| 1 | PART - A WORK Drain out of transformer oil in empty oil drums from Exiting 20 MVA transformer to get required level up to 03 KL at 132 kV Sub-Station Shikarpur |
| 2 | Complete dismantling of the accessories of Exiting 20 MVA, 132/33 KV Transformer at 132 KV Sub-Station Shikarpur after opening of jumpers, removal of earthing and opening of cables & connection, removal of all radiators, conservator tank, oil pipe lines, bushings, etc. to complete the jobs satisfactorily including Blanking, nuts and bolts all other T&P shall be arranged by the contractor at him own cost. |
| 3 | Shifting/Dragging of oil filled Exiting 20 MVA Transformer from Existing place to near safe place at 132/33 KV Sub-Station Shikarpur distance upto 20 Mtr. |
| 4 | Additional Shifting 100 Mtr. every 5 Mtr. per job. |
| 5 | Shifting of Transformer accessories at safe place as per directions of supervising engineer |
| 6 | Shifting of main tank of New 40 MVA Transformer from unloading point to the plinth up to 20 Mtr distance including turning of tank if required including all T&P and labour required to complete the job satisfactorily |
| 7 | Additional Shifting 100 Mtr. every 5 Mtr. per job. |
| 8 | Complete erection of New 40 MVA 132/33 KV Transformer by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making control cables connection, Buchholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of work |
| 9 | Dismantling of 120 kV L.A., by connecting of earthing strip joining of jumpers and erection of structures (ALP, BCT) etc. along with associated substation structure required after shifting of newly replaced 40 MVA, 132/33 KV Transformer. |
| 10 | Re-erection of 120 kV L.A., by connecting of earthing strip joining of jumpers and erection of structures (ALP, BCT) etc. along with associated substation structure required after shifting of newly replaced 40 MVA, 132/33 KV Transformer. |
| 11 | Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating the T/F oil through Centrifuging machine and taking the BDV value of the oil periodically till the required value is achieved. Approx 19KL. |
| 12 | Variable frequency Tan Delta Test & Winding registance Test of 40 MVA 132/33 KV Transformer with appropriate & recently calibrated kit. |
| 13 | Erection of following equipment as per instruction in manual of various equipment’s and technical specification including shifting of material/equipment from store to erection site including all other associated works to complete the job satisfactorily. (A) 33 KV VCB ( 2000/.01 A ) |
| 14 | (B) 36 KV CTs (800-400/200/1A) |
| 15 | (C) Junction Box, 36kV CT |
| 16 | (D) 30 KL Surge Arrestor |
| 17 | Earthing of main tank at 2 points of new 40 MVA T/F by using 75x10 mm size Flat & it's jointing with already laid earth mat as per guideline & tech. specification |
| 18 | Earthing for HV & LV Neutral and to connect it with already laid earth mat and also from neutral bushing of new 40 MVA Transformer |
| 19 | Electrical connection of 40 MVA Transformer with laying of cable and Termination in between WTI, OTI buchhalz relay, cooling fans, OLTC, Marshaling box etc. with proper feruling as per drawing |
| 20 | Re-placement of new RTCC panel of this new 40 MVA TIF in control room at 132 KV S/S DEBAI including its Termination & fitting and laying of control cable if required as per site requirement and its connections. |
| 21 | Painting of MS flat of different size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work. (A) MS Flat of size 75x10 mm |
| 22 | (B) MS Flat of size 50x6 mm |
| 23 | (C) MS Flat of size 25x6 mm |
| 24 | Jumpring of 40 MVA Transformer HV/LV side cutting of conductor and tightening of conductor with connector |
| 25 | Erection of 120 Watt LED light fitting complete of standerd make as Bajaj/Havells/Crompton make with MCB box and GI bend pipe using control cable of size 4cx2.5sqmm. |
| 26 | PART - B SUPPLY. Bimetallic terminal connector for 40MVA T/F HV side bushing rod 30 mm dia made of aluminum alloy LM-6 suitable for ACSR Zebra /Moose/Panther conductor of matching with bushing rod complete with hot dip galvanized nut & bolts as per technical specification. |
| 27 | Bimetallic terminal connector for 40 MVA T/F LV side bushing rod 30 mm dia made of aluminum alloy LM-6 suitable for Twin Zebra /Moose conductor matching with bushing rod complete with hot dip galvanized nut & bolts as per technical specification. |
| 28 | 5 Bolted Type PG clamp suitable for Panther to Panther conductor Complete with HDG nut bolt & washer as per technical specification. |
| 29 | Bimetallic 120 KL LA Clamp made of aluminum alloy LM-6 for panther conductor with HDG nuts & bolt and washer as per Technical Specifications. |
| 30 | Bimetallic 33 KV CT clamp made of aluminum alloy LM-6 for Twin Zebra conductor with HDG nut & bolts and washer as per Technical specification. |
| 31 | 33 KV Circuit Breaker clamp suitable for Twin Zebra conductor complete with hot dip galvanized nut, bolts and washer as per technical specification. |
| 32 | 33 KV LA clamp suitable for Panther conductor complete with hot dip galvanized nut, bolts and washer as per technical specification. |
| 33 | Supply of nut & bolt with 01 No spring and 01 No plane washer of different size. (A) 16x35mm |
| 34 | (B) 16x40mm |
| 35 | (C) 16x45mm |
| 36 | (D) 16x90mm |
| 37 | (E) U Bolt ,20mm |
| 38 | (F) Washer,4mm |
| 39 | FIRE EXTINGUISHER. Portable mechanical foam(45/50ltr)with all accesory |
| 40 | CO2 type(22.5 KG) |
| 41 | CO2 type(9/11 KG) |
| 42 | Suply of sand bucket as per technical specifications |
| 43 | New Generation Energy & Enviroment Friendly long Alluminium Outdoor beam Street Light with High Power 120 Watt LED Light With Complete Fittings of standerd make as Bajaj/Havells/Crompton make with MCB box and sutable size of GI bend pipe. |
| 44 | Submission of inspection charges and processing fees for Electrical Safety clearance from Directorate of Electrical Safety , Uttar Pradesh for carrying out inspection of transformer , T/F HV Side bay & T/F LV Side bay and obtaining charging clearance as per statuary norms( To be re-imbursed on actual basis). Please Enable Macros to View BoQ information |