| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in All kinds of soil : |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in Ordinary Rock |
| 3 | Slip clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 4 | Slip clearance In soils; mixed with moorum/ Kankar/ shingle/ boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) (nallah stone) |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone |
| 7 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 8 | Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates |
| 9 | Opening out old wire crates those and re-binding after filling. |
| 10 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 11 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement morta |
| 12 | Dismantling old protection work including cutting of crates and stacking of stones. |
| 13 | supply of Empty Cement Poly Bag. |
| 14 | supply of Crates made of Mesh type 10x12 (D=100 mm) Zn+PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD). |
| 15 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 16 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8) (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with(1:3:6). (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 18 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with (1:3:6). |
| 19 | Dumping stone excluding cost of stones in Horizontal on level |
| 20 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 21 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 22 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. |
| 23 | supply of stone. |
| 24 | Carriage of Soling stone from an avg distance in meters(M) 200 m by H/L. |
| 25 | 300 m by HL |
| 26 | 400 m by HL |
| 27 | 500 m by HL |
| 28 | 600 m by HL |
| 29 | 700 m by HL |
| 30 | 800 m by HL |
| 31 | 900 m by HL |
| 32 | 1000 m by HL |
| 33 | 1100 m by HL |
| 34 | 1200 m by HL |
| 35 | 1300 m by HL |
| 36 | 1400 m by HL |
| 37 | 1500 m by HL |
| 38 | 1600 m by HL |
| 39 | 1700 m by HL |
| 40 | 1800 m by HL |
| 41 | 1900 m by HL |
| 42 | 2000 m by HL |
| 43 | Carriage of sand an bajri from nearby source to road side of work avg distance by MT below 40mm N/S. 10 km by MT |
| 44 | 20km by MT |
| 45 | 30 km by MT |
| 46 | 40km by MT |
| 47 | 50 km by MT |
| 48 | 60 km by MT |
| 49 | Carriage of sand an bajri from nearby source to road sode of work anavg distance by H/L beloew 40mm N/S. 300m by HL |
| 50 | 400 m by HL |
| 51 | 500 m by HL |
| 52 | 600 m by HL |
| 53 | 700 m by HL |
| 54 | 800 m by HL |
| 55 | 900 m by HL |
| 56 | 1000 m by HL |
| 57 | 1100 m by HL |
| 58 | 1200 m by HL |
| 59 | 1300 m by HL |
| 60 | 1400 m by HL |
| 61 | 1500 m by HL |
| 62 | 1600 m by HL |
| 63 | 1700 m by HL |
| 64 | 1800 m by HL |
| 65 | 1900 m by HL |
| 66 | 2000 m by HL |
| 67 | 2500 m by HL |
| 68 | 3000 m by HL |
| 69 | Carriage of cement from nearby source to road side of work an avg distanc by MT. 5 Km by MT |
| 70 | 10 KM by MT |
| 71 | 15 Km by MT |
| 72 | 20 KM by MT |
| 73 | 25 KM by MT |
| 74 | 30 KM by MT |
| 75 | 40 KM by MT |
| 76 | Carriage of cement from nearby source to work site for an avg distance by H/L. 300m by HL |
| 77 | 400 m by HL |
| 78 | 500 m by HL |
| 79 | 600 m by HL |
| 80 | 700 m by HL |
| 81 | 800 m by HL |
| 82 | 900 m by HL |
| 83 | 1000 m by HL |
| 84 | 1100 m by HL |
| 85 | 1200 m by HL |
| 86 | 1300 m by HL |
| 87 | 1400 m by HL |
| 88 | 1500 m by HL |
| 89 | 1600 m by HL |
| 90 | 1700 m by HL |
| 91 | 1800 m by HL |
| 92 | 1900 m by HL |
| 93 | 2000 m by HL |
| 94 | 2500 m by HL |
| 95 | 3000 m by HL |
| 96 | Carriage of Crate avg distt 250 km by MT. |
| 97 | Carriage of Crate avg distt In metres (M) by H/L. 300 m by HL |
| 98 | 400 m by HL |
| 99 | 500 m by HL |
| 100 | 600 m by HL |
| 101 | 700 m by HL |
| 102 | 800 m by HL |
| 103 | 900 m by HL |
| 104 | 1000 m by HL |
| 105 | 1200 m by HL |
| 106 | 1400 m by HL |
| 107 | 1600 m by HL |
| 108 | 1800 m by HL |
| 109 | 2000 m by HL |
| 110 | 2500 m by HL |
| 111 | 3000 m by HL Please Enable Macros to View BoQ information |