| 1 | Dismantling R.c.c work including stacking of material as directed by E.I. S.I. 694 |
| 2 | Dismantling cement concrete floor including stacking of dismantled materials as directed by E/I in all Complete SI No 697 |
| 3 | Dismantling Brick work including disposal of refuse as directed by the Engineer-in charge with in a distance of 60 metre(S.I. No. 692) |
| 4 | Dismantling doors&windows including chowkhats with hold fast & including stacking of dismantled materilas as directed by E/I within a distance of 60mtr. SI 703 |
| 5 | Excavation in foundation in ordinary soil including lift up to 1.5 meter lead up to 30 meter including watering and ramming of excavated earth into plinth and removal and disposal in surplus earth as directed by the E/I. up to a distance of 30M from the foundation trenches.(S.I.251) |
| 6 | Earth filling in plinth including supply of necessary of earth upto 10 km distance. Including watering dressing etc. Labour and T & P etc. Required for proper completion of work.(S.I 253 + cartage ) Analysis |
| 7 | Sand filling in plinth including supply of necessary quantity of sand from ganga River including watering dressing wtc. Labour and T & P etc. Required for proper completion of work.(S.I.255) |
| 8 | Providing and laying in cement concrete 1:6:12 (1 cement :6Fine sand{FM 2.20-3.60} : Brick ballast of 40 mm nominal size) and curing complete,including supply of all material labour T&P etc. required for proper completion of the work, in foundation and floors. SI 273 |
| 9 | Cement conc. With 2cm guage approved stone grit coarse sand & cement in proportion of 4.2.1 including supply of all materials,labour and tools and plants etc.required for proper completion of work.(S.I.279 i) |
| 10 | R.C.C. work with cement approved coarse sand and 2 cm.gauge approved stone grit in the proportion of 1:2:4 in Raft foundation, excluding supply supply of reinforcement but including fixing & binding the same with 24 B.W.G. G.I. wire and including the cost of binding wire and including supply of all materials, labour and tools & plants. Royalty etc. required for the proper completion of the work. S.I. No.287 |
| 11 | R.C.C work with cement approval coarse sand and 2cm gauge stone grit in proportion of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending but including its fixing and blinding the with 24 B.W.G.G.I binding wire and excluding cost of centering and shuttering and supplyof all materials, labour and tools and plants etc. Required for proper completion of the work as per ( S.I.283 ) |
| 12 | R.C.C. work with cement approved coarse sand and 2 cm.gauge approved stone grit in the proportion of 1:2:4 in beams & slabs excluding supply supply of reinforcement but including fixing & binding the same with 24 B.W.G. G.I. wire and including the cost of binding wire and including supply of all materials, labour and tools & plants. Royalty etc. required for the proper completion of the work. S.I. No.285 |
| 13 | R.C.C. work with cement approved coarse sand and 2 cm.gauge approved stone grit in the proportion of 1:1.5:3 in slab excluding supply supply of reinforcement but including fixing & binding the same with 24 B.W.G. G.I. wire and including the cost of binding wire and including supply of all materials, labour and tools & plants. Royalty etc. required for the proper completion of the work. S.I. No.284A |
| 14 | R.C.C. work with cement approved coarse sand and 2 cm.gauge approved stone grit in the proportion of 1:1.5:3 in Columns excluding supply supply of reinforcement but including fixing & binding the same with 24 B.W.G. G.I. wire and including the cost of binding wire and including supply of all materials, labour and tools & plants. Royalty etc. required for the proper completion of the work. S.I. No.289 |
| 15 | Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work including supply of steel wastage beads, hooks and authorized overlapping shall be measured. S.I. No.504 |
| 16 | M-150 class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools & plants. etc. required for the proper completion of the work..S.I. no.303 |
| 17 | M-150 class one brick thick wall brick work in 1:6 cement and coarse sand mortar in super Structure including supply of all materials, labour and tools & plants. etc. required for the proper completion of the work. S.I. No.303+ 309+310 |
| 18 | M-150 Brick work in 1:4 one cement and 3 coarse and mortar in super structure for walls of half brick thick including necessary cutting & moulding of materials,labour and tools and plants etc. Required for proper completion of work.S.I. 305+309+310 A |
| 19 | Providing and laying Brick bat coba integal cement based waterproofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with waterproofing compound conforming to IS: 2645 and approved by engineer-in-charge over the RCC slab including adjointing walls up to 300 mm height including cleaning the surface before treatment. b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20mm thick layer of cement mortar of mix 1:5(1cement : 5 coarse sand) admixed with water proofing compound conforming to IS:2645 and approved by engineer-in-charge to required Sqm - 1050.00 New B Providing and laying waterproofing treatment in sunkeri portion of WCs,Bathroom etc. by applying cement slurry mixed with waterproofing cement compound consisting of applying: a) First layer of slurry of conforming to IS:2645 and approved by engineer-in-charge to