Centering, Shuttering for all types of RCC works for PLINTH BEAM including false works and dismantling them after casting and depositing the materials 50m away from the site of work complete and cost, conveyance royalties and taxes of all materials, labour and T&P required for the work etc complete as directed by Engineer – in- charge. |
| 7 | R.C.C (M 20) using 20 mm and down graded H.G crusher broken chips of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. including Centering, Shuttering for all types of RCC works for COLUMN, BEAM including false works and dismantling them after casting and depositing the materials 50m away from the site of work complete and cost, conveyance royalties and taxes of all materials, labour and T&P required for the work etc complete as direction of EIC. |
| 8 | R.C.C (M 20) using 20 mm and down graded H.G crusher broken chips of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. including Centering, Shuttering for all types of RCC works for ROOF SLAB including false works and dismantling them after casting and depositing the materials 50m away from the site of work complete and cost, conveyance royalties and taxes of all materials, labour and T&P required for the work etc complete as direction of EIC. |
| 9 | Providing, Cutting, straightening coiled or bent up Fe-415 grade SAIL / VIZAG / TATA / JINDAL PANTHER steel welding or jointing if necessary, bending, binding, tying the grills as required for RCC works, and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods, Fe-415 or equivalent and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer-in-Charge (payment will be made according to the actual weight of M.S. rod, Fe-415 or equivalent consumed in the work and no separate payment will be made towards weight of binding wires which is to be borne by the contractor at his own cost) as per the direction of Engineer-in-charge. |
| 10 | Providing 16mm thick cement plaster to the inside surface of Brick masonary work with cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plaster surface smooth using wooden floats only to proper plumbs and level as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing, sundries and T&P etc. complete as per specification and direction of the Engineer-in-charge. |
| 11 | Providing 12mm thick cement plaster to the outside surface of brick masonry wall with cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plaster surface smooth using wooden floats only to proper plumbs and levels as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing, sundries and T&P etc. complete as per direction of the Engineer-in-charge |
| 12 | White washing three coats with shell lime of approved make and finished smooth and even surface to receive painting on plastered wall surface of approved shade on new work to give an even shade including cost of Shell lime all labour, scaffolding, sundries, brushes and T&P etc. complete as per specification and direction of the Engineer-in-charge.. Please Enable Macros to View BoQ information |