| 1 | Charges for Supplying, fixing and removing of barricading arrangements using 10 to 13 cm dia Casurina Props 3.60m height vertically @ 75cm c/c and tied horizontally with same casurina props 5 rows tying with new coir rope and removing the same after counting is over. |
| 2 | Hire Charges of above materials for 16 Days |
| 3 | Charges for Supplying, erection and removing for G.I Temporary Shed using Casurina props vertically and tied horizontally at top for purlins and fixing GI sheet above the purlins etc., complete complying with standard specifications. |
| 4 | Hire Charges of above materials for 16 Days |
| 5 | Charges for Supplying, fixing & Removing of Galvanised Iron Sheet of 18 gauge thickness and fixing properly by using country wood reepers of size 5cm x 2.5cm and nails etc ., complete complying with standard specification and as directed by the departmental officers |
| 6 | Hire Charges of above materials for 16 Days |
| 7 | Charges for Supplying, erection and removing 12mm thick water proof plywood sheet of approved make and quality and fixing properly by using country wood reepers of size 5cm x 2.5cm and nails etc ., complete complying with standard specification and as directed by the departmental officers |
| 8 | Hire Charges of above materials for 16 Days |
| 9 | Supplying and fixing of cross bars for doors with M.S Steel flats including fabrication, welding charges, transportation charges and removing the same after the counting is over and including hire charges for 37 days etc., complete as directed by departmental officers. |
| 10 | Charges Supplying, fixing and removing of barricading arrangements using 10 to 13 cm Casurina Props of tying 60cm below ground level fixing and 2.10m above ground level fixing and 5 to 8 cm dia Casurina Props five rows horizontally horizontally 0.45m above ground level and tying with new coir rope and removing the all materials after the counting is over. |
| 11 | Hire Charges for 13 days (For Election Counting) |
| 12 | Charges for Supplying, erection and removing View Cutter arrangements using Temporary GI sheet and Casurina props vertically and tied Horizontally at top for Purlins and fixing GI sheet above the purlins etc., complete complying with standard specification. |
| 13 | Hire Charges of above materials for 13 Days |
| 14 | Charges for Supplying, fixing and removing of Weld mesh protection over the casurina barricading of weld mesh of size 2.5cm x 2.5cm and fixing properly by using binding wire etc ., complete complying with standard specification and as directed by departmental officers |
| 15 | Hire for Days 16 |
| 16 | Charges for M.S Weld Mesh Cutting for making Counter openings for each counting tables & PVC Beadings are provided all-round the openings for better finishing and safety aspects etc., complete as directed by the departmental officers |
| 17 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls |
| 18 | Brick Masonry walls in Cement mortar: Below 3m Height |
| 19 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs (Kotta & Cuddapah Slab) |
| 20 | Brick work in Cement Mortar 1:6 (one Cement and Six M-sand) using best quality Burnt Clay Brick of size 8 3/4” x 4 1/4” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. |
| 21 | In Ground Floor |
| 22 | In First Floor |
| 23 | Brick partition walls of 10.80cm thickness using best quality Burnt Clay Brick of size 8-3/4” x 4-1/4” x 2-3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) |
| 24 | In Ground Floor |
| 25 | In First Floor |
| 26 | Plastering with Cement Mortar 1:5 (One cement and Five P-Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 27 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. |
| 28 | Painting Old Plastered Wall Surface with One finishing coats of ready mixed (Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 29 | Supplying and fixing fine polished cuddapah slab of following thickness for cup-board arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as directed by the departmental officers 20 / 30mm thick |
| 30 | Paving the floor with best quality vitrified Tiles of size 600x600x8mm and variety conforming IS 15622 with water absorbtion less than 0.08% of approved colour and shade laid over cement mortar bed of 20mm thick in cement mortar 1:3 (one cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer in all floors and the top pointed with Water Resistant Tile Epoxy Grout etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 31 | Hire Charges for floor mat (Red Colour Carpet) arrangements as directed by the departmental officers |
| 32 | Hire Charges for 16 Days |
| 33 | Hire charges for Plastic Moulded chairs including transporting labour for loading and unloading and recollecting the same after the function is over but excluding the labour charges for spreading the chairs etc complete |
| 34 | Hire Charges of above materials for 3 days (Before Counting) |
| 35 | Armed plastic chairs (for 16 Days) |
