| 1 | Reconductoring LT line |
| 2 | Reconductoring (changing) one km LT single phase 2 wire OH Copper/old AAC/ACSR conductor line with new ACSR Rabbit conductor including conveyance of materials to and from the stacking place. |
| 3 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 4 | Renewal of existing damaged/old LT TW/RSJ/Rail (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 5 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fittingetc. and conveyance of all materials except pole. |
| 6 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 7 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of all materials. |
| 8 | Straightening one slanted LT pole after unbinding the line and binding the line after work |
| 9 | Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 10 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle) |
| 11 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 12 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 13 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 14 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 15 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 16 | Erection of suspension clamp for LT ABC of any size |
| 17 | Installing One No. Insulation piercing connector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 18 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 19 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 20 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 21 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 3 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 22 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work |
| 23 | Dismantling one ordinary street light/CFL/LED fitting from existing pole cleaning, rewiring, repairing/replacing the holder, changing bulbs and refitting the same in position and giving connection. |
| 24 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 25 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 26 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 27 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 28 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 29 | Additional rate for providing one F top bracket complete, on any type of HT pole. |
| 30 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 31 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 32 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 33 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. Please Enable Macros to View BoQ information |