|
| 1 | Providing and fixing C.P Brass bib tap with capstan head (i) 15mm dia including all leads and lifts, as per HPPWD, specification of 1990 Volume-I, as directed by the Engineer-In-Charge. 6 1097 Each 6583 |
| 2 | Providing and fixing high pressure PVC spigot and socket, waste and ventilating pipes ISI marked including fixing with approved adhesive etc. Complete 30 315 Rmt 9446 |
| 3 | Providing and fixing to wall ceiling and floor galvanised mild steel tubes(Medium grade) tube fittings and clamps including making good the wall, ceiling and floor (i) 15mm nominal bore including all leads and lifts, as per HPPWD, specification of 1990 Volume-I, as directed by the Engineer-In-Charge. |
| 4 | Providing and fixing C.P steel grating for wash basin and sink including carriage of materials within all leads and lifts by all means & other incidentals. i) 100 mm dia 8 79 Each 635 |
| 5 | Door Bends of required degree (any radius) :-With oval access door insertion rubber washer 3 mm thick, bolts and nuts complete including carriage of materials within all leads and lifts : |
| 6 | Providing and fixing vitreous china wash basin with single hole for pillar tap with C.I. or M.S. brackets painted white including cutting holes and macking good the same but excluding fittings FLAT BACK category No 1025 including carriage of all labour equipments and materials to various location through all modes of transportation in all leads and lifts, including all incidental charges |
| 7 | Glazing with glass panes of 5.50mm thickness (weight not less than 13.75 kg/ |
| 8 | Providing and fixing aluminium handles anodized transparent or dyed to required colour & shade with necessary screws etc. complete. |
| 9 | Applying two coats of wood preservative on new wood and wood based surfaces after and including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting. |
| 10 | Polishing two coats with french polish on new wood and wood based surfaces to give an even surface including cleaning the surface of all dirt, dust, and sand papered smooth and including a coat of wood filler. |
| 11 | Providing and fixing vitreous China wash down, water closet(European Type W.C Pan) with integral P or S trap including jointing the trap with soil pipe in cement mortar 1:1 (1cement: 1sand)(seat and cover to be measured and paid for separately (i) Anglo Indian including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge |
| 12 | Providing and laying spartic ceremic tiles 5.5mm.thick in flooring (300 x300mm. size)treads of steps laid on a bed of 12mm. thick cement mortar 1:3(1cement: 3 sand) finished with flush pointing in white cement. 9.00 2500.00 sqm 22500 |
| 13 | Providing and fixing plain lining with tongued and groved jointing and screws ( frame work and cover fillets to be measured a… |
| 14 | Providing and fixing anodised aluminium work for door, window, ventilators and partitions with extruded built up standard tubular and other sections of approved make conforming to IS 733 and IS 1285 anodised transparent or dyed to required shade according to IS 1868. (Minimum anodic coating of grade AC 15) fixed with rawlplugs and screws or with fixing clips, or with expansion hold fastners including necessary filling up of gaps at junctions, at top, bottom and sides with required PVC/neoprene felt etc. Aluminium sections shall be smooth, rustfree, straight, mitred and jointed mechanically where ever required including cleast angle, aluminium, snap beading for glazing/panelling C.P. brass/stainless steel screws. All complete as per architectural drawings and the directions of Engineer-in-Charge. |
| 15 | Providing Prepainted G.I sheet roofing with galvanized iron J or L hooks boltd and nuts 8mm diameters with bitumen and G.I limpet washers filled with white lead completed excluding the cost of purlins, rafters and trusses(i) 0.63mm thick sheet including all leads and lifts, as per HPPWD, specification of 1990 Volume-I, as directed by the Engineer-In-Charge. |
| 16 | Steel work welded in built up sections, trusses and framed work including cutting hoisting, fixing in position and applying a priming coat of lead paint in beans joints channels angles tees flats with connection plates or angle cleats as in main and cross beams, hip and jack rafters, purlins and connected to common rafters and the like as per specification. |
| 17 | Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer. |
| 18 | Providing and laying concrete 1:3:6 in foundation complete including all leads and lifts Please Enable Macros to View BoQ information |