| 36 | Hire Charges for Stainless Steel table of size 1.20m x 0.60m including conveyance, loading & un-loading charges and recollecting the same after the counting is over but excluding the labour charges for spreading the tables etc., complete as directed by the departmental officers. |
| 37 | Hire Charges of above materials for 16 days (Before Counting) |
| 38 | Hire Charges for Three Seater Sofa including conveyance, loading & un-loading charges and recollecting the same after the counting is over etc., complete as directed by the departmental officers. |
| 39 | Hire Charges for 16 Days |
| 40 | Hire Charges for Single Seater Sofa including conveyance, loading & un-loading charges and recollecting the same after the counting is over etc., complete as directed by the departmental officers. |
| 41 | Hire Charges for 16 Days |
| 42 | Hire Charges for Teapoy including conveyance, loading & un-loading charges and recollecting the same after the counting is over etc., complete as directed by the departmental officers. |
| 43 | Hire Charges for 16 Days |
| 44 | Hire Charges for Ornamental Stainless Steel barricading Set having 6Nos of 50mm dia pipes of 304L Grade of 900mm height and fitted with 300mm dia M.S Base plate with necessary locking hooks and SS Stands are connected with rope arrangements for counting halls with necessary accessories etc., complete |
| 45 | Hire Charges of above materials for 16 days |
| 46 | Hire Charges for Postal Ballot Pegeonhole plywood box made of 18mm thick waterproof plywood which consists of 16 compartments each having size of 230mm x 325mm x 300mm.The cost is inclusive of materials,labours,conveyance and other miscellaneous accessories etc., complete as directed by the departmental officers. |
| 47 | Hire Charges of above materials for 16 days |
| 48 | Charges for VVPAT Pegeonhole Transparent box made of 4mm thick Acrylic Sheet(white colour) of good quality and approved make which consists of 14 compartments each having size of 100mm x 150mm x 100mm.The cost is inclusive of materials,labours,conveyance and other miscellaneous accessories etc., complete as directed by the departmental officers. |
| 49 | Charges for VVPAT Pegeonhole Transparent Container box with lid made of 4mm thick Acrylic Sheet(white colour) of good quality and approved make having size of 360mm x 260mm x 160mm.The cost is inclusive of materials,labours,conveyance and other miscellaneous accessories etc., complete as directed by the departmental officers. |
| 50 | Hire charges for Watching Tower of size: 2.60m x 1.80m x 6.60m arrangements using Casurina poles and G.I Sheet.The Cost is inclusive of materials,labours for erection of working platform with G.I Roofing sheet and suitable ladder arrangments and removing the same after the counting is over etc., complete as directed by the departmental officers |
| 51 | Hire Charges for 16 Days |
| 52 | Providing and fixing of flex board arrangements .The Cost is inclusive of flex board with all-round runner/M.S tubes for fixity,labours,conveyance and other miscellaneous accessories etc., complete as instructed by the departmental officers |
| 53 | Providing and fixing of 3mm thick Foam Sheet Name board of required size and approved colour etc., complete as directed by the departmental officer incharge |
| 54 | Hire charges for supply and fixing of stored pressure ABC (Mono Ammonium Phospate) Powder Type Fire Extinguisher of 6 kg. capacity as per IS 15683 with pressure gauge, discharge hose & control nozzie, wall mounting bracket, safety clip etc., including conveyance, all incidental charges, necessary scaffolding and re-doing the dismantled portions to its original condition whererver found and remove the same after the counting is over.,etc complete as per standard specification and as directed by the Departmental Officers. |
| 55 | Hire Charges for 16 Days |
| 56 | Hire charges for Supply and fixing Carbon-di-Oxide Gas Type 2 kg. capacity Fire Extinguisher as per New IS:15683., complete with control valve, discharge hose with horn, wall mounting bracket, safety clip etc., including conveyance, all incidental charges, necessary scaffolding and re-doing the dismantled portions to its original condition and remove the same after the counting is over etc., complete as per standard specification and as directed by the Departmental Officers |
| 57 | Hire Charges for 16 Days |
| 58 | Hire Charges for JCB engaged for the purpose of debris cleaning ,dozing and levelling works in the College building campus for Election Counting Centre etc., complete as directed by the departmental officer incharge |
| 59 | Labours (Mazdoor-Gr.I)engaged to Shifting of Steel table, chairs, Almirah & other furniturs etc., from New Class Room building to the Auditorium building and re-arranging the same after the election counting is over etc., complete as directed by the departmental officers |
| 60 | ADD GST 18% Please Enable Macros to View BoQ information |