|
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: SUPERINTENDING ENGINEER,MINOR IRRIGATION DIVISION, JHRSUGUDA Name of Work: Improvement to Sagarkata (D/W) M.I.P of Laikera block of Jharsuguda district under Improvement to Diversion Weir scheme for the year 2025-26. Contract No: SEMID JSD 15 OF 2025-26. Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category . TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Cleaning shurb jungle and uprooting strump and small bushes and trees of below 90cm grith on pre-measurement and depositing the debries clear of work site with all lead and lift complete as per directed by the EIC. |
| 3 | Excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC within an initial lead of 1 km. from the place of excavation complete. |
| 4 | Filling in foundation and plinth with sand watering and ramming as directed by the EIC. |
| 5 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the EIC. |
| 6 | Cement Concrete M15 with 20 mm Size crusser broken granite metal & down graded of approved quality quarried and free from weathered skin including lifting the materials lowering, hoisting and laying the concrete for required level with curing ramming finishing etc. complete in all respect to proper slope and level with cost, conveyance, royalty and other taxes of all materials etc. complete including dewatering as and when necessary as directed by the Engineer-in-Charge. |
| 7 | Cement Concrete M20 grade with crushed granite coarse aggregate of 20 mm down grade size in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge. |
| 8 | Providing and removing rigid smooth centering and shuttering for C.C./R.C.C.intel work including cost and conveyance of the materials required for the work complete in all respect as directed by the Engineer-in-Charge. |
| 9 | Straightening, cutting, bending, binding and tying the grills and placing them in position of approved design includign cost and conveyance of TMT bar(HYSD) and binding wire 18 to 20 gauge complete as directed by the Engineer-in-Charge. |
| 10 | Excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC within an initial lead of 1 km. from the place of excavation complete.(for filling earth) |
| 11 | Rough stone dry packing in aprons and revetments to all heights with hard stone of size 30cm and above, weight not less than 40kg/piece including cost,conveyance, royalty to proper slope and level complete in all respect as directed by the Engineer-in-Charge. |
| 12 | Providing weep holes in brick masonary/ plain/ reinforced concrete abutment, wing wall with 100 mm dia AC pipe, the full width of the structure with towards drawing foce. Complete as technical. |
| 13 | laying and fixing position of RCC spun pipes with collar jointwith cement mortar(1:3) complete including cost of spun pipes and collars. |
| 14 | Dismantling brick or stone masonary in c.m. under 30m. Ht. including stacking the useful material for reuse and removing the debris within 50m. Lead including stacking the useful materials for reuse and removing the debris within 50m. lead |
| 15 | Dismantling and removinfg cement concrete including stacking the useful materials for reuse and removing the debris within 50m. Lead per 1 cum Total in Figures 3623673.17 23 INR Thirty Six Lakh Twenty Three Thousand Six Hundred & Seventy Three and Paise Seventeen Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |