| 1 | WITHOUT ITC AVAILABILITY |
| 2 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 3 | Finishing walls with Acrylic Smooth exterior paint of required shade: Old work (One or more coat applied @0.90 Itr/10 sqm). |
| 4 | Colour washing such as green, blue or buf to give an even shade: New work (two or more coats) with a base coat of white washing with lime |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: One or more coats on old work |
| 6 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of high intensity Micro-Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of 4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer. |
| 7 | Lettering with black Japan paint of approved brand and manufacture |
| 8 | Cleaning and manual collection of visible waste such as plastic bags, bottles, glass pieces, cans, paper and non-hazardous debris from road shoulders, medians, sidewalks and nearby drains by a team of 12 workers as per direction of EIC. |
| 9 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 10 | Carriage of Materials By Mechanical Transport including loading,unloading and stacking Lime, moorum, building rubbish Lead - 5 km |
| 11 | Carriage of Materials By Manual Labour including loading, unloading and stacking for lead less than 0.50 KM Lime, moorum, building rubbish Lead - 50 |
| 12 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 13 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 14 | 12 mm cement plaster of mix: 1:6(1 cement: 6 fine sand) |
| 15 | Providing and applying High glazed Lime for Line marking such as Surya Plus or equivalent of 25 KG lining along the road edge or centerline for temporary demarcation purposes, including supply of lime powder, marking layout, uniform application by manual and all labour , tools, equipment required to complete the work as per specification and direction of the Engineer in charge. |
| 16 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 17 | Providing and fixing pole mounted twin dustbin of 100 litre capacity each, made of Stainless Steel Grade–304, cylindrical shape, non-perforated body, complete with three pole stand system fabricated from SS 304 having pole diameter 39–42 mm, height 1100–1200 mm, and pipe thickness approx. 6.00 mm & 1.00 mm container wall thickness, including fixing arrangement, base support, and all necessary accessories. The dustbin shall be fixed type without lid, provided with plugged outlet for washing and drainage, maintaining minimum ground clearance of 15 cm, complete in all respect as per manufacturer specification and direction of Engineer-in-Charge. |
| 18 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |