| 1 | [23.12]Providing and fixing outdoor duty Ply of 12 mm thick frame suitable for exhaust fan up to 450 mm sweep etc complete as required [Through Rate] |
| 2 | [23.20]Fixing of LED Tube light/ 2*2 ft square panel fitting directly on wall /ceiling or false ceiling including making connections etc as required [Through Rate] |
| 3 | [23.22.1.11]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.11. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 200 to 250 amp, 25 KA [Through Rate] |
| 4 | [23.22.1.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 16 to 100 Amp, 25 KA [Through Rate] |
| 5 | [23.22.3.2]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 3.2. Supply and erection of sheet steel enclosures 1pole/2 pole/4 pole on wall/on existing pedestal complete as required. S.P.N. or DP enclosure suitable for DP MCB [Through Rate] |
| 6 | [23.22.5.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.3. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Double POLE [Through Rate] |
| 7 | [23.22.8.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 8.3. SITC Four pole ON LOAD Manual change over switch in SS enclosure of following Ratings 200 amp 415 volts [Through Rate] |
| 8 | [23.23.2.2]MISCELLANEOUS 2.2. Supply of GI pipe (B-Class) for suspension rod of ceiling fan including threading if required. 20 mm dia [Through Rate] |
| 9 | [23.24.4.1]MS STAND, BUS BAR CHAMBER AND PANELS 4.1. Supply, installation, testing and commissioning of load bank with digital meter module cost of digital Amp. / volt meter with selector switch wiring ( but EXLUDING COST of incoming and outgoing MCCBs ) etc.suitable for operation of 240/415 volts A.C. Supply with both side cable allay, inter connection and fixing the same in existing MS pedestal/wall complete with all labour and material required for the same up to the entire satisfaction of Engineer-in-Charge of work. Load Bank 4 way 250 amp. [Through Rate] |
| 10 | [23.9]Erection of exhaust fan in existing opening ,complete with necessary earthling of fan including carriage from PWD store to the site of work. [Through Rate] |
| 11 | [24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. [Through Rate] |
| 12 | [24.1.11]EARTHING AND LIGHTENING ARRESTOR 11. Providing and laying earth connections from earth electrode with 4.00 mm dia G.I. wire in 15 mm dia G.I. pipe from earth electrode as required. [Through Rate] |
| 13 | [24.1.13]EARTHING AND LIGHTENING ARRESTOR 13. Providing and fixing 4.00 mm dia G1. Wire on surface or in recess for loop earthing as required. [Through Rate] |
| 14 | [24.1.2]EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. [Through Rate] |
| 15 | [24.13.46]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 46. 50 Sq mm 3.5core (Arm.) [Through Rate] |
| 16 | [24.14.20]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE ONSURFACE/ EXISTING CABLE TRAY COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 20. 16 Sq mm 2core (Arm.) [Through Rate] |
| 17 | [24.4.5]STREET LIGHT 5. Supply and erection of Single Phase weather proof M.S. box of size 20 cm x 15 cm x 10 cm with hinged cover made of 2 mm thick MS sheet, locking arrangements, housed in wall/fixed on pole , including the cost of 1 no 4 way 16 A Bakelite connector, 1 no. 6 amp SP MCB and 1 Nos. 16 amp. neutral links fixed on Bakelite sheet in the M.S. box including painting and necessary connections. [Through Rate] |
| 18 | [24.5.2.3]MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia [Through Rate] |
| 19 | Erection of ceiling fan complete with fan sheet and necessary connection. |
| 20 | Supply and erection of LED Flood light fitting necessary nuts and bolts and making necessary connectioncomplete in all respect. Make: Bajaj / Philips / Surya Roshni / Wipro 100W flood light Please Enable Macros to View BoQ information |