| 1 | Earthwork in excavation by mechnical means in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5 mtr in width) and for shafts , wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1mtr for cutting edges, disposed earth is to be leveled and neatly dressed in.All kind of soil |
| 2 | P/L of stone solign duly hand pacekd including watering dressing and ramming with all carraiges loading unloadin and staking etc complete. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforcement for RCC work including necessary cuttings, bindings and placing in position including cost of binding wire incl all carraige etc complete job |
| 7 | Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement lime mortar 1:1 :6 ( 1 cement : 1 limeputty : 6 fine sand) |
| 8 | Centering & Shuttering using kitply including strutting propping etc & removal of form work including all leads, lifts, costs & carriages upto site of work complete in Foundation footings, Basis of colums, Plinth beams, walls & Mass concrete |
| 9 | Centering & Shuttering using kitply including strutting propping etc Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 10 | providing wood work in frames of doors windows clerestory windows and other frames wrought framed and fixed in posiiotn with hold fast lungs of required dia and length of imported wood (KD) complete job. |
| 11 | 15 mm cement plaster on the rough side of single or half brick wall of 1:6 mix (1 cement 6 fine sand) |
| 12 | providing and fixing glazed shutters for doors windows and clestory windows using 3.5 mm thick float glass panes including ISI marked MS pressed butt hinges bright finished of required size with necessay screws 30 mm imported KD wood |
| 13 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.40mm thick with 20 mm nominal size stone aggregate |
| 14 | Applying Priming coat with ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood)Door/window frames and Shutters grills gates etc |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture to given and even sjhade two or more coats on New work Over an under coat of new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture all complete job |
| 16 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete 2 mm thick |
| 17 | finishign walls with waterproof cement paint of approved brand and manufacture of required shalde to give an even shade on new works applied @3.84kg/10sqm. |
| 18 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 19 | Structural steel work welded in built up sections truss and framed wor including cutting hoisting fixing in position and applying a priming coat of approved steel primer incl all carriage etc complete job |
| 20 | providing and fixing of ply board 12 mm thick of approved quality and brand incl frame wooden work of required sectio and necesay screws and nails complete with wooden cornice of required section. |
| 21 | providing corrugated GS sheet rofing incl vertical /curved surface fixied with polymer coated J or L hooks bolt and nuts 8 mm dia with buitmen and GI limpet washers or with GI limpet washers 50 mm thick all complete job. |
| 22 | providing riddges or hips of with 60 cm overall width plain GS sheets 0.50 mm fixed with polymer coated J or L hooks bolts and nuts 8 mm dia GI limpet and bitument washers complete job. |
| 23 | providing and fixing concield locks |
| 24 | handles 6\\" |
| 25 | handles 4\\" |
| 26 | T bolts 4\\" |
| 27 | T bolts 6\\" |
| 28 | carriage of sand /bajree MT 15 km |
| 29 | brick for 210 km from Sringagar Please Enable Macros to View BoQ information |