| 1 | Earth work in Excavation of Foundation in all kind of Soil in Foundation with 50 Mtr. Initially lead and 1.5 Mtr. Initially lift including rough dressing…… cte completed. |
| 2 | Providing and laying Sand in Foundation and Plinth filling with 9'' thick layers of approved quality free from dust, dirt and other materials to proper line and grade, watering and ramming….etc completed. |
| 3 | C.C. (1:4:8) in foundation and floor using 40 mm size Hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 150 mm thick to required level, ramming watering and curing....etc completed. |
| 4 | R.C.C. work of M-20 grade with 20 mm and down grade black hard granite stone chips including watering and curing ….etc completed. Ground Floor (A) Col. Footing |
| 5 | (B) Columns |
| 6 | (C) Plinth |
| 7 | (D) Lintel |
| 8 | (E) Chajja |
| 9 | (F) Stair Case |
| 10 | (G) Beams |
| 11 | (H) Slab |
| 12 | First Floor (A) Columns |
| 13 | (B) Lintel |
| 14 | (C) Chajja |
| 15 | (D) Beams |
| 16 | (E) Slab |
| 17 | Supplying, fitting & placing uncoated TMT bar rainforcement complete as per Drowing and Technical specification…etc completed.Ground Floor |
| 18 | Supplying, fitting & placing uncoated TMT bar rainforcement complete as per Drowing and Technical specification…etc completed.First Floor |
| 19 | Brick masonry in C.M. (1:6) using Brick of approved quality including cost of conveyance, royalty curing of all materials and labours ….etc completed.Below Plinth |
| 20 | Brick masonry in C.M. (1:6) using Brick of approved quality including cost of conveyance, royalty curing of all materials and labours ….etc completed.Ground Floor |
| 21 | Brick masonry in C.M. (1:6) using Brick of approved quality including cost of conveyance, royalty curing of all materials and labours ….etc completed.First Floor |
| 22 | Fixing Ceramic Tils in floor, Trads or Steps and landing on 25 mm thick bed of cement mortar (1:2) joint with neatcement slurry mixed with pigment of match the shades of Tiles including rubbing and polishing…..etc completed. Ground Floor |
| 23 | 12mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed. Ground Floor |
| 24 | 12mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed.First Floor |
| 25 | 16 mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed.Ground Floor |
| 26 | 16 mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed.First Floor |
| 27 | Finishing wall surface of wall with Acrylic wall putty of approved make and finishing amooth and even surface to painting including all cost.Ground Floor |
| 28 | Finishing wall surface of wall with Acrylic wall putty of approved make and finishing amooth and even surface to painting including all cost.First Floor |
| 29 | Wall painting 2 coat with weather coat Paint of approved shade on new work to given including cost of paint….etc completed.Ground Floor |
| 30 | Wall painting 2 coat with weather coat Paint of approved shade on new work to given including cost of paint….etc completed.First Floor |
| 31 | Distempering Two coat to wall with distemper of approved shed on new work to given on shed.Ground Floor |
| 32 | Distempering Two coat to wall with distemper of approved shed on new work to given on shed.First Floor |
| 33 | Supply,fitting & fixing of MS Grill Gate, Doors, Windowsout of STEEL flat confirming to IS-1977/1996 asper the design approved . Please Enable Macros to View BoQ information |