|
| 1 | Supplying of required men, non-consumables (other than mention in Item no. 3)etc. and providing of necessary tools and appliances etc. Cleaning of toilets including sweeping, washing of floors, dado/ skirting portion, wash basins, urinals pans,IWC/EWC, glazed tiles etc. and disposing off the dirt, including fixing the urinal waste pipes and wash basin waste pipes etc. in the following building toilets complete as per schedule, as per specifications and directed by the Engineer. Note: Any consumables required for the above work will be paid separately under relevant items. |
| 2 | Two Times in a day Cleaning area ( 175Sqm) - CCR Building, Works Building and Chemical Lab.(Note; Rate per sqm per each cleaning opertion area) |
| 3 | Once in a day cleaning area (200Sqm) - R & M shop, Garrage, SS04, Fire station, ISG, H2S, South, North, East Sub Station, DU Building, Chemical House, DM Plant, ETP, N2 Plant , Recovery and Intake well in Main Plant area. |
| 4 | Providing all tools, tackles, manpower & non-consumable materials (other than mention in Item no. 3) etc. for sweeping and moping in buildings including all rooms, halls, corridors, open verandahs, staircases, entrance area, trough etc. on daily / scheduled basis as decided and approved by EIC using cleaning agents and disinfectant for keeping the floor clean, free from stain, mud, dirt, liquid spills and other debris, removal of cobwebs and cleaning of oil spilled areas whenever required etc. for keeping neat and clean area in and around of individual building and removal of the waste materials and disposal of the same to a designated dustbin outside/nearby the building complete as per the specifications and as directed by the Engineer-In-Charge. Note: 1) Actual Area cleaned only will be measured for payment.2) Any consumables required for the above work will be paid separately under relevant items. |
| 5 | Supply & stacking of the following items of approved commercial grade for daily consumption at HWPM plant site for housekeeping works as per the specifications and as directed by Engineer in Charge. Note:1) Materials sample should be got approved by the Engineer-in-Charge before supply for the work.2)Contractor should supply the consumables within a week time after the demand raised by Engineer in charge as per the requirement by instruction note or email means , failure to which deaprtment will arrange for material at the risk and cost of contarctor . Further double cost of materials will be recovered from the bill due to the contractor and any loss to contractor whatsover will not be entrained by the department in this regards.3)Materials shall be deposited in civil store well in advance only after written instruction receive from EIC.4) Labour required for applying above huosekeeping items will be considered under relavent item. |
| 6 | Godrej/Odonil Zipper air packet (multicolour)10 gm pack |
| 7 | Dettol/ Lifebouy Hand Wash liquid soap in sealed containers( in 5 litre Pack only) |
| 8 | Gainda /Bengal Chemical black phenyle surface Disinfectant floor cleaner liquid in sealed container ( In 5 litre pack only) |
| 9 | Lizol / Mr. Muscles Disinfectant Surface cleaner in 5 Litre can |
| 10 | Harpic / Presto disinfectant Toilet cleaner In 5 Litre can |
| 11 | Cotton Mop ( weight not less than 450 gms) |
| 12 | Cello Kleeno / Gala Plastic Double Hocky Toilet cleaning Brush |
| 13 | Odonil/ Godrej liquid room feshner spray of 220 ml |
| 14 | Odonil /Godrej multi fragrances block (Each block 4X48 grams) |
| 15 | Hard Broom (Final dressedbroom should be of minimum 1.0 M length & minimum weigth 400 gm) |
| 16 | Gala Soft broom (Minimum length of 1.0M minimum weight of 500 gm) |
| 17 | Gainda / Presto Napthaline ball or other brand approved by EIC (1 Kg pack only) |
| 18 | Gala / Cello Kleeno double lip Wiper of minimum size 30W x 85H |
| 19 | 500 ml Empty new HDPE / plastic bottle with cap of toilet and room cleaner disinfectant like harpic and lizol type. |
| 20 | Black Hit / Baygon Anti mosquito spray in 200 ml bottle |
| 21 | Colin Glass and Surface Cleaner Liquid Spray in 500 ml spray bottle |
| 22 | Gala Water Absorption Sponge (multipurpose) Wipes each ( 5 sponge wipe in 1 pack) |
| 23 | Providing necessary tools ,appliances and non consumable materials ( other than mention in item no-03) etc. for cleaning & sweeping of BOOSTER area , sweeping of XU-I, XU-II & H2S Generation Unit by using Manual Battery Operated Industrial Sweeper having following specifications , 1) Dump type-Manual, Productivity @ max fwd speed(m2/hr)- 6955 ,farward speed(km/hr)- 7,Operating voltage(V)- 24 , Material of Chasis - Mild Steel as per IS :2062(Grade-A) ,Material of Body: Polypropylene, Wheels: Solid Rubber, 2) Type of movement: Ride-on ,Hopper Dust Load Capacity(Ltrs): 85, Dust Control Systems: Dry, 3) Details of Brush: i) Central Brush width-700mm, ii) Brush speed(rpm)-500,iii)Number of side brushes-1, iv) Working width(with side brush)-1200 mm,v) Dia of side brushes-400 mm,4) Details of Battery : i) Power Source -Rechargeable Battery, ii) Battery Chemistry- Alkaline, iii) Number of Batteries required for operation - 4, iv) Battery backup time under continuous use- 2 Nos , v) Battery Bank voltage (V) -24, vi) Capacity of Battery (AH)- 175, vii) Battery charger- High efficiency type. collection of waste papers, used wate cotton etc. and disposing the same to the nearest dustbin complete as per schedule periodicity, as per specifications and as directed by the Engineer. ( by following all safety precautions and personal protective equipments for hazardous area) Note: (i) Minimum 2 No's manpower (Male person only) to be engaged for item no 4.1,4.2 and 4.3 , (ii) - Contractor has to bring new machinery for this work and has to submit the relevant document to the department for verifation before the takeup the job. |
