| 1 | Material |
| 2 | IPC with Aluminium Bail for Earthing |
| 3 | 33 KV Polymer PIN Insulater (for Covered Conductor) |
| 4 | 33 KV Polymer Tention Insulator |
| 5 | 33 KV Insulating Piercing Connector (for Covered to Covered) |
| 6 | Brecing Set 33 KV |
| 7 | 33 KV Tension Clamp with bail & IPC |
| 8 | 33 KV Cable Tie for PIN Insulator |
| 9 | 33 KV Insulating Piercing Connector (for Covered to Bare Conductor) |
| 10 | 33 KV Tension Mid Span Joint |
| 11 | 33 KV ACS AL-59 (232 sqmm) Covered Conductor EN 50397-1:2006 the conductor shall be stranded, round, non compacted and water tight, Non compacted Conductor shall be comply with all the requirement of EN 50397-1.2006 The stranded conductor shall be longitudionally water blocked by means of a water blocking material. The semi conducting screen, inner insulation and outer insulation should be extruded in one step. The outer covering insulation shall be UV- stabilized, tracking, resistant black XLPE |
| 12 | Brecing Clamp with Nut & Bolt for SP-55 Top |
| 13 | Brecing Clamp with Nut & Bolt for SP-55 Bottom |
| 14 | Earth wire Clamp for SP-55 with Nut & Bolt |
| 15 | PP Clamp with Nut & Bolt SP-55 |
| 16 | Stay Clamp with Nut & Bolt SP-55 |
| 17 | Labour |
| 18 | Fixing of 33 KV Insulating Piercing Connector (for Covered to Bare Conductor) |
| 19 | Fixing of 33 KV Mid Span Jointing kit |
| 20 | Fixing of 33 KV Insulating Piercing Connector (for Covered to Covered) |
| 21 | Fixing of 33 KV Pin Insulator |
| 22 | Fixing of 33 KV Disc Insulator |
| 23 | Fixing of bracing Set |
| 24 | Excavation of Earth for Stay pit size 0.6x0.6x1.25 Mtr. For Erection of Stay in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus soil as directed complete work (0.432 cum/Stay) |
| 25 | Grouting of Stay in Size 0.6x0.6x0.3 mtr. in CC ratio 1:4:8 as per RESSPO Manual (0.108 cum/Stay) |
| 26 | Earthing of Support with MS Earth rod of 2.5 meter long |
| 27 | Grouting of Pole in Size 0.45x0.45x1.9 mtr. of the support in CC ratio 1:4:8 as per RESSPO Manual (0.384 cum/Pole) |
| 28 | Fixing of 33 KV Tension Clamp with IPC |
| 29 | Excavation of Earth for Pole pit size 0.9x0.6x1.6 Mtr. For Erection of Pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus soil as directed complete work (0.864 cum/Pole) |
| 30 | Muffing of 33 kv Pole Size 0.45x0.60 mtr. Radious with CC 1:3:6 with kiking Box |
| 31 | Erection of 33 KV Stays after digging of pole pit with fixing all accessories & back filling of pits |
| 32 | Febrication work of MS Channel |
| 33 | Looping & Chopping of tree branches |
| 34 | Fixing of 33 KV Cable Suspension Tie |
| 35 | Fixing of 33 KV Bimetalic Lug |
| 36 | Laying, Spreading and proper Sagging of Earth wire with complete binding and jumpring |
| 37 | Laying, Spreading and proper Sagging of MVCC Cover Conductor and making 33 KV Line 3 phase with complete with all Connection |
| 38 | Erection of 33 KV Double Pole SP-55 after digging of pole pit with fixing all accessories & back filling of pits |
| 39 | Dismentling of 33 KV Line with Earth Wire |
| 40 | Erection of 33 KV Single Pole SP-55 after digging of pole pit with fixing all accessories & back filling of pits |
| 41 | Cartage SP-55 Pole (101-150 Km) |
| 42 | Back Cartage of Petty Material (151-200 Km.) |
| 43 | Cartage of Pettty Material (101-150 Km) |
| 44 | Back head load Cartage of Petty Material (1-3 Km.) |
| 45 | Head load Cartage of Petty Material (1-3 Km) |
| 46 | Head load Cartage of SP-55 Pole (1-3 Km) |
| 47 | Erection of 33 KV Four Pole SP-55 after digging of pole pit with fixing all accessories & back filling of pits |
| 48 | Construction of Retaining Wall and Plinth including all cost of all Material complete Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |