| 1 | Dismentling of old and Brick work including supply of all material,labour and T&P etc.required for proper completion of work |
| 2 | Deduction of old and workable brick 40% of item no-1 |
| 3 | Disposal of dismentling cc road material with cartage upto distance 5.00 km i/c loading and unloading 80 % of item no-1 including supply of all material,labour and T&P etc.required for proper completion of work |
| 4 | Earth work in excavation in ordinary soil upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work |
| 5 | Concrete in 1:4:8 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. |
| 6 | Concrete in 1:6:12 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. |
| 7 | M-150 brick work in 1:4 with cement,coarse sand mortar in foundation including supply of all material,labour and T&P etc.required for proper completion of work |
| 8 | M-150 brick work in 1:4 with cement,coarse sand mortar in super structure including supply of all material,labour and T&P etc.required for proper completion of work |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in raft foundation i/c supply of all material,labour and T&P etc.including all complete of work |
| 10 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Column i/c supply of all material,labour and T&P etc.including all complete of work |
| 11 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in plinth beam,tie beam i/c supply of all material,labour and T&P etc.including all complete of work |
| 12 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in suspended floor slab i/c supply of all material,labour and T&P etc.including all complete of work |
| 13 | Mild steel or iron work such as reinforced including supply of all material,labour and T&P etc.required for proper completion of work |
| 14 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work |
| 15 | Cement concrete approved coarse sand and stone gritt of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work |
| 16 | Providing & Laying of 6-8mm thick vitrified floor tiles including supply of all material,labour and T&P etc required for proper completion of work |
| 17 | Providing & Laying of 6mm thick china glazed wall tiles including supply of all material,labour and T&P etc required for proper completion of work |
| 18 | Applying two coat enaimel paint with priming coat on wood or steel and other metal surface including supply of all material,labour and T&P etc required for proper completion of work |
| 19 | Providing wall putty on new surface with approvel quality material of berger/J.K/Birla or Similar make 2 coats including supply of all material,labour and T&P etc.required for proper completion of work |
| 20 | Finishing wall with waterproof cement paint apex weather coat of approved brand including supply of all material,labour and T&P etc.required for proper completion of work |
| 21 | Supply and fixing 10cm dia of PVC pipe 6kg/sqcm pressure including supply of all material,labour and T&P etc required for proper completion of work |
| 22 | Providing and laying \\"brick coba\\" 12mm thick laid with M-150 class brick bat coba 7.50cm thick with gap of 15mm to each other,over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry with top mashed false square 30cm x30cm and side wall parapet shall be mono tythic plaster wall upto 30cm higher incluing supply of all materials ,labour and T&P etc. required for proper completion of the work |
| 23 | Mild steel or iron work such as Railling including supply of all material,labour and T&P etc.required for proper completion of work |
| 24 | Add for Internal & External Electrification fittings@5% |
| 25 | Add sign board Please Enable Macros to View BoQ information |