|
| 1 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary Rock ( not requiring blasting)Mechanical Means |
| 2 | Providing sand filling in foundation and trenches and plinth -do- -do- all complete job as per specification and direction of E/I. |
| 3 | Providing sand filling in foundation and plinth -do- -do- all complete job as per specification and direction of E/I. |
| 4 | Providing 75B brick flat soling -do- -do- all complete job as per specification and direction of E/I. |
| 5 | Providing P.C.C. M-150 (1:2:4) in foundation -do- -do- all complete job as per specification and direction of E/I. |
| 6 | Providing R.C.C. M-200 (1:1½:3) in foundation -do- -do- all complete job as per specification and direction of E/I. |
| 7 | Providing 75A brick work in C.M. (1:6) in foundation and plinth -do- -do- all complete job as per specification and direction of E/I. |
| 8 | Providing R.C.C. M-200 (1:1½:3) in lintel -do- -do- all complete job as per specification and direction of E/I. |
| 9 | Providing 125 mm thick reinforced 75A brick work in C.M. (1:4) in superstructure -do- -do- all complete job as per specification and direction of E/I. |
| 10 | Providing R.C.C. M-200 (1:1½:3) in column -do- -do- all complete job as per specification and direction of E/I. |
| 11 | Providing & fixing FAN HOOK of 16 mm dia M.S. bar, 1 M long bent to required size and shape, placed in position and fluid in the R.C.C. slab-beam at the time of casting all complete as per building specification and direction of E/I. (where material is not supplied by deptt.) |
| 12 | providing tor steel reinforcement of 10mm, 12mm and 16mm dia do do |
| 13 | Providing M.S. steel reinforcement with cutting, bending and binding -do- -do- all complete job as per specification and direcition of E/l.10mm dia |
| 14 | providing 25mm thick first class patent stone flooring (1:2:4) do do |
| 15 | providing 6mm cement plaster (1:4) in ceiling with clean coarse sand do do |
| 16 | Providing 12mm cement plaster(1:3) with clean course sand of F.M 1.5 with floating coat of neat cement in skirting including rounding of junctions with floor, curing taxes and royalty all complete as per building specification and direction of E/I. |
| 17 | Providing 12mm cement plaster(1:6) with clean course sand of F.M 1.5 with floating coat of neat cement in skirting including rounding of junctions with floor, curing taxes and royalty all complete as per building specification and direction of E/I. |
| 18 | providing 1.5mm cement punning do do |
| 19 | Providing Two coats of snowcem of approved shade & make over a coat of cement primer on new surface including preparing the plaster surface smooth with sand paper scaffolding, curing and taxes all complete as per building specification & direction of E/I. (painting on innner sides ) |
| 20 | Centering and shuttering including strutting , propping etc. and removal of form for Foundatoins ,footings,bases of columns ,etc for mass concrete. |
| 21 | Centering and shuttering including strutting , propping etc. and removal of form for Foundatoins ,footings,bases of columns ,etc for mass concrete. |
| 22 | Centering and shuttering including strutting , propping etc. and removal of form for Foundatoins ,footings,bases of columns ,etc for mass concrete. |
| 23 | Centering and shuttering including strutting , propping etc. and removal of form for Foundatoins ,footings,bases of columns ,etc for mass concrete. |
| 24 | earth filling in foundation trenches and plinth in layers not do do |
| 25 | Carriage of Materials cement |
| 26 | Chips |
| 27 | Bricks |
| 28 | Steel |
| 29 | earth filling in foundation trenches and plinth in layers not do do |
| 30 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications.RCC Grade M25RCC Grade M25 using batching plant,transit mixer & Concrete pump |
| 31 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.Random Rubble masonry (coursed/uncoursed) |
| 32 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specificationsRandom Rubble Masonry (Coursed/uncoursed) |
| 33 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specificationsPCC Grade M20Height upto 5mPCC Grade M20 using batching plant, transit mixer & concrete pump |
| 34 | Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications. |
| 35 | Pointing with cement mortar (1:3) on brick work in substrucutre as per technical specifications |
| 36 | Add GST @ 18 % |
| 37 | Add L.Cess @ 1 % Please Enable Macros to View BoQ information |