Tender For Ops Rooma) Removal Of Electrical Equipments (Approx 400 Kgs Each - 5Nos) From Location For Creating Space For Installation Of Atdssub Units Viz : Dcp,Ddr,Mcp,Dbs.B) Fabrication And Installation Of Foundations For Fitment Ofabove .C), Visakhapatnam-Andhra Pradesh
TDR : 54937501
Tender Notice
BOQ
7 Days Left
Visakhapatnam
Andhra Pradesh
Tender For Ops RoomA) Removal Of Electrical Equipments (Approx 400 Kgs Each - 5Nos) From Location For Creating Space For Installation Of AtdsSub Units Viz : Dcp,Ddr,Mcp,Dbs.B) Fabrication And Installation Of Foundations For Fitment OfAbove .C)
Ops Rooma) Removal of Electrical Equipments (Approx 400 Kgs each – 5Nos) from location for creating Space for Installation of ATDSSub units viz : DCP,DDR,MCP,DBs.b) Fabrication and installation of Foundations for fitment ofabove .c) New foundation to be Fabricated and installed for RelocatingRDDU.d) Shifting of New Equipment’s from Workshop to Location isunder Contractors Scope.
2
Ops Room Lobbya) Removal of Electrical Equipments (Approx 400 Kgs each – 5Nos ) from location for creating Space for Installation of ATDSSub units viz : CFP , ITU.b) Fabrication and installation of Foundations for fitment ofabove .c) New foundation to be Fabricated and installed for RelocatingEOGFCSd) Shifting of New Equipment’s from Workshop to Location isunder Contractors Scope
3
Bridgea) Removal of Electrical Equipments, DBs, ,etc (Approx 300 Kgseach – 3 Nos ) from location for creating Space for Installationof ATDS Sub units viz : RDU , DBsb) Fabrication and installation of Foundations for fitment ofabove .c) Shifting of New Equipment’s from Workshop to Location isunder Contractors Scope
4
Quarter Deck(a) Major deck modification is required in quarter deck forfitment of winch system onboard.(b) Winch to be placed after frame number 8 to frame number 15 and between the port side pillar and the centre line of the ship.(c) Winch centre line shall be 2400mm from the ship centre linetowards port side.(d) 03 RU lockers are required to be relocated for installing winch sheave subsystem and Hydraulic power pack.(e) Telephone box and power supply box to be elevated in the same bulkhead to facilitate mounting of winch power panel for which all foundations are to fabricated and Installed and items to be fixed.(f) Clear space is required at the aft and for mounting of the sheave and deployment of the array. The area between 2nd and 3rd frame on aft end to be made available by removing frames and plates and increasing the area of the window.(g) Total space requirement from for Winch system is approx.7m from the aft end for winch and sheave.(j) CVD can be placed on Quarter deck adjacent to Capstan operating panel,(k) Necessary deck strengthening is required to be done at thewinch system location. – Approx 3 Tons(l) Sheaves to be fitted at aft end, after relocating the RU boxesalong with supply of fresh water at 1 bar pressure ( 20 LPM).(m) Hydraulic power pack to be located as per the layout options at Quarter deck.(n) Winch power panel (WPP) JB-winch and JB-PP, automaticchange over switch (ACOS), switch disconnector fuse (SDF), Display unit , Winch, Towed Array, Towed Cable roller must be located at Quarter deckNote :1. All Foundations to be Fabricated and installed bycontractor only.2. Shifting of all items and securing is under contractorsScope.3. Deck Strengthening is under Contractors Scope.4. All in way Jobs to be considered in the Scope.
5
Gun Decka) Launcher Foundations (P & S) to be fabricated and installedin position.(Approx 3000mm Dia)b) Deck strengthening to be carried out on Both Port and StbdGun Deck locations (Approx – 4 Tons-P&S).c) Launchers to be shifted from Workshop and to be fitted inPosition.d) All Degutting of Items, Piercing of Bhds, Bhd Glands Fitmentetc is under contractors Scope.e) Shifting of New Equipment’s from Workshop to Location isunder Contractors Scopef) Pneumatic Lines to be drawn from HP air Bottle to Launchers.( Isolating Valve , Strainer , Pressure Reducer Valve (200-50BAR), Pressure relief Valve, Isolating Valve, Safety ReliefValve along with SS Pipe lines to be installed in the System .BOM attached at Annexure I. )
6
Aviation Store & Aviation Store Lobbya) Removal of Electrical Equipments (Approx 200 Kgs each – 3Nos) from location for creating Space for Installation of ATDSSub units viz : WMC ,FDU-D,Power Supply Boxes,etcb) Fabrication and installation of Foundations for fitment ofabove .c) Shifting of New Equipment’s from Workshop to Location isunder Contractors Scope.
7
Gun Wharf Storea. Fitment of expendable decoy storage racks & Boxesb. Head Phone assemblyTransit case
8
Electrical SPTA Rooma. New Metallic Stowage Lockers to be provided for securing ofMaterials like SPTA, Test Equipment’s etc. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.