| 1 | Schedule 'A' Part-I (BUILDINGS AND STRUCTURES)This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. |
| 2 | Lumpsum price worked out by the contractor for Construction of Small Compressor Test Facility Building in D/S including all fittings and fixtures complete all as specified and as shown on drawings. |
| 3 | Lump sum price worked out by the Contractor for “ADDITION / ALTERATION TO SMALL COMPRESSOR TEST FACILITY” as listed in Schedule ‘A’ Part - II representing ____________ % __________________ percent Above / Below the lump sum price of ₹11,97,524.66 inserted by the MES in Schedule ‘A’ Part - II |
| 4 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `9,69,639.00 inserted by the MES in Schedule ‘A’ Part - III |
| 5 | Lump sum price worked out by the Contractor for “EXCAVATION, EARTHWORK AND SITE CLEARANCE” as listed in Schedule ‘A’ Part - IV representing __________ % ____________ percent Above / Below the lump sum price of `1,67,520.20 inserted by the MES in Schedule ‘A’ Part - IV |
| 6 | Lump sum price worked out by the Contractor for “LIGHTNING PROTECTION” as listed in Schedule ‘A’ Part - V representing ___________ % ___________________ percent Above / Below the lump sum price of ₹96,497.60 inserted by the MES in Schedule ‘A’ Part - V |
| 7 | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VI representing ____________ % ____________________________ percent Above / Below the lump sum price of `87,719.20 inserted by the MES in Schedule ‘A’ Part - VI |
| 8 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - VII representing __________ % __________________ percent Above / Below the lump sum price of ₹19,824.00 inserted by the MES in Schedule ‘A’ Part - VII |
| 9 | Schedule 'A' Part - VIIIThis Schedule is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. This Schedule constitutes Sl. Item Nos. 9.00 to 59.00. |
| 10 | INTERNAL ELECTRIFICATIONTaking down carefully unserviceable aluminium / copper point wiring (light, fan, socket or power) complete with fittings such as switches, sockets, ceiling rose, light fittings etc, removing all material for reuse / issued under Schedule of Credit and making good the distrubed surface as the existing one complete all as specified and directed. |
| 11 | Taking down exiting copper / aluminium sub main wiring complete for taking credit (credit for above items should be made as per conditions separately) and making good disturbed surfaces of walls, floors etc., complete all as specified and directed. |
| 12 | S&F, exhaust fan, steel body AC single phase 230V of size 380mm sweep 900RPM with blades and frame and louvers including cutting the wall of stone / brick masonry as per the size of exhaust fan including grouting the bolts, nuts etc., for fixing necessary connection with three core flexible wire from and making good the distrubed surface as the existing one, exhaust fan to ceiling rose complete all as specified and directed. |
| 13 | S&F, LED batten with aluminium housing provided for efficient heat dissipation with polycarbonate diffuser and integrated electronic driver 1 x 20 watts fixing on wall / ceiling with rod complete all as specified and directed. Please Enable Macros to View BoQ information |
| 14 | S&F, LED batten with aluminium housing provided for efficient heat dissipation with polycarbonate diffuser and integrated electronic driver 1 x 20 watts fixing on wall / ceiling with rod complete all as specified and directed. Please Enable Macros to View BoQ information |