| 1 | Hire charges for providing internal barricading arrangements in counting halls. The main poles shall be provided for height of 3.60m at an interval of 150cm c/c using 75mm x75mm MS Square Hollow section as vertical members and providing 45mm x45mm MS Square Hollow section as horizontal members at an interval of 120cm c/c to a height of 3.60 m protect unauthorised entry into the counting halls. Including Labour charges for fixing, welding and transporation charges etc., complete ( Hire charges only) |
| 2 | Labour and Hire charges for external barricadding arrangements using Vertcal post of casurina poles 13cm to 15cm dia and 60cm below ground level 3.00m above fixing 10 horizontal in 9 ties and lowest sould be 45cm above ground level and tied with new coir ropes provided in all places and removing the same after te election counting is over. (Hire Charges only) For 10m |
| 3 | Labour and hire charges for providing external barricading arrangements using Vertical post of casurina poles 13cm to15cm dia and 60cm below Ground level and 2.10m above fixing 8 horizontal in 2 ties and lowest should be 45cm above ground level and tied with new coir ropes provided in all places and removing the same after the function is over (Hirecharges only) For 10m |
| 4 | Providing weld mesh of opening size 2.50cm x 2.50cm in counting hall to protect unauthorised entry into the counting halls, The rate includes cost of all materials labour charges transportation, loading and unloading charges all taxes etc., complete complying with standard specification and as directed by the departmental officers. ( Hire charges only) |
| 5 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 6 | Dismantling, clearing away and carefully stacking materials useful for re-use of brick work in cement mortar walls under 3.00 m high in all floors and for every additional 3m part three of over the initial height of 3m etc.,complete |
| 7 | Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9\\" x 4 3/8\\" x 2 3/4\\" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. |
| 8 | For Superstructure In First Floor |
| 9 | Plastering the surface of walls with Cement Mortar 1:5 (One cement and Five M-sand), 12mm thick with mortar Plasticizer at 200ml per 50Kg of cement used in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers. |
| 10 | Supplying and fixing of unbreakable dust free, easy to erase, class Room Writing Board made up of 8mm thick green colour ceramic sheet pasted on the front side 12mm thick ply board and backside of ply board is pasted with flex board sheet. The outer beading of the writing board will be fixed with aluminium Hi section of size 25mm. The board will be fixed firmly on the wall using 3 inch screws. The rate includes cost of all materials labour charges transportation, loading and unloading charges all taxes etc., complete complying with standard specification. |
| 11 | Providing for 19mm thick exterior grade PLY WOOD board for closing the window and doors and the board will be fixed firmly on the wall using 3 inch screws. The rate includes cost of all materials labour charges transportation, loading and unloading charges all taxes etc., complete complying with standard specification and as directed by the departmental officers.( Hire charges only). |
| 12 | Providing Teak wood reepers of a size 0.05mx0.020m nailing to the door frames and removing the same after counting is over and the rate includes cost of all materials labour charges transportation, loading and unloading charges all taxes etc., complete complying with standard specification and as directed by the departmental officers. ( Labour Charges only) |
| 13 | Hire charges for ply wood Stage using 25 mm thick waterproof plywood both side vertically and horizondally at 60 cm C/C intervals at top 0.50 m height and top fixed with 25 mm green ply water proof commercial ply wood and top fixed with best quality and approved variety and any colour of water proof mica sheet including cost of nails, fevical, paste, labour charges for fixing of wall panelling with neatly finishing and cost of all materials etc., complete complying with standard specification. |
| 14 | Labour charges for arranging the wooden counting table of size 1.00m x 1.00m and arranging chair for each table in counting halls for micro observer, counting supervisor and counting assistant. The rate includes the loading, unloading, conveyance arranging in order in counting halls and collecting the same after completing counting and restoring on its original place, including Wrought and putup charges etc.,.complete (Hire charges only). |
| 15 | Hire charges for providing plastic chairs for the function. The rate includes conveyance, spreading of chairs as directed by the departmental officers and recollecting the same after the function is over. |
| 16 | Hire charges for providing Steel bench of size 6'0\\"x 1'3\\" for the counting hall, ETPBS and Postal Ballut . The rate includes conveyance, spreading of chairs as directed by the departmental officers and recollecting the same after the function is over. (Hire charges only) |
| 17 | Hire charges for flex banner (Signage Board) the rate includes fixing the printed banner and removing and dismantling after the function is over etc., complete as directed by the departmental officers. |
| 18 | Supplying and laying Vinyl Flooring 2mm thick at site of approved make including labour charges laying and cost of Fevical. Phaste, loading, unloading, transportation, etc., complete |
| 19 | Painting two coats of Old plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 20 | Painting old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard Specifications. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 21 | Painting old wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard Specifications. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 22 | Writing the poling station numbers and marking the box of sizes 0.30m x 0.60m for storing the EVMs as supplied by the Revenue Department. The rate including artists charges, paints,etc.,complete as directed by the departmental officers. |
| 23 | Hire charges for Temporary shed arrangements sides of stage, panddal using of G.I. sheet fixing in casurina poles of size 13cm, to 15cm in vertical and 10cm to 13cm dia casurina poles in horizontal and 8-10cm dia casurina poles middle height 6m with nails, coir rope of stage using G.I. corrugated sheet etc. removing the same after the Countingn is over. |
| 24 | Hire charges for providing water proofing shamiyana and sides covered the same cloth as per standard specification as directed by the departmental officers etc., complete as directed by the departmental officers. |
| 25 | Hire charges for providing arrangements of stage enclosure using side decoration colour and white cloth one layer of and removing the same after the function is over.. ( Hire charges only) |
| 26 | Labour and hire charges for providing colour carpet matt and the rate is inclusive of conveyance, Transporation spreading of matts as directed by the departmental officers and recollecting the same after the function is over. |
| 27 | Hire charges of Wooden Teapoy Arrangments for Observer rooms the rate is inclusive of conveyance, Transporation etc., complete as directed by the departmental officers and recollecting the same after the function is over. |
| 28 | Hire charges of Single seater sofa for the observer room at the rate is inclusive of conveyance, Transporation etc., complete as directed by the departmental officers and recollecting the same after the function is over. |
| 29 | Hire charges of Three seater sofa for the lobby at the rate is inclusive of conveyance, Transporation etc., complete as directed by the departmental officers and recollecting the same after the function is over. |
| 30 | Hire charges for drinking water arrangements 20 lit can etc., complete including spreading if to various point |
| 31 | Hire charges for drinking water arrangements bubble top etc., complete |
| 32 | Labour charges for cleaning the Toilets for all constituency etc., complete as directed by the departmental officers |
| 33 | Labour charges for cleaning all the constituency etc., complete as directed by the departmental officers. |
| 34 | Labour charges for plumber maintenance works etc., complete as directed by the departmental officers. |
| 35 | Labour charges for Carpenter maintenance works etc., complete as directed by the departmental officers. |
| 36 | GST @ 18 % Please Enable Macros to View BoQ information |