| 1 | Earthwork in bulk excavation by manual means over areas (exceeding 30 cm in depth,1.5m in width as well as10m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 mtrs as directed by Engineer-In_charge.All kind of soils |
| 2 | Earth work in bulk excavation by mechanical means(hydraulic excavator) over areas (exceeding 30cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds ofsoil. |
| 3 | Supply and staking of good earth. |
| 4 | Supply and staking of good earth. |
| 5 | Labour charges for filling empty cement bags with sand/earth; including cost of sewing and strings excluding cost of bags |
| 6 | Loading/Unloading sand/earth filled EC bags in Lorries lead upto 50m |
| 7 | Unloading sand/earth filled bags from boats a) Placing in dry. |
| 8 | b) Placing in Water. |
| 9 | General canal clearance including garbage trash, un hygienic materials, weed, grass, mud, cutting of bushes etc with disposal as directed by engineer incharge. |
| 10 | Hire charges for hydraulic excavator for emergent nature of works (jcb) including fuel charges and operator. |
| 11 | Hire charges for hydraulic excavator (3d L and T) for emergent nature of works including fuel charges and operator. |
| 12 | Hire and running charges for tractor with trolley including fuel and driver. |
| 13 | Supply of laborers including Gst and contractors profit, Skilled |
| 14 | Unskilled. |
| 15 | Supply/ hire charges of boat with boatmen. |
| 16 | Carriage of material by Mechanical Transport from available source to dumping site of work including loading, unloading,stacking etc.upto 1 km. |
| 17 | Carriage of material by Manual Means from dumping site to actual site of work including loading, unloading,stacking etc upto 50 mtr. |
| 18 | Providing Lubricating/oiling and greasing of hydraulic gates as desired by site engineer. |
| 19 | Providing and fixing of PVC pipes dia 4inch as outlets. |
| 20 | Providing of assorted nut bolts for hydraulic gates. |
| 21 | Supply of petrol for chainsaw/ Brush Cutter. |
| 22 | Supply of m.oil for chainsaw/ Brush Cutter. |
| 23 | Supply of E.C bags. |
| 24 | Proving / laying including Supply of boulders excluding carriage and head load. |
| 25 | Providing and laying of polythene. |
| 26 | Constructing muthu bunds , comprising boulders and wood bushes in alternate years including working in water conditions. |
| 27 | Engagement of Black smith 2nd class(including Gst and contractors profit) |
| 28 | Welding by Gas plant Please Enable Macros to View BoQ information |