|
| 1 | Dismantling Brick or Stone masonry in lime or cement mortar under 3m. Hight including stacking the useful materials for reuse and removing the debris within 50m. Lead etc. complete. As per direction of Engg-in-Charge . |
| 2 | Dismantling flat and pan tiled roofing (Tiles only) including stacking the useful materials for reuse and removing the debris within 50m. Lead etc. complete. As per direction of Engg.-in-Charge. |
| 3 | Dismantling reepers under tiled roof (pan, flat or nuria tiles) after careful removal of nails including stacking the useful materials for reuse and removing the debris within 50m. Lead etc. Complete. as per direction of Engg.-in-Charge. |
| 4 | Removing old lime or cement plaster from walls/Ceilings raking out joints 12 mm deep and removing the debris within 50m lead etc. complete. as per direction of Engg-in-Charge . |
| 5 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead etc. complete. as per the direction of the Engineer-in-charge. |
| 6 | Dismantling and removing old tiled cladding from walls including recking out joints 12mm deep stacking the useful materials for reuse and removing the debris within 50m lead etc Complete. as per the direction of the Engineer-in-charge. |
| 7 | Scraping old paint with scrapers. Sand papermg and l washing with soap water or soda including scaffolding charges above 5m high and upto 8m hight etc. Complete. as per the direction of the Engineer-in-charge. (Rate as perSR-2022, SL nO.-25.8(8), PageNo.-226) |
| 8 | Scraping old paint with scrapers. Sand papermg and l washing with soap water or soapwater or soda including scaffolding charges above 5M high and upto 8M hight etc. Complete. as per the direction of the Engineer-in-charge. (Rate as perSR-2022, SL NO.-25.8(9), PageNo.-226) |
| 9 | Earth work by mechanical means borrowed from out side/from site within 5km initial lead and 1.5m initial lift including levelling and dressing the bed and sides depositing muck within initial and lift etc. complete as per direction of Engineer-in-charge. |
| 10 | Foundation excavation in hard soil including levelling and dressing the bed sides depositing muck within initial lead and lift etc. complete as per direction of Engg-in-Charge. |
| 11 | Filling foundation and plinth with sand and well watered and rammed including cost, conveyance and royalty etc complete as per direction of Engg.-in-Charge. |
| 12 | Cement concrate (1:3:6) with 40mm size CBHG metal including cost, conveyance and royalty etc. complete as per direction of Engg.-in-Charge. |
| 13 | Cement Concrete (1:2:4) with 12 mm size broken hard granite chips for R.C.C works including hoisting and laying etc. complete as per direction of Engg-in-Charge |
| 14 | Rigid and smooth centering and shuttering for R.C.C works including false works and dismantaling then after casting including cost of materials etc. complete as per direction of Engg-in-Charge. |
| 15 | Supplying and fixing of 60mm thick cement concrete interlocking paver block of M-30 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRS SP - 63:2018 etc. complete as per direction of Engg-in Chaerge.Rate as per SR-2022, SL No-25.17(2), Page No-233 |
| 16 | Supplying and fixing of pre cast kerb stone of size 300mm x 300mm x 150mm of M-30 grade of approved make, design, colour and size made by block making machine with proper compaction fixed in required pattern etc. complete in all respect confonning to IS 5758: 1984 etc. complete as per direction of Engg-Charge.Rate as per SR-2022, SL No-25.17(3), Page No-233 |
| 17 | FLY ASH Brick masonry in c.m 1:6 in F and P including cost, conveyance and royalty of materials curing etc. complete as per the direction of the Engineer-in-charge. |
| 18 | 1st class Fly Ash brick masonry work in superstructure thoroughly soaked in water, with cement mortar (1:6) including scaffoldings, racking out joints, curing etc complete as per specification/drawing and as per the direction of the Engineer-in-charge. |
| 19 | R.C.C work M20 grade using 20mm and down grade HBG crusher broken chips including hoisting, laying, cost, conveyance and royality of materials curing including centerring and shuttering etc. complete as per direction of Engg-in-Charge. i. Column Base |
| 20 | (a). Ground Floor (ii). Plinth Beam/Tie Beam |
| 21 | (iii). Beam & Column) (a) Ground Floor |
| 22 | (iv). 65 mm avg.Chajja (a) Ground Floor |
| 23 | (v). Roof Slab (a). Ground Floor |
| 24 | (vi). Lintel (a). Ground Floor |
| 25 | (vii). Cylibdrical wall . (a). At 9mt ht |
| 26 | (viii). Staircase. (a). First Floor. |
| 27 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete in proper position including cost of binding wire 18 to 20 gauge as per direction of Engg.-in-Charge. (i)Ground Floor |
| 28 | 12mm cement plaster in cement mortar (1:6)including necessary scaffolding curing etc. as per direction of Engg.-in-Charge. (i) Ground Floor |
| 29 | 16mm thick cement plaster in cement mortar (1:6) including necessary scaffolding curing etc. as per direction of Engg.-in-Charge. (i) Ground Floor |
| 30 | 6mm.thick cement plaster with C.M(1:4) to RCC surface including closed deep chipping and slury treatment etc. complete as per direction of Engg.-in-Charge. (i)Ground Floor |
