|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for Lintels, beams, plinth beams, girders, bressumers and cantilevers including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 4 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering 1:2:4 (1 cement: 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Mild steel and Medium Tensile steel bars including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 6 | 6 mm cement plaster of cement mortar mix 1:3 a curing complete including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 7 | Repairs to plaster of thickness 12 mm to 20mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in charge With cement mortar 1:4 including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 8 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including water thinnable priming coat with cement primer including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 9 | Providing and fixing 10mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding, and joints filled with acid and/or alkali resisting cement as per IS: 4457, including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 10 | In flooring on a bed of 10mm thick mortar 1:4 (1 acid proof cement: 4 coarse sand) |
| 11 | In dado/skirting on 12mm thick mortar 1:4 (1 acid proof cement: 4 coarse sand) |
| 12 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 13 | Applying priming coat:With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. |
| 15 | Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm) including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. Please Enable Macros to View BoQ information |