| 1 | Supplying all materials, labour, T & P and providing and fixing to wall or celling and floor GI/UPVC pipes, class-IV (10 k.g. F/cm) on firming I.S. 4985 of the following nominal bore, tube fittings and clamps including complete as per specification and direction of the Engineer-in-charge.25 mm dia UPVC pipe |
| 2 | 20 mm dia UPVC pipe |
| 3 | Supplying all materials, labour, T & P and fitting and fixing brass/CP fittings of the following nominal bore with supply of all hoiniting materials including cost & conveyance of all materials to worksite, payment of taxes etc. complete as per PH specification and direction of the Engineer-in-charge.15 mm dia Long body bib cock |
| 4 | 15 mm dia short body bib cock |
| 5 | 15 mm dia CP concealed stop cock |
| 6 | 15 mm dia UPVC elbow |
| 7 | 15 mm dia CP pillar cock |
| 8 | 25 mm UPVC Tee |
| 9 | 25 mm UPVC Union |
| 10 | 25 mm dia UPVC valve |
| 11 | 25 mm dia UPVC brass MTA |
| 12 | 25 mm x 20mm UPVC elbow |
| 13 | 20 mm UPVC elbow |
| 14 | 20 mm UPVC Tee |
| 15 | 20 mm UPVC socket |
| 16 | 25 mm UPVC socket |
| 17 | 25 mm UPVC nipple |
| 18 | 20 mm UPVC nipple |
| 19 | 20 mm x 15 mm UPVC elbow |
| 20 | 20 mm x 15 mm UPVC brass Tee |
| 21 | 20 mm brass MTA |
| 22 | 25 mm size UPVC flange |
| 23 | 15mm C.P angle stop cock |
| 24 | Supplying all materials, labour, T & P and fitting CP soap holder complete with CP brass brackets fixed to wooden plugs with CP screws as per specification and direction of the Engineer-in-charge. CP soap holder |
| 25 | Supplying , fitting & fixing of wash hand basin including all cost. (500X400) |
| 26 | Supplying , fitting & fixing of 15mm dia c.p. swan neck Pillar cock with spout including all cost. |
| 27 | Supplying of solvent cement (237 ml) including all cost. |
| 28 | Supplying , fitting & fixing of Towel rod including all cost. |
| 29 | Supplying , fitting & fixing of LS flushing cistern including all cost. |
| 30 | Supplying , fitting & fixing 1000 liters sintex tank including all cost complete. |
| 31 | Supplying , fitting & fixing of 18\\"x 16\\"x8\\" STEEL sink single bowl including all cost complete. |
| 32 | Extra over item No .8 for hoisting Rotational moulded polyethylene cylindrical vertical water storage tanks of the following size for every additional height of 5 metres or part thereof |
| 33 | Supplying , fitting & fixing of 0.5 Hp motor pump with assesories including all cost complete. |
| 34 | Supplying , fitting & fixing of PVC door with assesories including all cost complete. |
| 35 | RCC Ring Tank(Soak way pit) 1.20 m dia x 1.5 mtr deep incl. all cost complete |
| 36 | R.C.C. work of M20 having minimum compressive strength (working stress) 200kg./cm2 in 15cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12mm to 20mm size (1/2\\" to 3/4\\") crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Base |
| 37 | Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/bent up M.S. rods/Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 guage binding wire required for R.C.C. work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wires will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S. rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). |
| 38 | Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete. |
| 39 | Providing and applying to outside walls with two or more coats of -Fungal weather coat water proofing paint over a coat of primer including scaffolding and cleaning the surface before application of approved colour and manufacture as per specification, and direction of Engineer-in-Charge at all elevations including all material labour complete. |
| 40 | Supplying of M.S door and grill incl. all cost complete |
| 41 | Supplying, fitting and fixing of Barbed wire including all cost complete |
| 42 | 2.5cm thick grading concrete (1:2:2) on roof slab with 6mm. Size on new work crusher broken hard Granite chips including cost of all labour, materials with all taxes, lead, T & P etc all complete |
| 43 | Enamel Painting two coats with any approved paint over a coat of primer including cost of all labour, materials T & P with taxes, transportation etc all complete in Ground Floor. Please Enable Macros to View BoQ information |