| 1 | Rendering 10+5 mm thick on fair faces of brick or concrete surface walls in two layers, in cement mortar 1:4 , rendering is to be finished even and fair without using extra cement including taking down cement plaster of any description on brick or stone walls or from concrete surface including raking out joints, hacking for key, scrubbing down with water etc, and removing unserviceable material outside cantt area,complete all as specified and as directed by Engineer-in-charge.Note :- Work will be carried out upto 3rd storey of bldgs rates are including necessary formwok and scaffolding required as per site conditions & no extra payment shall be made on this account. |
| 2 | M&L for cement plaster, 10 mm thick on fair faces of brick/concrete surfaces of wall in cement mortar 1:6 finished even and smooth w/o using extra cement including taking down cement plaster of any description on brick or stone walls or from concrete surface including raking out joints, hacking for key, scrubbing down with water etc, and removing unserviceable material outside cantt area,complete all as specified and as directed by Engineer-in-charge. |
| 3 | Rendering 5 mm thick on fair faces of brick or concrete surface in ceilings, in cement mortar 1:3 , rendering is to be finished even and smooth without using extra cement including taking down cement plaster of any description on ceilling from concrete surface including raking out joints, hacking for key, scrubbing down with water etc, and removing unserviceable material outside cantt area,complete all as specified and as directed by Engineer-in-charge. |
| 4 | M&L for repairing of concrete surfaces such as balcony, chajjas, upward or downward facias ,column, pillar, ceiling and similar items with plain cement concrete 1:2:4 type B-0 including minimum reinforcement or rendering 10-15mm thick as per site requirement in CM 1:3 without using extra cement finished even and fair complete all as specified and directed (Up to second storey bldgs and including necessory formwork and scaffolding and provision of minimum reinforcement required as per site condition also taking down or dismantling as required at site). |
| 5 | Demolition of reinforced cement concrete of any discription ground to 2nd floors and removing the rubbish from the work site out side defence premises complete all as specified. |
| 6 | M&L for RCC M-15, nominal mix, type B-1(1:2:4), using 20mm graded crushed stone aggregate as in slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like, complete all as specified and directed. |
| 7 | M&L for TMT mild steel bars 10 mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for column, hooking end and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips, complete all as specified and directed. |
| 8 | M&L for use and waste form work to soffits of suspended slabs such as roof slabs, floor slabs landings and similar work, not exceeding 200mm thick (horizontal or sloping) for rough finished surfaces of concrete, complete all as specified and directed. |
| 9 | M&L for use and waste form work to edges of concrete flats, treads, break in floors, window cills, concrete railings, openings in concrete walls, floor and roof and not exc. 20cm wide and sides of RCC/PCC bands in walls, horizontal or sloping and similar work exc. 10cm but n.exc. 20cm wide for fair finished surfaces of concrete, complete all as specified & directed |
| 10 | Material ad labour for preparation of new plastered surfaces of walls & applying two coats of oil bound distemper over a coat of wall care putty of 1.5 to 2.0 mm thick and one coat of primer complete all as specified. |
| 11 | Preparation of new plastered/ concrete surfaces of walls to achieve smooth and even surface and applying two coats of cement based paint over and including one coat of primer (up to 2nd storey with necessary/scaffolding) complete all as specified and asdirected by Engr-in-charge. |
| 12 | Preparation of new plastered or unplastered surfaces of ceilings to achieve smooth and even surface and applying three coats of white washing complete all as specified and as directed by Engineer-in-charge. |
| 13 | Preparation of old decorated brick /concrete, plastered /un-plastered surfaces of ceilings, cornices etc by booming down with steel wire brushing, scrapping down smoke soot, moulds, moss, efflorescent salts, oil, greasy spots , rubbing with sand paper and applying one coat of white wash on ceiling, complete all as specified and directed. |
