| 1 | Supply & Fabrication of 16M x 4M platform as per the design & specification (Annexure A of Scope of Work) . (Inclusive of EPF/CMPF) |
| 2 | ISMB (600 X 210 X 12) Size in MM - Total length about 34 MTR |
| 3 | ISMB (450 X 150 X 9.4) Size in MM- Total length about 34 MTR |
| 4 | ISMB (300 X 140 X 7.7) Size in MM- Total length about 60 MTR |
| 5 | 12 mm MS Plate- approx 66 SQ. MTR |
| 6 | 20 mm MS Plate- approx 1.0 SQ. MTR |
| 7 | M20 x 50 HT Bolt & Nut |
| 8 | Top Bolt with Nut Machine 19 X 300 |
| 9 | Fabrication Cost |
| 10 | Electronic Weighing System as per specfication (Annexure B of Scope of Work). (Inclusive of EPF/CMPF) |
| 11 | 30 Te capacity digital load cell as per specification |
| 12 | 7 segment Digital weighing indicator |
| 13 | Jumbo Display Unit |
| 14 | Junction Box |
| 15 | Computer/PC with accessories as per specification |
| 16 | Furniture & Fixtures for weighing room as per specification |
| 17 | 1.5 Te Air conditioner machine with suitable voltage stabiliser (5 KVA) |
| 18 | 3KVA Constant Voltage Stabiliser / CVT |
| 19 | RFID/ Weighbridge Automation System (with 4 years CAMC after completion of warranty period) (Annexure C of Scope of Work). (Inclusive of EPF/CMPF) |
| 20 | RFID Tags (Temporary) |
| 21 | RFID Tags (Permanent) |
| 22 | Long Range RFID Reader/Writer with pole and mounting |
| 23 | Signal Light for Traffic control |
| 24 | 3 KVA online UPS with batteries and isolation transformer (inbuilt / external) |
| 25 | CVT/ Voltage Stabilizer |
| 26 | 24 port L2 Managed Switch (POE) |
| 27 | 9 U Rack |
| 28 | Printer(Laserjet) |
| 29 | Power Surge Protector |
| 30 | Earthing |
| 31 | Lightening arrestor with all accessories |
| 32 | HDPE pipe |
| 33 | CAT 6 Armoured STP cable |
| 34 | CAT 6 UTP Cable |
| 35 | Armoured Power cable |
| 36 | Battery Stand |
| 37 | Sockets |
| 38 | Connectors for wire |
| 39 | Plug (6/WB) |
| 40 | CCTV Survillance System (Annexure D of Scope of Work). (Inclusive of EPF/CMPF) |
| 41 | 5 MP IP Bullet Camera |
| 42 | 5 MP IP Dome Camera |
| 43 | Monitor 32 inches |
| 44 | NVR (4 channel) |
| 45 | Cat-6 STP cable |
| 46 | 10meter tubular swagged pole for mounting CCTV cameras |
| 47 | Lightning Arrestor & Earthing System (Annexure E of Scope of Work). (Inclusive of EPF/CMPF) |
| 48 | Supply of 16 mtrs long tubular pole including lightning arrestor . |
| 49 | Transporting of 16 mtrs long tubular pole . |
| 50 | Erection of 16 mtrs long tubular pole with cc foundation . |
| 51 | Supply and drawing of 10 sqmm aluminium cable from lighting arrestor point to earth pit . |
| 52 | Supply and fabrication of difference type of MS bracket . |
| 53 | Supply and drawing of GI Wire for making of net wire . |
| 54 | Supply and fixing of chemical Earth pit with providing required materials .a ) Supply of Earthing , electrode , specification for one set asb ) Length = 3000mmc ) Outer dia = 80mmd ) Inner dia = 40 mme ) Connection terminal = 14 mmf ) Pipe = dual GI |
| 55 | Supply of backfill chemical earth resistance enhancing compound ( 25 kg in each bag ) 2 bag each hole . |
| 56 | Supply and drawing of 16 sqmm 2 core armoured aluminium cable for neutral earthing . |
| 57 | Labour cost for earth digging construction of earth , connection work and installation . |
| 58 | Testing and commissioning of earth pit as per IS standard . |
| 59 | Supply of Portable Cabin (Annexure F of Scope of Work). (Inclusive of EPF/CMPF) |
| 60 | Supply of Portable Cabin |
| 61 | Construction of Foundation for Portable cabin for weighbridge(Annexure G of Scope of Work). (Inclusive of EPF/CMPF) |
| 62 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 63 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 64 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 65 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) |
| 66 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. |
| 67 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 68 | 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) |
| 69 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 70 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 71 | Supplying and laying polythene sheet (125 micron) below RCC or PCC |
| 72 | Construction of Weighbridge Foundation and Weighbridge Ramp(100 Te)(Annexure H of Scope of Work)(Inclusive of EPF/CMPF) |
| 73 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 74 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift |
| 75 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 76 | Supplying 400 G polythene sheet |
| 77 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 78 | Providing and laying in position specified grade of RCC, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 79 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 80 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.:Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 81 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete |
| 82 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) |
| 83 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) |
| 84 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar work |
| 85 | Commissioning & Training for Road Weighbridge. (Inclusive of EPF/CMPF) |
| 86 | Commissioning and Training for Road Weighbridge |
| 87 | Annual Maintenance Contact (comprehensive basis) Road Weighbridge(Annexure-I of Scope of Work). (Inclusive of EPF/CMPF) |
| 88 | AMC(comprehensive basis) of weighbridge for 4 years after completion of one year compulsory warranty or guarantee period for one weighbridge |
| 89 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |