|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 3 | Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional areas of R.C.C. or R.B. work) as per direction of Engineer-in-charge. |
| 4 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work |
| 5 | Demolishing brick work manually/by mechanical means includingstacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar |
| 6 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) :From brick work in cement mortar |
| 7 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead :A. Of area of 3 sqm. and below |
| 8 | B. area beyond 3 Sqm. |
| 9 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead :A. Of area of 3 sqm. and below |
| 10 | B. of area beyond 3 Sqm. |
| 11 | Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. |
| 12 | Demolishing mud phaska in terracing and disposal of material within 50 meters lead |
| 13 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. |
| 14 | Repair to plaster of thickness 12mm to 20mm in patches of area 2.5 Sqm. and under including cutting the patch in proper shape raking out joints and preparing the plastering the surface of the wall’s complete including disposal of rubbish to the dumping ground within 50 mtr. Lead. With cement mortar (1:4) 1 cement : 4 fine sand |
| 15 | Renewing glass panes, with putty and nails wherever necessary including raking out old putty :A. Float glass panes of thickness 4.0 mm(weight not less than 10kg/sqm) |
| 16 | B. Float glass panes of thickness 5.0 mm(weight not less than 12.5 kg/sqm) |
| 17 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering grade. All work upto linth level. A. 1:5:10 (1 cement : 5 coarse sand : 10 graded crushed stone agg. 40mm nominal size) crushed |
| 18 | B. 1:4:8 (1 cement : 4 coarse sand : 8 graded crushed stone agg. 40mm nominal size) crushed |
| 19 | C. 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone agg. 20mm nominal size) crushed |
| 20 | D. 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone agg. 20mm nominal size) with 20% boulders |
| 21 | E. 1:2:4 (1 cement : 2 coarse sand :4 graded crushed stone agg. 20mm nominal size) crushed |
| 22 | F. 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 23 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) |
| 24 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 25 | Extra for brick work/tile brick/AAC block masonry in superstructure above floor V level for each four floors or part thereof by mechanical means: |
| 26 | Extra for brick work in:Square or rectangular pillars |
| 27 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in :Cement mortar 1:4 ( 1 cement : 4 coarse sand) |
| 28 | Extra for half Brick masonry in superstructure above plinth level upto floor V level. |
| 29 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 30 | Centering and shuttering including strutting, propping etc and removal of form work for:-A.Foundation, footing, bases of columns. |
| 31 | B. Suspended floors, roofs, Landing, balconies and access platform. |
| 32 | C. Shelves (Cost in Situ) |
| 33 | D. Edges of slab and breaks in floors and walls under 20 mm wide |
| 34 | Reinforced cement concrete work in chimneys, shafts upto floor five level including curing complete but excluding the cost of centering, shuttering, finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 35 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 36 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 37 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 38 | Providing and fixing tiled False Ceiling of specified materials of size 595x595mm in true horizontal level suspended on inter locking metal grid of hot dipped galvanized steel sections (galvanized @ 120 gms/sqm both side inclusive ) consisting of main “T” runner with suitably spaced joints to get required length and of size 24x38mm made from 0.30mm thick (minimum) sheet spaced at 1200 mm center to center and cross “T” of size 24x25 mm made of 0.30mm thick (minimum) sheet, 1200mm long spaced between main “T” at 600mm center to center to form a grid of 1200 x 600mm and secondary cross “T” of length 600mm and size 24x25 mm made of 0.30mm thick (minimum) sheet to be interlocked at middle of the 1200x600mm panel to form grids of 600x600mm and wall angle of size 24x24x0.30mm and laying false ceiling tiles of approved texture in the grid including, wherever, required cutting/making, opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc. Main “T” runners to be suspended from ceiling using GI slotted cleats of size 27x37x25x1.6mm fixed to ceiling with 12.5mm dia and 50mm long dash fasteners, 4mm GI adjustable rods with galvanized butterfly level clips of size 85x30x0.8 mm spaced at 1200mm center to center along size 85x30x0.8 mm spaced at 1200mm center to center along main T, bottom exposed width of 24mm of all T-sections shall be pre-painted with polyester paint, all complete for all heights as per specifications, drawings and as directed by Engineer-in-charge. (The rate is excluding the cost of tiles which will be paid for separately).12.5 mm thick square edge PVC Laminated Gypsum Tile of size 595x595 mm, made of Gypsum plasterboard manufactured from natural gypsum as per IS 2095 part-I and laminated with white 0.16mm thick fire retardant PVC film on the face side and 12micron metalized polyester on the back side with all edges sealed with the face side PVC film which goes around and wraps the edges and is bonded to the edges and the back side metalized polyester film so as to make the tile a completely sealed unit |
| 39 | Regrading terracing of mud phaska covered with tiles or bricks, in cement by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement: 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded) within 50 meters lead. |
| 40 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or re-plastering, including disposal of rubbish to the dumping ground within 50 meters lead. |
| 41 | White washing with lime to give an shades A. Old work (Two or more coats) |
| 42 | B. Old work ( One or more coats) |
| 43 | Removing white or colour wash by scrapping and sand papering andpreparing the surface smooth including necessary repairs to scratches etc. complete. |
| 44 | Distempering with dry distemper of approved brand and manufacture (one or more coats) and of required shade on old work to give an even shade. |
| 45 | Removing dry or oil bound distemper, water proofing cement paint andthe like by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 46 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade, one or more coats on old work. |
| 47 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. |
| 48 | 15mm Cement plaster on the rough side of single or half brick wall of mix:A. 1 : 6 ( 1 cement : 6 fine sand) |
| 49 | B. 1:4 (1 cement : 4 coarse sand) |
| 50 | 20 mm cement plaster of mix.1:6 (1 cement : 6 coarse sand) |
| 51 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer |
| 52 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. |
| 53 | Finishing walls with acrylic smooth exterior paint of required shade onNew work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 54 | Finishing walls with water proofing cement paint of required shade onNew work (two or more coats applied @ 3.84 kg/10sqm) |
| 55 | Finishing walls with water proofing cement paint of required shade:Old work (one or more coats applied @ 2.20 kg/10sqm) over priming coat of primer applied @ 0.80 liters/10sqm complete including cost of priming coat. |
| 56 | Applying priming coat:With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood) |
| 57 | With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel work |
| 58 | Painting on G.S sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution. |
| 59 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. |
| 60 | Wall Painting with acrylic emulsion paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 61 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work |
| 62 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth completeA. 1 mm thick. |
| 63 | B. 2 mm thick |
| 64 | Providing and placing on terrace (at all floor levels) polyethylene waterstorage tank ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank |
| 65 | Providing and fixing aluminum work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixed with dash fastener of required dia. and size including necessary filling up of gaps at junctions i.e, at top, bottom and sides with required EPDM rubber / neoprene gasket felt etc. Aluminum sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminum snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-Charge (glazing, panelling and dash fasteners to be paid for separately.) For fixed portion Anodized aluminum (Anodized transparent or dyed to required shade according to IS:1868, minimum anodic coating of grade AC 15) A. Powder coated aluminum (minimum thickness of powder coated 50 microns) |
| 66 | For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately.)B. Powder coated aluminum (minimum thickness of powdercoated 50 microns) |
| 67 | C. Polyester powder coated aluminum (minimum thickness of polyester powder coated 50 microns) |
| 68 | Providing and fixing 12mm thick prelaminated particle board flat pressed three layer or graded wood particle board (conforming to IS: 12823 Grade-I type-II) in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-incharge.Pre-laminated particle board with decorative lamination on both sides. |
| 69 | Providing and fixing glazing in aluminum door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineerin- charge. (Cost of aluminum snap beading shall be paid in basic item.)With float glass panes of 8 mm thickness (weight not less than 20.0 kg / sqm) |
| 70 | Providing and fixing double action hydraulic floor spring of approved brand and manufacture IS : 6315 marked, having brand logo embossed on the body/plate with double spring mechanism and door weight upto 125 kg for doors including cost of cutting floors, embedding in floors as required and making good the same matching to the existing floor finishing and cover plates with brass pivot and single piece M.S. sheet outer box with slide plate etc. complete as per the direction of Engineerin- plate etc. complete as per the direction of Engineer-in-charge.With Stainless Steel cover plate minimum 1.25 mm thickness |
| 71 | Providing and fixing Brass 100mm mortice latch and lock with 6levers without pair of handles (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete. |
| 72 | Providing and fixing aluminum sliding door bolts ISI marked anodized (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with nuts and screws etc. complete :A. 300 x 16mm |
| 73 | B. 250 x 16mm |
| 74 | Providing and fixing aluminum tower bolts ISI marked anodized (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc. complete :A. 200 x 10 mm |
| 75 | B. 150 x 10 mm |
| 76 | C. 100 x 10 mm |
| 77 | Providing and fixing aluminum handles ISI marked anodized (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade with necessary screws etc. complete.A. 125mm |
| 78 | B. 100mm |
| 79 | C. 75mm |
| 80 | Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6mm, with 40mm dia, steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer, |
| 81 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note: -Butt hinges and necessary screws shall be paid separately).A. Second class Deodar wood : 30mm thick |
| 82 | B. Second class Deodar wood : 35mm thick |
| 83 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick Particle Board 12mm thick Plain particle board flat pressed, 3 layer or graded wood particle board medium density Grade I, IS : 3087 marked |
| 84 | Providing and fixing wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of Engineer-in-charge :Second class deodar wood 35mm |
| 85 | Providing and fixing wooden moulded beading to door and window frames with iron screws, plugs and priming coat on unexposed surface etc. complete: 2nd class Teak woodA. 50x12mm |
| 86 | B. 50 x 20mm |
| 87 | Providing and fixing brass curtain rods of wall thickness 1.25 mmwith twobrass brackets fixed with brass screws and wooden plugs etc. wherever necessary complete.A. 20 mm diameter. |
| 88 | B. 25 mm diameter. |
| 89 | 10cm thick (average) mud phaska of damped brick earth on roofs laid to slope consolidated and plastered with 25mm thick mud mortar mixed with bhusa at 35 kg/Cum of earth and gobri leeping with bhusa at 3.5kg/cum 8 earth and mixed with 1:1 (1 clay : 1 cow dung) and covered with flat tile bricks of class designation 100 grouted with cement mortar 1:3 mixed (1 cement : 3 fine sand) with 2% of integal water proofing compound by weight of cement and finsihing neat with hand moulded FPS brick tiles. |
| 90 | Extra for every additional 1 cm thickness of mud phaska. |
| 91 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement: 3 fine sand) as per standard design. In 75x75 mm deep chase |
| 92 | Making khurras 45x45cm with average min. thickness of 5cm cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone agg. 20mm nominal size) over pvc sheet 1mx1mx400 micron finished with 12mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. |
| 93 | Providing and laying water proofing treatment in sunkan portion of WCs, bathroom etc. by applying cement slurry mixed water proofing cement compound consisting of applying. a) After surface preparation, first layer of slurry of cement @0.488 Kg/Sqm mixed with water proofing cement compound @0.253 Kg/sqm. This layer will be allowed to air cure for 4 hours. b)Second layer of sullary of cement @ 04242 Kg/Sqm mixed with water proofing cement compound @ 0.126 Kg/Sqm. This layer will be allowed to air cure for 4 hours followed with water curring for 48 hours. The Rates includes prepration of surface, treatment and sealing of all joints, corners, junctions of pipes and masonary with polymer mixed slurry. |
| 94 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compoundconsisting of applying :(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm.(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours.The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately)For the purpose of measurement the entire treated surface will be measured. |
| 95 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.A. 40mm thick with 20 mm nominal size stone aggregate |
| 96 | B. 50 mm thick with 20 mm nominal size stone agg (Crushed) |
| 97 | Providing and fixing gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, ofrequired size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed withmatching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels Raj Nagar plain white marble/Udaipur green marble/zebra black marble Granite of any colour or shade (Area of slab upto 0.5 sqm) 16mm |
| 98 | Providing edge moulding to 18 mm/16 mm thick marble stone counters, Vanities etc. including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge Granite work |
| 99 | Extra for providing frosted glass panes 4 mm thick instead of ordinary float glass panes 4 mm thick in doors, windows and clerestory window shutters. (Area of opening for glass panes excluding portion inside rebate shall be measured) |
| 100 | Providing and fixing M.S Grills of required pattern in frames of windows etc with M.S Flats square or round bars etc incl. priming coat with approved steel primer all complete.A. Fixed to steel windows by welding |
| 101 | B. Fixed to openings / wooden frames |
| 102 | Providing and laying Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand and manufacturer, in all colours and shades, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). ; Size of tile 60x60 cm |
| 103 | Providing and laying integral cement based water proofing treatment including prepration of surfaces as required for treatment of roofs, balconies, terracies etc consisting of following operations a) applying a slurry coat of neat cement using 2.75kg/ sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over the RCC Slab including adjoining walls upto 300mm height including cleaning the surface before treatment b) Laying brick bats with mortar using broken bricks/ Brick Bats 25mm to 115mm size with 50% of Cement mortar 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over 20mm thick layer of cement mortar of mix 1:5 (1 Cement: 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300mm height including rounding of Junctions of walls and slabs) c) After two days of proper curing applying a second coat of cement slurry using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge. d) finishing the surface with 20mm thick jointless cement mortar of mix 1 :4(1 cement: 4 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved byEngineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finially finishing the surface with trowel with neat cement slurrv and making pattern of 300x300mm/sq 3mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by Engineer-in-charge. With average thickness of 120mm and minimum thickness at khurra as 65 mm. |
| 104 | Provding and fixing wall lining using heavy duty PVC panels [NSI] |
| 105 | Provding and fixing ceiling using heavy duty PVC panels [NSI] |
| 106 | Provding and fixing wall lining using heavy duty WPC panels [NSI] |
| 107 | Providing and fixing Gypsum board ceiling including required accessories design as per direction of Engineer - In - Charge. [NSI] |
| 108 | Carriage of material by M.T incl loading/unloading & stacking complete A.Brick av. Lead 80 km |
| 109 | B. Brick tile av. Lead 80 km |
| 110 | C. Sand av. Lead 10 km |
| 111 | D. Stone agg. Below 40 mm nominal size av. Lead 10 km |
| 112 | E. Disposal of material 3 km |
| 113 | Supplying and fixing of following electrical items suitable for operating on 240/230Volts AC, 50 Hz supply.( Remote Control) A. Ceiling Fan (including Providing and fixing of 1.5' long fan rods) 5 Star rating. 1200 mm Sweep. |
| 114 | B. Exhaust Fan 250mm |
| 115 | C. Exhaust Fan 300 mm |
| 116 | D. Wall Fan 450 mm |
| 117 | E. Wall Fan 600 mm Heavy duty |
| 118 | F. Supplying installation, testing and commissioning of 2KVA sinewave invertor complete Tabular batteries of rating 200AH and Trolly. |
| 119 | Providing and fixing of Split AC's [NSI] Samsung, LG, Volts, Blue Star or equivalent ( Hot & Cold) a. 1 Tonne with Stablizer |
| 120 | b. 1.5 Tonne with Stablizer |
| 121 | c. 2.0 Tonne with Stablizer |
| 122 | Servicing of Window AC's [NSI] |
| 123 | Servicing of Split AC's [NSI] |
| 124 | Servicing of Water Purifier's incl. changing of candles [NSI] |
| 125 | Providing and fixing of Water Heater [Gyser] including all required accessories [NSI] a. 15Ltr |
| 126 | b. 25Ltr |
| 127 | c. 35Ltr |
| 128 | d. 50Ltr Please Enable Macros to View BoQ information |