required slope and treating similarly the adjointing walls up to 300mm height including rounding of junctions of walls and slabs. c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS:2645 and approved by Engineer-in-charge. d) Finishing the surface with 20mm thick joint-less cement mortar of mix 1:4(1 cement : 4 coarse sand) admixed with waterproofing compound conforming to IS:2645 and approved by engineer-in-charge inlcuding laying glass fibre cloth ofapproved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm sq. 3mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.All above operations to be done in order and as directed and specifed by the engineer-in-charge. With average thickness of 120mm and minimum thickness at khurra as 65mm. NOTE :- It is suggested that this method should be adopted after ensuring the structural safety of the structures New Item Chap No.11 |
| 20 | M.S.or iron work in Z-section in ventilator including of all materials labour tools & plants etc...comp.(Chap-10 Sl no.502b) |
| 21 | P/F in position collapsible steel shutters with vertical channels 20x1.0 with top and bottom rails of T iron 40x40x6 mm with 38 mm dia. Steel pulleys with bolts, nuts, locking, arrangement, stoppers, handle,complete including applying a priming coat of approved red lead paint(518) |
| 22 | 12 mm thick cement plaster single coat on fair side of single of half brick wall for interior plastering including supply of all materials labour tools & plants required for proper completion of work 1.4 cement and coarse sand (Sl No.584 i+Difference |
| 23 | 12 mm thick plaster same as per item No.(21) but on rough face with 1:4 (one cement and four coarse sand) mortar including supply of all materials labour tools & plants requires for proper completion of work.(S.I.584 (1)+596 |
| 24 | Finising wall with oil bond Distempring two coat including supply of all materials labour T & P etc.required for proper completion of the work.(SI No. 649+650) |
| 25 | Finishing walls with Water Proofing cement paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20Kg /10 sqm) SI 660+661 |
| 26 | Providing and applying plaster of paris putty of 2mm thickness over plasterred surface to prepared the surface even anmd smooth complete.SI Chap. 15 New item DSR 13.26 |
| 27 | Painting & Varnishing new work in small areas with one cost or ready mixed priming paint and two coat of approved superior quality ready mixed paint including supply of all materials labour T & P etc.Required for proper completion of the work.(SI No. 1+2+4i) |
| 28 | S/F glass pans 4 mm thick of approved quality with brand and putty for window and ventilator mann section or wherever required on other places including cartage of all itemsAs per DSR 2023 14.5.1 unit rate 1090.65x0.735x106/107 |
| 29 | 4.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2.0 cm graded approved stone shingle laid in panels finished with 3.0 mm floating coat of neat cement or cement and marble dust in 5:1 as specified and removing any overlapping mortar at the joints of panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc. required for proper completion of the work (SI 605+Analysis) with base concrete (15Cm) |
| 30 | Providing and fixing of 100mm dia P.V.C down pipe including supply of all materials, labour and tools & plants. etc. required for the proper completion of the work. (S.I 730B) |
| 31 | 18mm thick cement plaster in dado or skirting upto 30cm in height in 1:3 consisting of one part of cement and 3 parts of app c/sand with floating coat of neat cement as per DSR2023 11.6.1 (Dsr unit rate 662.05x0.735x106/107) |
| 32 | Engraving lines in the plaster of outer face wall vertically and horizontally to display the surface as stone facing as directed by E/I including labour and all T&P etc required for proper completion of the work.SI 598 |
| 33 | P/L glass strips 3.15 mm thick and 3.5 cm depth joints of floors skirting dado at time of laying floors flush with floor level including supply of all material labour and T&P etc. required for proper completion of work (631) |
| 34 | P/F of flyproof galvanized mosquito MS wire gauge to windowsand celerestory windows using wire guage with average width of aperture 1.4mm in both directions with wire of dia.0.63mm all complete with second class teak wood beading 62x19 mm as per DSR 9.51.1 |
| 35 | S/F of flush door 35 mm thick commercial Quality conforming to I.S. 2202 part I (1983) including Fixing of wooden cleats and stoppers and including fixing and adjustment of hinge bolls locks handle springs fitting with necessary screws. (470ii) |
| 36 | M-150 brick in 1:4 cement and Coarse sand morter in foundation and plint including supply of all materials, labour and T& P etc. required for proper (SI No.305 |
| 37 | Supply and filling brick bats complete material |
| 38 | P/L Neat cement punning SOR. 13.18 |
| 39 | Mild steel or iron work of small sizes and section such as holding down bolts, hold fasts, tie rods, gratings etc. wrought to required for completion of work (S.I.502) |
| 40 | 4.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2.0 cm graded approved stone shingle laid in panels finished with 3.0 mm floating coat of neat cement or cement and marble dust in 5:1 as specified and removing any overlapping mortar at the joints of panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc. required for proper completion of the work (SI 605 Please Enable Macros to View BoQ information |