| 1 | Prov. Distribution Transformer 11/.4KV, 100KVA |
| 2 | Prov. S/T Pole 9 Mtr W/L >200 kgf/m2 |
| 3 | Prov. RCC Muff with concrete filling |
| 4 | Prov. AAAC 7/3.15 mm |
| 5 | Prov. X-arm: C.I (100x50X6 mm ),Length: 2800 mm x 2 Nos for incommer line |
| 6 | Prov. MS A.I X-arm (50x50x6 mm), Length: 2800 mm x 1 No for LA's |
| 7 | Prov. X-arm: C.I (75x40X6 mm ),Length: 2800 mm x 4 Nos for supporting DO Fuse unit & GO switch |
| 8 | Prov. X-arm: C.I (100x50X6 mm ),Length: 2800 mm x 2 Nos for T/F Bed |
| 9 | Prov. X-arm: C.I (100x50X6 mm ),Length: 460 mm x 2 Nos for supporting main channel of T/F |
| 10 | Prov. MS A.I X-arm (50x50x6 mm), Length: 2800 mm x 2 Nos |
| 11 | Prov. MS A.I X-arm (35x35x5 mm), Length: 460 mm x 2 Nos |
| 12 | Prov. MS A.I X-arm (50x50x6 mm), Length: 950 mm x 2 Nos for Bed Knee Bracing |
| 13 | Prov. MS A.I X-arm (50x50x6 mm), Length: 2800 mm x 2 Nos |
| 14 | Prov. MS A.I X-arm (50x50x6 mm), Length: 450 mm x 1 Nos |
| 15 | Prov. G.O Switch handle supporting C.I (75x40x5 mm), Length: 460 mm x 1 No |
| 16 | Prov. G.O AB Switch unit Triple pole o/d type |
| 17 | Prov. D.O Fuse unit |
| 18 | Prov. Lightning Arrestor/Surge Arrester, 9 Kv station class ( porcelain type) |
| 19 | Prov. Disc Insulator Sets (comprissing 1 no. disc(porcelain,BS,12kV, 90 Kn) i/c dead end clamps etc. ) |
| 20 | Prov. Stay set complete |
| 21 | Prov Stay wire 7/3.15mm (6.0 kg/stay set) |
| 22 | SWG GI wire For Earthing |
| 23 | Prov. Pipe Earthing Set |
| 24 | Prov. LT Distn Panel Box for 100 kVA DTR with MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp(Panel should be CPRI Approved) |
| 25 | Prov. Half Clamp |
| 26 | Prov. Full Clamp |
| 27 | Prov. M.S Nuts & Bolt Off size (Galvanised/coated) |
| 28 | Prov. Aluminium Thimble 300 sq mm |
| 29 | Prov. Copper Thimble 95 sq mm |
| 30 | Prov. Danger Plate |
| 31 | Prov. Barbed Wire |
| 32 | Prov. LT Cable 3.5 core 120 mm sq x2 incommer |
| 33 | Prov. LT Cable 3.5 core 120 mm sq x6 outgoing |
| 34 | Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri-Vector meter (CT-300/5 A)) for 100 KVA Transformer |
| 35 | Prov. HP 60.5 cm (23.8) All in one Desktop PC 24-cr0016 in (AMD ryzen 37000 series processor with 23.8 inch display , 8 gb Ram, 512 gb ssd hard drive) for SAP billing |
| 36 | Prov. Aluminium Paint |
| 37 | Prov. Red Oxide |
| 38 | Prov. CTPT Unit 50/5 Amp |
| 39 | Prov. Transformer Bed( Civil Work) |
| 40 | Prov. Chain Link fencing , Angle Iron ,Gate etc fortransformer fencing( Civil Work) |
| 41 | Add: [Cost of Optional Miscellaneous Items (Protective Gear i.e 11 kv insulated rubber handler gloves (EN-60903 & IEC-60903) |
| 42 | Add Erection Charges Complete in all respect |
| 43 | Add Transportation Charges Complete in all respect Please Enable Macros to View BoQ information |