| 1 | Earthwork in excavation in foundation in hard soil with initial lead and lift including rough dressing and levelling the bed and depositing the excavated earth at places away from work site including cost, conveyance, royalty and taxes of all materials, labour, T & P and dewatering if required for the work etc. complete and as per specification and direction of the Engineer -in-charge.Compound Wall & Gate |
| 2 | Providing & filling manualy with aproved quality of sand in layers not exceeding 150mm thick including watering ramming to proper density with cost,conveyance, royality, taxes of all materials and cost of all labour & T & P as required for the item of work including cess etc complete as per specification & direction of Engineer-in-charge.Compound Wall & Gate |
| 3 | Cement concrete of proportion (1:3:6) in foundation & floors using 4 cm (3/2\\") size clean hard black broken granite stone metal of approved quality & from approved quarry including hoisting,lowering & laying concrete in layers not exceeding 15 cm (6\\") thick to the required level ramming watering & curring etc. complete including cost & conveyance of all materials with alltaxes & royalties & all labour wuth T&P required for the work etc. complete including dewatering if required as per specification & direction of the Engineer-in-charge.Compound Wall & Gate |
| 4 | Fly ash brick masonary in cement mortar (1:6) in foundation & plinth & basements & ornamental flower bed plinth moulding & similar such types of works with all necessary projections using fly ash bricks of 9\\"/10\\" size having a crushing strength of not less than 75 kg/cm2 including splays cutting circular moulding chamfering & cobelling watering & curing after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials & labour required for the work with all taxes & royalties etc. with all T&P complete in all respect as per specification & direction of the Engineer-in-charge.Foundation & Plinth (1 : 6)Compound Wall & Gate |
| 5 | Superstructure (1:6)Compound Wall & Gate |
| 6 | Providing Reinforced cement concrete M20 Grade with 20mm & downgrade size clean crusher broken granite chips aggregate of approved quality from approved quarry including hoisting, lowering & levelling in position to required level in each layer not exceeding 15cm thick including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering if necessary with cost, conveyance taxes royalty labour of all materials and including hire and running charges of machinaries T&P required for the work including supplying and working of pumps and cess as per the specification and direction of Engineer-in-charge. Column base & footing |
| 7 | Column |
| 8 | Plinth beam |
| 9 | Straighting bent up or coiled rods cutting,bending,cranking,hooking,welding or jointing(if required) the M.S. rods or tor steel & binding wires & tying the grills hoisting,lowering & placing in proper position as required for RCC works with cost,conveyance & taxes of MS rods or tor steel & binding wires of 18 to 20 gauge & labour withy all T&P required for the work etc. complete in all respect as per specification & direction of the Engineer-in-charge. (Weight of binding wires will not be considered for payment & payment will be made on weight of M.S. rods or tor steel only).Compound Wall & Gate |
| 10 | 12 mm (1/2\\") thick cement plaster (1:6) finished smooth to outside brick walls after raking out the joint including watering & curing with cost & conveyance of all materials & labour with T&P required for the work with all taxes & royalties etc. complete in all respect as per specification & direction of the Engineer-in-charge.Compound Wall & Gate |
| 11 | 16 mm(5/8\\") thick cement plaster (1:6) finished smooth to inside surface of brick walls after raking out the joint including watering & curing with cost & conveyance of all materials & labour with T&P required for the work with all taxes & royalties etc. complete in all respect as per specification & direction of the Engineer-in-charge.Compound Wall & Gate |
| 12 | Fixing of tiles in fioors,walls,treads landings etc on 25mm thick bed of c.m(1:1) with neat cement slury mixed with pigment to match the shade of the tiles including cost of tiles etc complete(Granite Tile)Compound Wall & Gate |
| 13 | Fitting & Fixing of Steel letter on Overhead GateCompound Wall & Gate |
| 14 | Supplying and fixing of stainless steel GateS,Grills etc made out of 304 stainless steel materials with a minimum of 10.5% chromium content by mass and maximum of 1.2% carbon by mass with all materials ,electrically welded and including labour. Compound Wall & Gate |
| 15 | Wall painting two coats with any approved quality of Weather seal coat over one coat of Primerwith any approved shade including cost of paint on New Plastered surface of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete.Compound Wall & Gate Please Enable Macros to View BoQ information |