| 1 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed. initial leads and lifts as per the direction of Engineer-in-charge. |
| 2 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete as per the direction of Engineer-in-charge. |
| 3 | Cement Concrete (1:3:6)using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T&P etc complete as per the direction of Engineer-in-charge. |
| 4 | C.C. (1:2:4) with 12mm and down grade C.B. chips approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and including cost, carriage, royalty, cost of all labour T.&P. etc complete as per the direction of Engineer-in-charge. |
| 5 | R.C.C. M-20 grade with 20mm and down grade C.B. chips including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but cost of reinforcement complete as per the direction of Engineer-in-charge. |
| 6 | Column base and footing |
| 7 | Plinth band (Grade beam) |
| 8 | Lintel (Ground Floor) |
| 9 | Lintel (First Floor) |
| 10 | Chajja (Ground Floor) |
| 11 | Chajja (First Floor) |
| 12 | Column in Superstrecture, Beam (Ground Floor) |
| 13 | Column in Superstrecture, Beam (First Floor) |
| 14 | Column in Superstrecture, Beam (Second Floor) |
| 15 | Roof slab (Ground Floor) |
| 16 | Roof slab (First Floor) |
| 17 | Roof slab (Second Floor) |
| 18 | Staircase (Ground Floor) |
| 19 | Staircase (First Floor) |
| 20 | Precast slab (Ground Floor) |
| 21 | Precast slab(First Floor) |
| 22 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steelas per the direction of Engineer-in-charge. |
| 23 | Ground Floor |
| 24 | First Floor |
| 25 | Second Floor |
| 26 | Brick work with Fly Ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation&Plinth including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of Engineer-in-charge. |
| 27 | Brick work with Fly Ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Superstructure including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of Engineer-in-charge. |
| 28 | (i) Ground Floor |
| 29 | (ii) First Floor |
| 30 | (iii) Second Floor |
| 31 | Brick work with Fly Ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:4) in Superstructure including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of Engineer-in-charge. |
| 32 | Ground Floor |
| 33 | First Floor |
| 34 | Supplying M.S Door made out with ms flat , angle of approved design & specification including cost of all materials cost of manufacture, cost of one coat of primer, all taxes T&P etc coplete as per the direction of Engineer-in-charge. |
| 35 | Window Grill |
| 36 | Supplying M.S Window made out with ms flat , angle of approved design & specification including cost of all materials cost of manufacture, cost of one coat of primer, all taxes T&P etc complete as per the direction of Engineer-in-charge. |
| 37 | Labour charge for fitting ,fixing of M.S door,window, grill , Gate including all cost etc complete as per the direction of Engineer-in-charge. |
| 38 | 12mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of Engineer-in-charge. |
| 39 | Ground Floor |
| 40 | First Floor |
| 41 | Second Floor |
| 42 | Supplying, fitting and fixing Vetrified tile in floors treads or steps and landing on 20mm thick cement mortar (1:4) 1cement:4 course sand and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-charge. |
| 43 | Ground Floor |
| 44 | First Floor |
| 45 | Supplying, fitting and fixing Granite tile in floors treads or steps and landing of size 30cmx30cm / 40cm x 40cm (special plain/printed series ceramic wall tiles) of approved make conforming to IS 13755 on 20mm thick cement mortar (1:4) 1cement:4 course sand and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of Engineer-in-charge. |
| 46 | Ground Floor |
| 47 | First Floor |
| 48 | Fixing Granite tiles (Above 0.10 Sqm. to 0.40 Sqm) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shades of the tiles including cost of tiles. |
| 49 | Ground Floor |
| 50 | First Floor |
| 51 | Supplying, fitting, fixing of Vetrified tiles of size 600mm x 600mm Coloured /Printed series (Homogeneous) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including all costs complete as per the direction of Engineer-in-charge. |
| 52 | Ground Floor |
| 53 | First Floor |
| 54 | Fixing Glazed tiles (20cmx30cm / 20cm x 20cm special plain /printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including all costs complete as per the direction of Engineer-in-charge. |
| 55 | Ground Floor |
| 56 | First Floor |
| 57 | Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778as windows frame, section no. 4095, 4096 and 9777,3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-in-charge. |
| 58 | Providing and fitting of glass pane (5 mm thick black Glass) for slinding windows and ventilators including cost of all materials, labour T&P etc complete as per the direction of Engineer in charge. |
| 59 | 2.5cm thick grading concrete (1:2:2) on roof slab with 6mm size hard crusher broken granite chips on new work including watering curing cost of all materials, water-proofing compounds, T.& P. required for the works etc complete. |
| 60 | Ground Floor |
| 61 | First Floor |
| 62 | Second Floor |
| 63 | Painting 2 coats with any approved paint in new iron works including sand papering, polising surfaces, cost of paints, cost of all labour, T&P, etc complete in all floors as per direction of Engg-in charge. |
| 64 | Ground Floor |
| 65 | First Floor |
| 66 | Second Floor |
| 67 | Finishing wall surface with Acrylic wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding etc. with cost of all materials, labour T&P etc. complete. |
| 68 | Ground Floor |
| 69 | First Floor |
| 70 | Second Floor |
| 71 | Priming 1 coat with wall primer (water bond) of any approved shade including all costs complete as per the direction of Engineer-in-charge. |
| 72 | Ground Floor |
| 73 | First Floor |
| 74 | Inside wall |
| 75 | Outside wall |
| 76 | Second Floor |
| 77 | Inside wall |
| 78 | Outside wall |
| 79 | Distempering 2 coats to walls with distemper of approved shade on new work to give an even shade including cost of distemper and labour, T & P. etc complete. |
| 80 | Ground Floor |
| 81 | First Floor |
| 82 | Second Floor |
| 83 | Finishing to the exposed surfaces of wall with weather coat of any approved shade on new work 2 coats over 1 coat of primer to give an even shade including cost of weather coat all cost of all labours and T&P etc complete as per the direction of Engineer-in-charge. |
| 84 | Ground Floor |
| 85 | First Floor |
| 86 | Second Floor |
| 87 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32mm x 2mm @ 0.90 mtr C/C and stainless aquare pipe bracing of size case as per approved design and specification, buffing, polishing etc. with the cost, conveyance taxses of all material, cost of all labour etc. complete in all respect. (in all floor) |
| 88 | MACHINERIES FOR DEMOLISHING & LAND SCARPING |
| 89 | Hydraulic Excavator of 1 cum bucket |
| 90 | Tipper-5cum for transportation Please Enable Macros to View BoQ information |