| 1 | Memugham 160 KVA transformer area re conductoring with standirdization |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading |
| 3 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors inr olls properly. |
| 4 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place |
| 5 | Dismantling (withoutdamage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 6 | Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc. for one km additional conductor (ACSR Rabbit) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking Place. |
| 7 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSRRabbit) on existing LT line hererealignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 8 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessaryand conveyance of all materials (except poles) fromstacking place.Stringing, tensioning, fitting cross arms, insulators and binding, giving jumperconnection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever NECESSARYand conveyance of all materials (except poles) from stacking place. |
| 9 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms,insulators and stacking the conductors in rolls properly |
| 10 | Providing End Caps |
| 11 | Erection of suspension clamp of any size |
| 12 | Erection of Anchor clamp /dead end clamp of any size |
| 13 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16Sq.mm |
| 14 | Installation of Insulation piercing connector for main to service line main :16-95sqmm, Tap 16-95 sqmm. |
| 15 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle) |
| 16 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 17 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit inordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing) |
| 18 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 19 | Renewal of existing damaged/old LT Strut of any type with new PSC strut in place including excavation of pit, erection of new strut, backfilling, consolidating, dismantling and refitting of all items and conveyance of all materials except pole. |
| 20 | Transporting one LT PSC pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (normallylimited to 0.3km) |
| 21 | Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 22 | Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 23 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 24 | Renewal of existing damaged/old LT PSC/RCC (three phase line) pole withnew PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 25 | Renewal of existing damaged/old LT TW/RSJ/Rail (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. And conveyance of all materials except pole. |
| 26 | Renewal of existing damaged/old LT TW/RSJ/Rail (three phase line) pole with new PSC pole in place including excavation of pole pit, erection of newpole, backfilling pit and refitting of all items except street light fitting etc. And conveyance of all materialsexcept pole |
| 27 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work |
| 28 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work |
| 29 | Providing Stay for LT poles including digging & back filling pit in ordinary soil |
| 30 | Renewal of existing damaged/broken old LT stay in existing stay rod. |
| 31 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 32 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35Sq.mm to the LT AB cable of Standard size |
| 33 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking Place. Please Enable Macros to View BoQ information |