|
| 1 | SCHEDULE 'A' SECTION-I (BUILDINGS/STRUCTURE WORKS) |
| 2 | Construction of block of ‘SINGLE ACCN FOR 03 JCOs WITH SCOOTER & Car Parking (D/S)’ complete all as specified and shown on drawings. |
| 3 | SCHEDULE ‘A’ SECTION-II (PART-I) (INTERNAL WATER SUPPLY WORKS) |
| 4 | Lump sum price worked out by the Contractor for “Internal Water Supply Works” as listed in Schedule ‘A’ Section-II (Part-I). |
| 5 | SCHEDULE ‘A’ SECTION-II (PART-II) (INTERNAL WATER SUPPLY WORKS) |
| 6 | Supply & fixing 15mm bore Angle stop valve, fancy type with long shank and cup of cast copper alloy chromium plated, screwed down, high pressure with crutch or butterfly handle, screwed both ends for iron pipe or for union complete all as specified & as directed. |
| 7 | S&F wall mixer, telephonic type, brass, chromium plated, fancy type, with capstan head handles with lettered 'hot' and 'cold', screwed down high pressure, including CP brass wall flanges and necessary extension nipples screwed for 15mm bore pipe connection, complete all as specified as directed. |
| 8 | S&F Centre hole mixer for mixing hot & cold water for wash hand basin, cast copper alloy, with dual capstan heads, chromium plated, screwed down high pressure, with lettered 'Hot' & 'Cold' with long screwed shanks and fly-nuts, screwed for iron pipe suitable for 15mm bore, complete all as specified as directed. |
| 9 | S&F brass chromium plated Hand Shower (Health Faucet) with 8mm dia & 1.20m long stainless steel braided flexible tube and wall hook suitable for fixing to supply pipe of 15mm bore complete all as specified and as directed. |
| 10 | Subtotal {Total of Schedule 'A' Section-II (Part-II)} |
| 11 | SCHEDULE ‘A’ SECTION-III (PART-I) (INTERNAL ELECTRIFICATION WORKS) |
| 12 | Lump sum price worked out by the Contractor for “Internal Electrification Works” as listed in Schedule ‘A’ Section-III (Part-I). |
| 13 | SCHEDULE ‘A’ SECTION-III (PART-II) (INTERNAL ELECTRIFICATION WORKS) Please Enable Macros to View BoQ information |
| 14 | SCHEDULE ‘A’ SECTION-III (PART-II) (INTERNAL ELECTRIFICATION WORKS) Please Enable Macros to View BoQ information |