|
| 1 | Construction work of modern workshop and training room in Industrial Training Institute Motihari of District Banda (U.P.) |
| 2 | SUB-STRUCTURE-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 4 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) under floor |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the Concrete of M25 grade with minimum cement content of 330 kg /cum All works upto plinth level |
| 9 | Boring with hydraulic piling rigs with power units, Providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) :400 mm dia piles |
| 10 | Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.1.Initial test |
| 11 | Routine test |
| 12 | Providing & laying in position machine batched and machine. Mixed design mix M-25 grade cement concrete for reinforcement cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying including the cost of centering, shuttering , finishing and but excluding reinforcement , including admixtures in recommended proportion as per IS : 9103 to acclerate, retarder for setting of concrete/ improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note :- Cement content considered in this item @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately.R.C.C. work Above plinth Lvl. (M-25) |
| 13 | Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in anover all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. |
| 14 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 15 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement:2 coarse sand) to match the existing floor.With Chlorpyriphos/ Linadane E.C. 20% with 1% concentration. |
| 16 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). |
| 17 | Painting on D.P.C. with two coats of airblown bitumen 85/50 or 85/25 @ 1.7 kg/sqm approx. including cost of fuel if any. |
| 18 | SUPER STRUCTURE-Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)Ground floor |
| 19 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.Cement mortar 1:4 (1 cement :4 coarse sand) |
| 20 | 15 mm cement plaster on rough side of single or half brick wall of mix:1:6 (1 cement: 6 coarse sand) |
| 21 | 12 mm cement plaster of mix :1:6 (1 cement: 6 coarse sand) |
| 22 | Add for plaster drip course/ groove in plastered surface or moulding to R.C.C. projections. |
| 23 | Providing & Laying 3mm thickness Epoxy flooring. Step:-1 Surface preparation: Grinding of floor / scrabing manually. Step:-2 Filling of construction joint / cracks with epoxy filler material sand. Step:-3 Applying one coat primer. Step:-4 Applying coat of epoxy screeding. Step:-5 When screed dry properly will start grinding and cleaning again so that dust gets cleaned properly. Step:- Applying final finish epoxy topping. Please Enable Macros to View BoQ information |
| 24 | Providing & Laying 3mm thickness Epoxy flooring. Step:-1 Surface preparation: Grinding of floor / scrabing manually. Step:-2 Filling of construction joint / cracks with epoxy filler material sand. Step:-3 Applying one coat primer. Step:-4 Applying coat of epoxy screeding. Step:-5 When screed dry properly will start grinding and cleaning again so that dust gets cleaned properly. Step:- Applying final finish epoxy topping. Please Enable Macros to View BoQ information |