| 24 | Booster area in XU - I & II ( 2400+2400Sqm) - Daily (Note- Minimum 2 No's manpower to be engaged for this job.) |
| 25 | XU - I & II Paved area (14675 + 14800 Sqm) ( Execution periodicity) - Once in a Week. Note - 1 No Sweeper vehicle operator ,1 No Assistant & contract supervisor to be engaged for this job. |
| 26 | H2S area ( 8030 Sqm) (Execution periodicity) - Twice in a Week. Note - 1 No Sweeper vehicle operator ,1 No Assistant & contract supervosor to be engaged for this job. |
| 27 | Supplying of required men, materials, non consumables(other than mention in Item no. 3) etc.and providing of necessary tools and appliances etc. for cleaning in H2S Process drain pit with water jetting and disposing of dirt, waste etc. including all leads and lefts complete as per specifications and as directed by the Engineer. (Pit size 21.00 m X 13.00 m = 273 Sqm) - Bimonthly |
| 28 | Providing Cycle - Rickshow with mounted trolley, supplying of required men and materials for collection and disposal of garbage, scrap materials, debris, rubbish and other waste materials etc. from all area dustbins in the main plant located at various points of the plant including loading, transport, unloading at designated disposal ground in the plant and burning the same under controlled fire condition (as and when necessary) etc. complete as per specifications and as directed by the Engineer. (Once in a Week) |
| 29 | Supplying and applying a mixture of Bleaching powder and Lime in the proportion 1:2 including transportation, spreading around the buildings/dustbins etc. complete as directed by the Engineer. (Each Operation should contain 25 Kg Bleaching Powder mix with 50 Kg Lime) |
| 30 | Disposal of scrap materials, debris, rubbish and other waste materials etc. laying at various locations of the plant including removal loading, unloading and disposal of the same within the plant and burning the same under controlled fire condition if necessary etc. complete as directed by the Engineer. |
| 31 | Supplying required Chemicals and applying for Rats, including Bandicoots and Mice in public buildings/ industrial areas including and all other areas vulnerable to rodents in and around the buildings by using ready to use anti-coagulation rodenticide (BROMODILONE/HIT RAT GLUE PAD) weight of each packet not less than 80 grams like Racumin tracking powder/Robon cake or equivalentcomplete as per specificationand as directed by the Engineer. |
| 32 | Cleaning the terrace / chajja portion of the buildings at all heights, removal of vegetation if any, picking of the waste materials, debris, disposal of the same within a lead of two km including insurance to workmen etc complete as directed by the engineer. |
| 33 | Providing manpower, material for dechocking of sewage lines and chambers/ manholes etc at various locations in HWPM as and when required, including removal of sludge from ICs/ manholes, SW pipe line in between the chambers/ manholes ensuring free flow of sewage, disposing of the mud/ sludge within a lead of 1km etc complete as per specifications and as directed by the EIC. |
| 34 | Providing required men and materials for cleaning the site drinking water over head tank (OHT) in main plant area & throughly cleaning the internal surfaces of walls, floors and ceilings including rubbing all the internal surfaces with brushes, removing the algae, fungi, mud, slurry, cobwebs and removing the foreign materials if any and washing the surfaces with bleaching powder complete as per specifications and as directed by the Engineer-in-charge. Note: All the tools, tackles, brushes, ladders, ropes and bleaching powder for cleaning works has to be brought by the contractor. The height of the tank is around 25M, contractor should follow all safety procedures and take safety precautions and execute the work safely. |
| 35 | Cleaning of Toilet floors,walls,fittings,sanitary appliances and drainage outlets using a high pressure Jet System having following specifications 1) Electric or diesel powered ,2) Having working pressure 120 to 150 bar & maximum pressure up to 180 bar, 3) Water flow rate between 10 to 15 litres per minute ,4) Electric motor : 2.2 kw to 5.5 kw or Diesel engine : 5 hp to 10 hp having high pressure hose minimum 10 meters length and adjustable spray nozzles ( fan and jet ) , safety valve for pressure regulation including application of cleaning agents and disinfectants ( will be paid separately under relevant item) including all machinery , manpower,tools,tackles and safety PPE etc.,as per the schedule and as directed by the Engineer in Charge. (Note: Each Lot contains 8 hours of time ) Note- contractor has to bring new machinery for this work and has to submit the relevant document to the department for verifation before the takeup the job. Please Enable Macros to View BoQ information |