| 14 | Preparation of old decorated brick/concrete/ plastered/unplastered surfaces of walls, Pillars, cornices etc by booming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots, rubbing with sand paper and applying one coat of oil bound distemper on walls, pillars,cornices surface including making good uneven surface/holes with birla wall care putty coloured in same shade where ever required etc. complete all as specified and directed. |
| 15 | Preparation of old decorated brick/concrete/ plastered/unplastered surfaces of walls, Pillars, cornices etc by booming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots, rubbing with sand paper and applying one coat of interior emulsion on walls, pillars,cornices surface including making good uneven surface/holes with birla wall care putty coloured in same shade where ever required etc. complete all as specified and directed. |
| 16 | Preparation of old decorated brick/concrete/ plastered/unplastered surfaces of walls, Pillars, cornices etc by booming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots, rubbing with sand paper and applying one coat of cement base paint on walls, pillars, cornice etc (upto 3rd storey with necessary scaffolding complete all as specified and directed. |
| 17 | Preparation of old decorated brick/concrete/ plastered/unplastered surfaces of walls, Pillars, cornices etc by booming down with steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots, rubbing with sand paper and applying two coats of cement base paint on walls, pillars, cornice etc (upto 2nd storey with necessary scaffolding complete all as specified and directed. |
| 18 | Preparation of old plastered surfaces of walls, chajjas, fascia, face of columns, beams etc. and applying one coat of weather proof exterior emulsion (APEX) making good uneven surface/holes with Birla wall care putty coloured in same shade where ever required etc (up to 2nd storey with necessary scaffolding) complete all as specified and directed. |
| 19 | Preparation of old painted wooden surfaces having width/girth exceeding 10 cm including necessry putty filling with knife of same colour where required to achieve smooth and even surface and applying one coat of synthetic enamel paint on wood surfaces of any description ( up to 2nd storey with necessary scaffolding) complete all as specified and directed |
| 20 | Preparation of old painted steel surfaces having width/girth exceeding 10 cm including necessry rubbing with sand paper or grinding by hand grinder to achieve smooth and even surface and applying one coat of synthetic enamel paint on steel surfaces of any description ( up to 2nd storey with necessary scaffolding) complete all as specified and directed |
| 21 | Writing letters or figures (Block, Roman. Italic or Indian) n.exc 30cm high including obliterating old writing of any description n.exc 0.2 Sqm with paint to match existing work complete all as specified directed Such as NP-02,P-101,T-104. |
| 22 | Hacking out old broken glass (any thickness,size quality or description) from any types of wooden/steel/alum (up to 4th storey) frames or stone concrete or brick surrounds glazed with putty or fixed with beads. |
| 23 | S&F 3.0 mm thick sheet glass ordinary quality glazing with oil putty or any type of beads in square n.exc. 0.5 Sq each pane in any type of frame of iron/Steel/Wood/Aluminium as required at site complete all as specified (upto fourth storey with necessary scaffolding), all as specified and directed. |
| 24 | S&F 3.0 mm thick sheet glass ordinary quality glazing with oil putty or any type of beads in square exc. 0.5 Sq each pane in any type of frame of iron/Steel/Wood/Aluminium as required at site complete all as specified (upto fourth storey with necessary scaffolding), all as specified and directed. |
| 25 | S&F 3. mm thick figured glass, pin head type and glazing with oil putty or any type of beads in square n.exc. 0.5 Sq each pane in any type of frame of iron/Steel/Wood/Aluminium as required at site complete all as specified (upto fourth storey with necessary scaffolding), all as specified and directed. |
| 26 | Securing glass of any description in existing wooden and iron frames glazed with putty/beads including removing loose or decayed putty/beads, painting/oiling one coat on rebates, grooves, reputtying and painting/oiling puttied surface to match existing work ( New length of frame reputtied shall be measured. |
| 27 | Note:- The contract sum arrived after deduction of amount of Sch of credit as listed in tender Documents. Please Enable Macros to View BoQ information |