|
| 1 | Item Description/ Heading |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 5 | Providing and laying in position ready mixed or site batched design mix reinforcement cement concrete using coarse aggregate and fine aggregate derived from natural sources, rapid hardening cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centring, shuttering and finishing as per direction of the engineer-in charge; for the following grade of concrete. all work upto plnth lavel, concrete of M25 grade with minimum cement content of 300kg/cum. (Note: extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately in case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement ). |
| 6 | Providing and laying in position cement concrete using (rapid hardening cement) of specified grade excluding the cost of centring and shuttering - All work up to plinth level: 1:1:2 (1 Cement:1 coarse sand (zone-III) derived from natural sources: 2 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Hiring of JCB on contractual basis for cutting excavating, filling earth, cleaning of unwanted bushes and vegetation by mechanical means etc all complete as per direction of engineer in charge (note including all cost complete ie driver, diesel, helper & lubricant etc) |
| 9 | Hiring of crane of capacity 80 tonne on contractual basis including Driver, Helper, diesel & lubricant etc at site for lifting and installation of precast concrete solid block in correct and final position with proper line level and plumb at site making all arrangements i.e. push-pull jacks and all another T&P for lifting, placing and alignment of concrete all complete as per direction of engineer in charge. |
| 10 | Providing contractual manpower for assisting in work such as dismantling lifting, stacking and rearranging sleepers and all related activities with concerned work etc. All complete as per direction of engineer in charge. (engaging 5 manpower per day) |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. |
| 13 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |