| 1 | Dismantling AC / GI / Tufflite / Aluminium/Zincalum sheet roofing, side cladding etc and depositing the debris away from plant limit within a distance of 150 m. |
| 2 | Dismantling AC/Aluminium/Zincalum ridge pieces and clearing away debris from the plant limit. |
| 3 | Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out initally & then removal of structural after cutting to suitable length to FACT ,Phase-1 scrap yard through mechnical means (Measurements will be based on actual weight taken at FACT's weigh bridge if required by Engineer-in-Charge) |
| 4 | Supplying, Conveying, fabrication and erection of structural steel work bolted or welded at all levels as per scope drawing for trusses, purlins, louver brackets, louver runners bracings, stair cases, platforms, hand rails ladder, threaded sag rods, splices, etc. with M.S angles, channels, tees, flats, RSJs, rods, pipes and plates including cutting, welding, cleaning, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts.(The structural steel material shall be of M/s. SAIL / RINL / TISCO /JINDAL make) - Required gas and electrodes will be supplied free of cost by FACT at stores |
| 5 | Erection of fabricated structural (dismantled or serviceable) at all levels such as trusses, brackets etc. including conveying repairing if any by straightening, cutting, welding etc. and erecting to lines and levels as per deptl. instructions. (The fabricated structural, gas & electrodes will be supplied by the Company free of cost). |
| 6 | Fabrication and erection of structural steel works bolted or welded as per drawings at all levels for trusses, ladders splices, frame work, base plates, HD bolts, purling, cleats, struts etc. including drilling, welding, cleaning the structural, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts (Structural, gas & electrodes will be supplied free of cost by the Company) |
| 7 | Roofing/side cladding with AC corrugated/Semi corrugated sheets 6 mm thick with 7 mm or nearest available dia and suitable length GI Hooks/bolts and nuts,GI and bitumen washers , cutting sheets to required shape/length, providing a minimum overlap of 150 mm at ends including cost of AC sheets and all other materials, scaffolding charges etc complete at all heights. |
| 8 | Providing AC Corrugated/semi corrugated ridge capping with 7 mm or nearest dia and suitable length GI hooks/bolts and nuts, GI and bitumen washers etc,providing required overlaps at ends including cost of all materials including ridge, scaffolding charges etc complete at all heights. |
| 9 | Painting with one coat of zinc chromate yellow metal primer and two coats of synthetic enamel paint using approved brand & quality at all heights after cleaning the surface by using waterjet spray/ manually including cost of all paint and materials, labour charges, etc.complete as per deptl instructions. Please Enable Macros to View BoQ information |