| 1 | Safe carriage of the following material from Store Centre /JE's store to work site including loading and unloading at both ends :- |
| 2 | PCC Poles 8.5/9 /11 Mtr long and STP 11/13 Meter Long. |
| 3 | ACSR Weasel/Dog conductor/ABC. |
| 4 | 11 KV Pin insulator with pin |
| 5 | 11 KV Disc insulator with fitting |
| 6 | 33 KV Pin insulator with pin |
| 7 | 33 KV Disc insulator with fitting |
| 8 | Earthing Set complete. |
| 9 | Stay Set complete |
| 10 | 100/63/25/16/10 KVA Transformer |
| 11 | 33 & 11 KV X-arm |
| 12 | Dismantling of the line by :- |
| 13 | Removing of ACSR Weasel/Dog etc conductor from all phases on line, making bundle and stacking at a safe place. |
| 14 | Dismentaling/cutting of PCC/ST Poles. |
| 15 | Single support with PCC Poles 8.5/9 /11 Mtr long and STP 11/13 Meter Long. :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) complete work as per RESSPO Norms. |
| 16 | Double pole structure with PCC Poles 8.5/9 /11 Mtr long and STP 11/13 Meter Long. :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole complete work as per RESSPO Norms. |
| 17 | Grouting of pole by providing sand, cement and concrete as per RESSPO norms. Complete work as per RESSPO norms |
| 18 | Fixing, tightening and nozelling of stay wire with stay rod and stay insulators with the pole of required tension by providing stay clamps, nuts, bolts and all other materials and grouting of stay rod by providing sand, cement and concrete as per RESSPO norms. Complete work as per RESSPO norms |
| 19 | Earthing of support with MS Earth Rod of (20x2500)mm. long including excavation of pit and driving MS Rod 3.0M apart from support and 0.5M below the ground level and connecting below the earth electrodes with the help of G.I. Wire No.6 SWG tightening with nuts and bolts. |
| 20 | Laying, sagging, stringing and binding of ACSR Weasel/Dog/ABC Conductor with all other accessories on pole as per RESSPO Norms. |
| 21 | Opening H.T./L.T. connection and dismounting of damaged 100/63/25/16/10 KVA transformer from double/single pole. Safe carriage of it from site to store center Majhola Moradabad with loading and unloading at both ends. |
| 22 | Mounting and installation of 100/63/25/16/10 KVA transformer on double/single pole, making H.T./L.T. connection, complete work as per RESSPO norms. |
| 23 | Straightening of tilted pole as per resspo norms. |
| 24 | Replacement and fixing of 33 & 11 KV X-arm on poles by providing X-arm holding clamp. Complete work as per RESSPO norms. |
| 25 | Replacement & fixing of 33 & 11 KV Pin insulator on pole. Complete work as per RESSPO norms. |
| 26 | Replacement & fixing of 33 & 11 KV Disc insulator on pole. Complete work as per RESSPO norms. |
| 27 | Resagging of conductor in H.T./L.T. line as per norms.Complete work as per RESSPO norms. (01 span is approx.50 meter) |
| 28 | Trimming, chopping of tree branches near the H.T./L.T. line. |
| 29 | Carriage of following from work site to Store Centre Majhola including loading and unloading at both ends :- |
| 30 | ST pole scrap and other iron scrap. |
| 31 | ACSR Weasel/Dog conductor scrap. Please Enable Macros to View BoQ information |