| 1 | Item No.1:- Clearing the site before and after the construction...etc complete. |
| 2 | Item No.2:- Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-spliting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc |
| 3 | As per R.A No.1 |
| 4 | Item No.3:- Excavation in hard rock of all toughness by Breaker including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-spliting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc |
| 5 | As per R.A No.2 |
| 6 | Item No.4 :- Providing and laying in situ C.C. of grade M - 10 of trap / granite / gneiss / quartzite graded metal for foundation And Bedding with concrete Mixer including Placing compacting, curing etc.complete with initial lead of 1 kmand all lifts as directed (40 M.S.A.) |
| 7 | As per R.A No.3 |
| 8 | Item No.5 :- Providing and laying in situ C.C. of grade M - 200 (1:1.5:3) of trap / granite / gneiss / quartzite graded metal, compacting, curing etc.complete with initial lead of 50 m. and lift 1.50 m. (40 M.S.A.) |
| 9 | As Per R.A No. 4 |
| 10 | Item No.6 :- Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. Including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete as directed. |
| 11 | As per WCD CSR 2022.23 P/I 45/68 |
| 12 | Item No.7- Providing cut off trench filling using selected impervious soil directly available from material of excavation including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc. complete with lead up to1 km for water and all lifts as directed. |
| 13 | As per WCD CSR 2022.23 P/I 23/9 |
| 14 | Item No.8 :- Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted / welded connections without anticorrossive paint and over it two coats oil painting of approved quality and shade etc complete |
| 15 | As per MJP SSR 2023-24 P/I 46/F-5 |
| 16 | Item No.9 :- Mnufacturing with QAP and fabrication of KT weir needle gates - straight type size 2.15 x 0.5 M - 94Kg weight as per relevant Indian Standards with all material, Mild steel confirming to IS 4623 & Welding electrodes AWS E6013 for general weld joints. It includes all materials, Labour charges, 1Km lead Charges of Transportation, loading and unloading charges of Gate parts at site etc . |
| 17 | As per R.A No.5 |
| 18 | Item No.10:- Dewatering by pumping out water collected with 10 to 19 HP Disel / electrical pumps including cost of all materials, machinery, labour, providing sump and all other ancillary operations whenever necessary etc complete |
| 19 | As per R.A No.6 |
| 20 | Item No.11 - Providing And Fixing Name Board As Per Details of Scheme etc complete |
| 21 | Item No.12 -Royalty Chargs for Sand,Metal etc Material in this work etc complete. |
| 22 | As Per Royalty Charges Statement |
| 23 | Add 1 % for Insurance charges |
| 24 | GST Please Enable Macros to View BoQ information |