| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 4 | Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 5 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 6 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.on WMM |
| 7 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. |
| 8 | Construction of Median ( in new jersy type) as per specific drawing and design (520mm at bottom & top 250mm width and 1250mm ht) RCC Grade M20 using batching plant transit mixer & manual placing as per SI No. 288 |
| 9 | Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications |
| 10 | C/O culvert and u drain- Excavation for structures in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting within all lifts and lead upto 1000m as per SI No. 251 |
| 11 | Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per SI No. 281 |
| 12 | Supply and laying and 15mm gauge Brick Ballast compacting with fine sand as 1st class beding cradle below the pipe in 15 cm thickness and up to 10 % hight of pipe on either side. |
| 13 | Clas-150 brick work with 1:4 cement and coarse sand in foundation and plinth including supply of all materials labour and T&P etc. Requuired for proper completion of work as per S.I No. 305(b) |
| 14 | R.C.C. Work with cement approved coarse sand and 20 mm gauge stone grit in proportion of 1:1.5:3 for slabs excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shutterring etc. and also including supply of all materials labour and T&P etc. required for proper completion of work. Binding wire cost being included in the item as per SI No. 283(b) |
| 15 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 16 | Struck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and TandP etc Requuired for proper completion of work as per S.I No. 574. |
| 17 | Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H toward drawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200) |
| 18 | KM Stone |
| 19 | Hecto meter |
| 20 | Providing and laying bituminous concreate with 100 TPH batch type hot mix plant producing an average output of 30 cum per hour using crushed aggregrate of specified grading,premixed with bituminous binder bitumen [email protected]% of Mix and filler, Transporting finisher with sensor |
| 21 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including retroreflactive glass beads@ 250 gms per sqm area thickness of 2.5 mm is exlusive of suface applied glass beads as per IRC:35 the finished surface to be level uniform and free form streak and holes MORTH 803 (8.13). |
| 22 | Direction of place indentification sign with size more than 0.90 sqm size board providing and erecting direction place identification reflactoirised sign as per IRC 67 made high intensity grade shieeting wide clause 801.3 fixing over aluminium sheeting 2mm thick area exceeding 0.9 sqm supported on a mild steel angle iron post 75mm MORTH 801(8.6). |
| 23 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. (Repeated / Tranvers bar) Providing and laying of hot applied thermoplastic compound 5 mm thick including reflectorising glass beads @ 500 gms per sam area, thickness of 5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. |
| 24 | Supply and errective of build up over head structure 12m to 15m span comprising o three vertical post of 6m high made up 300mm NB heavy class ms pipe as vertical member welded with 100 mm ms plate at top and bottom for bearing of horizontal MORTH 802. |
| 25 | Supply and errective of build up over head structure 12m to 15m span comprising o three vertical post of 6m high made up 300mm NB heavy class ms pipe as vertical member welded with 100 mm ms plate at top and bottom for bearing of horizontal MORTH 802. |
| 26 | Dismantelling and reconstruction of boundry wall and selfie point& dimolition of enchrochment--Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar (DSR-15.7.4) |
| 27 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)(DSR-15.2.2) |
| 28 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. (DSR-15.60) |
| 29 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil |
| 30 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 31 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR-6.4.1) |
| 32 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 33 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 34 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and and over lapping & hooks.(T.M.T. Fe 500) |
| 35 | M-150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. |
| 36 | Brick work 1st Class M-150 in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6 cement & coarse sand) F.M.2.25 |
| 37 | 12 mm cement plaster in single coat on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 coarse sand. F.M. 2.25 |
| 38 | 15 mm cement plaster on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 coarse sand. F.M. 2.25 |
| 39 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 40 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 41 | Centering & Shuttering including strutting,propping etc and removal of form for - Plinth Beams and Lintel,etc. |
| 42 | Centering & Shuttering including strutting,propping etc and removal of form for - Foundations and Footing.. |
| 43 | Centering & Shuttering including strutting,propping etc and removal of form for - Columns |
| 44 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge.32 mm nominal dia Pipes (DSR-18.8.4) |
| 45 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge.25 mm nominal dia Pipes (DSR-18.8.3) |
| 46 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :25 mm nominal bore (DSR-18.17.1) |
| 47 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :32 mm nominal bore (DSR-18.17.2) |
| 48 | Providing and laying machine cut, mirror polished Marble stone flooring, in required design (Simple geometrical, abstract etc.) and in patterns in combination with Italian marble stones of different colours, shades and finished surface texture etc., in linear portions of the building, all complete as per the architectural drawings, with 18 mm thick stone slab laid over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with white cement slurry @ 4.4 kg/sqm, including pointing with white cement slurry admixed with pigment to match the marble shade, including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.18 mm thick Italian Marble stone slab, Perlato, Rosso verona, Fire Red or Dark Emperadore etc. (DSR-15.52.1) |
| 49 | Crazy ceramic tile flooring, with under layer 12 mm thick cement mortar 1:4 (1 cement: 4 coarse sand), with joints not exceeding 5 mm, including filling the gaps with ordinary cement mixture & mixing with synthetic polyester fibre, triangular in shape having specific gravity of 1.34 to 1.40, cross section size ranging from 10 to 40 micron & length upto 6 mm , mixing fibre @ 125 grams per 50 kg of cement in cement mortar, including providing and mixing water proofing material in mortar @ 1 kg per 50 kg of cement, all complete as per direction of Engineer-in-charge.(DSR-11.44) |
| 50 | Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.Glazed Vitrified tiles Matt/Antiskid finish of size Size of Tile 600 x 600 mm (DSR-11.41A.3.1) |
| 51 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).(DSR-10.28) |
| 52 | Routine Maintenance of road after completion of work :-(A) Carriageway/ Pavement:(a) Potholes, cracks, other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC)(B) Road, Embankment, Cutings, Shoulders, Trees & Plantation :(a) Road Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficent slopes, rain cuts in embankments (E/W), Vegetation growth, Loping of tree branches.(C) Bridges and Culverts:(a) De-Silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/distrubed boulder pitching, breast/toe wall retaining wall, apron flooring, guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-strucures, (f) Any defects in superstructures, raillings, parapets. (g) Wearing coat, (h) Approach slab, (i) Painting & Lettering of No. plates, repair.(D) Repair of Roadside Drains:(a) Brick Work in 1:4, (b) Plaster, (c) CC- 1:2:4.(E) Road Furniture:(a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stone & sign boards. (b) 200 m Stones, (c) Km stones, (d) 5th km stones.Maintenance requriment as per above and Mentioned in Special Condition of Contract for Maintenance.Payment of Maintenance work as Percentage of final Civil Construction Cost : |
| 53 | a) For Ist Year @ 0.00% |
| 54 | b) For IInd Year @ 0.25% |
| 55 | c) For IIIrd Year @ 0.50% |
| 56 | d) For IVth Year @ 0.75% |
| 57 | e) For Vth Year @ 1.00% Please Enable Macros to View BoQ information |