| 1 | Demolishing of cement concrete manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. |
| 2 | Dismantling old Plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping groud with in 50 meters lead complete in all respect and to the entire satisfaction of the Engineer-in-Charge. |
| 3 | Earthwork in excavation by manual means (Hydraulic excavator) / manual means in foundation, trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50m complete in all respect and to the entire satisfaction of the Engineer-in-Charge |
| 4 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. |
| 5 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all lead and lifts including restoration of unmettalled surfaces to its original condition complete in all respect and to the entire satisfaction of the Engineer-in-Charge. |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for : |
| 7 | Foundations, footings, bases for columns, mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 8 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. |
| 9 | Edges of slab and break in floor and walls complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 10 | Suspended floors, roofs, landings, balconies and access platform complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 11 | Extra Allowance for formwork in concrete lining in: |
| 12 | Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. |
| 13 | In sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. |
| 14 | Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 15 | Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement excluding the cost of centering , shuttering within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 16 | Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of centering and shuttering for all work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 17 | All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 18 | In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement excluding the cost of centering , shuttering within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 19 | Providing and laying in position cement concrete 1:1.5:3 (1 Cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 20 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in : |
| 21 | All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 22 | In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 23 | In beams, suspended floors, roofs having slope upto 15 degree landing , balconies, shelves, chajjas, lintel , bands, plain window sills, staircase and spiral stair cases above plinth level up to floor five level , excluding the cost of centeringb , shuttering , finishing and reinforcemen with 1:1.5:3 ( 1 cement : 1.5 coarse sand:3 graded stone aggregates 20 mm nominal size) complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 24 | Providing cement concrete lining 15 cm thick or less for irrigation channels, using cement concrete 1:2:4 (1 cement2 sand :4 stone aggregate 20 mm nominal size) in: |
| 25 | Bed complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 26 | Side slopes complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 27 | Cement concrete flooring 1:2:4(1 cement :2 coarse sand :4 graded stone aggregates) finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 28 | 20 mm cement plaster of mix, complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 29 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS:16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter 2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 30 | Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 31 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 32 | Providing and Laying Stone/ Boulder filling behind the Retaining wall, also under floor and upstream of i/ gallery/ under floor etc.complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 33 | Providing and fixing CI Sluice Valve of following dia & class of Leader / Kartar / Kirloskar make with MS Flange of Table 5 as per IS 6392-1971 & welding of MS Flanges in two layers on both faces complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 34 | 150 mm dia, PN-1.0 (10.2 Kg/cm²) |
| 35 | Providing, laying, jointing , commissioning and testing in trenches (to level or grade) GMS tubes confirming to IS : 1239: 2004 of 150 mm dia, medium class with all necessary fittings conforming to IS specification capable to withstand the required hydraulic test pressure as per IS code in random length of 6.00 mtrs. including flushing , cleaning and hydraulic testing of pipe complete in all respect within all leads and lifts and to the entire satisfaction of Engineer-in-Charge. |
| 36 | Providing, laying, jointing, testing & commissioning at site in trenches bevelled ended BIS marked MSERW pipes 200 mm dia (4.80mm wall thickness) of various grade conforming to IS/ISO-3183-2012 L260 or X42 or its equivalent specifications latest with upto date amendments of following dia with upto date amendments having wall thickness and per Rmt weight as mentioned below & capable of withstanding required test pressure as prescribed in BIS code in random lengths of 6 to 7 mtr. The pipes ends shall be bevelled suitable for butt welding including the cost of jointing with butt welding conforming to IS 816-1969 or latest as applicable ends with upto date amendments (leak proof) in three layers at site of work with welding rods of standard make and all allied accessories whatever required for welding at site, tail pieces, tees, bends and other specials manufactured from parent pipes as applicable to the particular reach & of approved specification as per site conditions and cutting of pipes wherever required as per site requirement including carriage in all leads and lifts and as directed by Engineer-in-charge. The pipe shall haves zinc coating inside & out side conforming to IS/ISO-4736-1986 or latest with upto date amendments & shall be engraved with code IS/ISO-3183-2012 or its equivalent. The laying shall conform to BIS 5822-1970 or latest with upto date amendments with provision of scour pipe after every km by providing Tee & Sluice valve etc. complete to the entire satisfaction of Engineer-in-charge (Earth work shall be measured and paid for separately). |
| 37 | Providing circumferencial Butt welded joints by electrical arc welding to MSERW pipe having 200 dia. of pipe, wall thickness, welded in requisite numbers of weld runs so as to achieve the minimum effective throat thickness of weld conforming to IS 816-1969 specifications, by using welding electrodes of 2.5 mm to 6.3 mm of ADVANI Oerlikon (Adore) - CITOJET /ESAB make, conforming to IS 814-1991, at site of work complete in all respects, including manual/mechanical handling of pipes in all leads and lifts to the entire satisfaction of Engineer-in-Charge. |
| 38 | Providing, welding and fixing of M.S. flanges at suitable reaches, conforming to following tableS; 200mm as per IS:6392-1971 (Latest with upto date amendments) and welding of MS Flanges with G.I. Pipes/ MSERW pipes in two layers on both faces to make the joint leak proof (The cost of providing and laying of G.I.Pipes/MSERW Pipes to be measured and paid for separately). The welding of flanges should conform to IS 816-1969 with electrode as per IS : 814-1991 and required number of nuts & bolts conforming to IS: 1364. The thickness of gasket not less than 3.00mm conforming to IS : 2712-1998. The work shall be done as per entire satisfaction of Engineer-in-Charge within all leads and lifts. |
| 39 | Cutting of MS Plate permanent engraving marked scale/calibration on the plate and fixed at the site of work. |
| 40 | Clearance of Silt/Malwa from channel including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m, complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 41 | Writing new letters and figures of any shade with synthetic enamel black or any other approved colour to give an even shade as per drawings and technical specifications clause 1701 in English and roman, hyphen, commas and the like not to be measured and paid complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. |
| 42 | Finishing with epoxy paint (two or more coats) at all locations prepared on steel work and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |