| 1 | Earth work for excavation of foundation in all kinds of soil incl. levelling and dressing the bed etc. complete |
| 2 | Filling plinth with sand including watering and ramming etc. complete. |
| 3 | P.C.C (1:3:6) using 4cm. Size BHGCB metal including the cost of all merials, labour carriage, royalty etc. complete |
| 4 | C.C (1:2:4) using 12mm.size BHGCB chips including all cost complete |
| 5 | R.C.C (M20) using 12mm.size BHGCB chips including all cost complete |
| 6 | Rigid and smooth centering and shuttering for Drain work incl. cost of all materials. |
| 7 | Cutting, straitening, bending,binding of HYSD Bar & tying the grills and placing in position etc.complete incl.cost |
| 8 | Disposal of surplus excavated materials by truck to low land area incl. loading and unloading etc. complete. |
| 9 | First class Fly Ash brick work in cement mortar (1:6) in Super Structure with best quality bricks having crushing strength from 75kg/cm2 to 99kg/cm2, immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes moulding, chamfering, corbelling etc. complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge. |
| 10 | Providing 12mm thick plaster in C.M. (1:6) over Brick massonary work racking out the joints finsihed smooth to proper line and plumb , watering and curing for 7days with cost, conveyance, royalty, taxes of all materials, cost of all labour, T&P etc. complete as per direction of the Engineer-in-charge. |
| 11 | Water bound Cement Priming one coat with cost of all materials etc. Complete. |
| 12 | Finishing outside walls with two coats of weather coat paint of approved shade on new work to give an even shade including cost of all labour ,materials & P with taxes ,transportation etc all complete. |
| 13 | Supplying , fitting and fixing of 35mm thick M.S. Grill Window & Door (shutter) with M.S. Grill and iron fittings fixed in proper possition for window & shutter including all cost labour and materials T&P etc. all complete as per direction of Engineer-in-charge. |
| 14 | Painting two coats of synthetic enamel paint over a coat of primer, to Iron works as per approved quality over a coat of primer , sand papering, polishing the surface, including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete in all floors as per direction of the Engineer-in-charge. |
| 15 | Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil including spreading and all cost complete |
| 16 | Carriage of earth including all cost complete |
| 17 | Fine dressing and turfing with initial lead of 50m and 1.5m initial lift as per direction of Engineer-in-charge |
| 18 | Supplying all materials, labour and ladder/Scaffolding T&P for Art Painting/3D Painting over walls/streets/(RCC or plaster or CC Bitumenous base black top surface) as per direction EIC including cost of paint admixtures such as fabric stainer, acrylic emulsion etc with labour charges of artistis and helpers etc. Complete. |
| 19 | Add for other unforeseen item such as wirtting charges of display board etc. |
| 20 | 5% O&M Charges Please Enable Macros to View BoQ information |