|
| 1 | M & L for overhauling of screw compressor and motor unit by shifting to carrier workshop and disassembling complete of all the components, repair and replacement of all the workout parts as mentined, reassembly of the compressor, pressure testing, commissioning complete all as specified and directed |
| 2 | Supply and fixing of the following spares of a compressor during overhauling.complete all as specified and directed |
| 3 | Bearing - 06N COMPRESSOR-Roller bearing of Carrier Mat code 2016144N |
| 4 | Bearing - 06N COMPRESSOR-Roller bearing of Carrier Mat code 2016145N |
| 5 | Bearing - 06N COMPRESSOR-Roller bearing of Carrier Mat code 2016146N |
| 6 | Bearing - 06N COMPRESSOR-Roller bearing of Carrier Mat code 2014147N |
| 7 | Taper Roller bearing for screws-2 of Carrier Mat code 2011198N |
| 8 | Taper Roller bearing for screws-3 of Carrier Mat code 2011199N |
| 9 | Taper Roller bearing for 06N COMPRESSOR of Carrior Mat code 2016143N |
| 10 | Motor shaft bearing cup of Carrier Mat code 2011190N |
| 11 | Motor shaft bearing cup (gear end) of Carrior Mat code 2011192N |
| 12 | Motor shaft bearing cone(gear end) of Carrior Mat code 2011193 |
| 13 | MOTOR TEMPERATURE SENSORS of Carrior Mat code2003399N |
| 14 | BEARING COVER of Carrior Mat code 2003530N |
| 15 | UNLODER VALVE RING of Carrior Mat code 2003346N |
| 16 | O RING GREASE of Carrior Mat code 2003205N |
| 17 | O-Ring of Carrior Mat code 2007131N |
| 18 | o ring of Carrior Mat code 2015576 |
| 19 | O-RING of Carrior Mat code 2010938 |
| 20 | O-RING of Carrior Mat code 2010939 |
| 21 | O-RING of Carrior Mat code 2010940N |
| 22 | O-RING of Carrior Mat code 2015574 |
| 23 | O-RING of Carrior Mat code 2003344 |
| 24 | O-Ring of Carrior Mat code 2007131 |
| 25 | ECONOMIZER O RING of Carrior Mat code 2003345 |
| 26 | FILTER of Carrior Mat code 2001972n |
| 27 | FILTER of Carrior Mat code 2000144n |
| 28 | VALVE of Carrior Mat code 2001882 |
| 29 | FILTER DRIER CORE of Carrior Mat code 2000797 |
| 30 | FUSE 160A of Carrior Mat code 2016048 |
| 31 | Synthetic oil (05 Gallons) |
| 32 | Replacement of Motor shaft bearing cu 2011191 |
| 33 | Rewinding of Stator |
| 34 | M & L for replacement of old unserviceable 3/4 inch copper pipe of thickness 25swg along with taking down old unserviceable copper pipeline from the condenser/evaporator unit without any damage to the condenser/evaporator unit complete all as specified and as directed. |
| 35 | M & L for Nitrogen testing of each copper pipe of the condenser and evaporator to detect any leak, closing the copper pipeline with leak at both the ends with brass fittings to arrest the leak and refixing both the ends of the condenser and evaporator units complete all as specified and as directed. |
| 36 | S&F of GI metal frame with powder coated fine filter 5 micron capacity made out of fibre visco washable type of Size 610mm x 610mm Thickness is 50 mm complete all as specified and as directed. |
| 37 | S&F of GI metal frame with powder coated fine filter 5 micron capacity made out of fibre visco washable type of Size 305mm x 610mm Thickness is 50 mm.complete all as specified and as directed. |
| 38 | S&F of GI metal frame with powder coated fine filter 5 micron capacity made out of fibre visco washable type of Size 305mm x 305mm Thickness is 50 mm complete all as specified and as directed. |
| 39 | Supply and lay 150mm NB MS flanged Pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc complete all as specified and as directed. |
| 40 | Supply and lay 100mm NB MS flanged Pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc complete all as specified and as directed. |
| 41 | M & L for Insulation of 150mm NB MS Pipe/150 mm dia butterfly valve with PUF slab 40 mm thick with and including applying bituminuous compound and GI cladding with 26 gauge GI sheet complete all as specified and as directed. |
| 42 | Supply and fixing of Screw Compressor Protection Module(SCPM) as per OEM.complete all as specified and as directed. |
| 43 | Supply and fixing of Prodialog Basi (Mother Board) as per OEM.complete all as specified and as directed. |
| 44 | Supply, installation, commissioning and testing of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) of minimum 80 TR capacity with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions.complete all as specified and as directed. |
| 45 | M & L for removing old control wiring inside the control panel of the chiller plant and new control wiring as per existing and detailed inspection of the chiller unit by technician/service engieer of OEM and replacment of all minor spares namely sensors, actuators etc for smoothe functing of the entire chiller unit complete all as specified and as directed. |
| 46 | S & F of HFC-134a refrigerant complete all as specified and as directed. |
| 47 | S & replace butterfly value 150mm dia with necessary rubber gasket, bolts, nuts and washer including taking out existing valve complete all as specified and as directed. |
| 48 | S & replace butterfly value 100mm dia with necessary rubber gasket, bolts, nuts and washer including taking out existing valve complete all as specified and as directed. Please Enable Macros to View BoQ information |