| 31 | 20mm. thick grading plaster in c.m. 1:4 over roof slab and chujja including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . (i) Ground Floor |
| 32 | Fixing Dholpuri Stone Tiles in Floors, treada or step and landings on 25mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to march the shades includind cost for rubbing, polishing & cost of marbel tiles etc. Complete as per direction of Engg-in-Charge. (i) Ground Floor |
| 33 | Fixing Colour Vitrified tiles in floors (Printed Series) of size 600mm x600 mm of approved make conforming IS:13755 laid on 20mm thick cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc reruired for the work all complete as per direction of Enginneer-in -charge. (i) Ground Floor |
| 34 | Fixing Vitrified tiles in dados (Printed Series) skirting and risers of stepson 12 mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to matche shade of the tiles including rubbing and polishing complete as per direction of Engineer-in-charge. (i) Ground Floor. |
| 35 | Fixing Ceramic Glazed wall tiles in dados skirting and risers of stepson 12mm thick cement plaster(1:3) jointed with neat cement slurry mixed with pigments to matche shade of the tiles including of Engineer-in-charge. (i) Ground Floor |
| 36 | Fixing Floor tiles in floors,treads or steps and landing on 25mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades including cost for rubbing, polishing and cost of marbek tiles etc. complete as per direction of Engg-in-Charge. (i) Ground Floor |
| 37 | Wall priming one coats on new work with wall water bound primer of approved shade as per direction of Engg-in-Charge . Ground Floor. (i) Ground Floor |
| 38 | Finishing wall surface of walls with Acrylic wall putty (Water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T & P etc. complete as per direction if Engg-in-Charge. (i) Ground Floor |
| 39 | Wall painting two coats on new work with Weather coat paint of approved shade as per direction of Engg.-in-Charge. (i)Ground Floor |
| 40 | Supplying, fitting and fixing of MS steel shutter with frame with MS angle frame of 35x35x6mm and shutter section of 30x30x5mm MS angle with ewlding of 25x6mm flat and welding of 16 gauge CR sheet witharrangement of clamp, fitting of 3 nos of 4'' hinges and 300mmx16mm MS aldrop with 8'' Tower bolt including cost, T and S etc required for complete in all respect as per direction of Engg-in Charge. (i) All Floor |
| 41 | Eamel Painting two coats with enamel paint over one coat of primer of approved quality etc. complete as per direction of Engg-in-Charge. (i) Ground Floor. |
| 42 | 2.5cm.grading concrete (1:2:2) on roof slab using 6mm.size CBHG chips including cost.conveyance and royalty of materials curing etc. complete as per direction of Engg-in-Charge. |
| 43 | Supplying,fitting & fixing of stainless steel of 304 grade in Hand Railing using 50mm. Dia of 2mm. thick circular pipe with Balustrade of size 32mm.x32mm.x2mm. @ 0.90m. C/C and stainless square pipe bracing of size 32mm.x32mm.x2mm. In 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost, conveyance, taxes of all materials labour T and P etc. complete as per direction of Engg-in-Charge.(i) Intze Water Tank |
| 44 | Fixing industrial Chequred tiles in floors,treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, polishing & cost of tiles etc. complete as per direction of Engg-in-charge. (i)Ground Floor |
| 45 | Supply and fixing 18W integrated solar streetlight suitable for perfect solar system solution for remote and off grid locations. Housing in aluminium alloy body which makes it water and rust proof with IP65. Enclosed inside the unit multi cell LED Technology BATTERY Lithium lon/Oxide 24Ah+1%,12.8V+0.4V,Max continuous discharge current (w/OPCM) upto 42A, should conform to the latest BLS/International standards which is charged by a highly effiecient mono-crystlline soler panel. The LED luminary delivered close to 120 limens per watt and is made from the finest LEDs from Bridge lux/Oshram/Philips confirmed to BIS specification. The light must have dust to drawn system to auto control the device. The Streetlight is a plug and play unit and can be very easily mounted on walls or poles via the extensions provided with the product itself. A manual ON/OFF switch has also been provided so that the light can awitch off when not in use for a long time etc. complete as per direction of Engg-in-charge |
| 46 | 15cm thick cement concrete (1:3:6) drain 75cm wide and 30cm depth including 12MM cement plastering (1:3) finishing smooth etc. complete as per direction of Engg-in-charge. Rate as per SR-2022, sl no-25.11(7), Page No-226 |
| 47 | 25cm.x23cm concrete drain with cement concrete (1:3:6) and cement plaster (1:3) finishing smooth with 10cm thick concrete over hard base etc. complete as per direction of Engg-in-charge. Rate as per SR-2022, SL NO-25.11(3), Page NO-266 |
| 48 | 12mm. Thick cement plaster in c.m 1:4 over brick masonry with neat cement punning including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge. (i) Ground Floor Please Enable Macros to View BoQ information |