| 1 | Dismantling (without damage) one km 11 KV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 2 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 3 | Fitting one set (3No.) 11KV LA and giving connections excluding earthing. |
| 4 | Fitting and providing one HT Fly stay for 11KV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 5 | providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 6 | Providing one Coil earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 7 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite |
| 8 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole including conveyance of materials |
| 9 | Providing concrete muffing of size 0.45x0.45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 10 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading&unloading charges. |
| 11 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transporting by any vehicle) |
| 12 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transporting by any vehicle) |
| 13 | Insertion of one HT PSC pole in existing OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 14 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 15 | Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulators, bindig etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 16 | Dismantling of 1.1KV Aerial bunched cable of size 1x25+1x25 sqmm with bare/insulated Messenger from existing poles |
| 17 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 18 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. Complete. |
| 19 | Stringing of 1.1 KV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmm with bare/insulated Messenger through existing poles. |
| 20 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 21 | Additional rate for excavation of one Pit for HTPole/HT Stay in Laterite. |
| 22 | Additional rate for excavation of pit for A type pole in Laterite. |
| 23 | Additional rate for excavation of one pit for HT pole/HT Stay in Soft Rock. |
| 24 | Fitting and providing one HT stay for 11 KV pole, including digging and back filling pit in ordinary soil. |
| 25 | Providing bridging at Cut points for 3 PH 11KV line with XLPE Insulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors. |
| 26 | Additional rate for excavation of one pit for HT Pole/HT Stay in Hard Laterite. |
| 27 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 28 | Fitting one Additional 2.4/3m channel cross arm (75x40x6mm), in existing 11KV DP including conveyance of materials. |
| 29 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT line. |
| 30 | Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT line. |
| 31 | Providing one Earth using GI earth pipe of size 38.1 mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 32 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete |
| 33 | Fitting one set AB switch on existing DP , giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 34 | Fitting and providing one strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 35 | Stringing of one km 3 PH 11KV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. Please Enable Macros to View BoQ information |