|
| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR SUPPLY AND INSTALLATION OF 11 KV TPMO UNDER CHALANG SECTION, IT PARK SECTION AND IT PARK-2 SECTION UNDER EDSD, IT PARK UNDER EDD, RAIPUR AGAINST E-TENDER SPECIFICATION NO. 03/EDCRDDUN/2026-27 1- Est.No.-1(IR.SR2503370)- Supply & Installation of 11 KV TPMO under Chalang Section.2- Est.No.-2(IR.SR2503373)- Supply & Installation of 11 KV TPMO under IT Park Section.3- Est.No.-3(IR.SR2503377)- Supply & Installation of 11 KV TPMO under IT Park. Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Est.-1 Est.-2 Est.-3 TotalQty Rate Amount Part [A] (Supply Portion) |
| 2 | Holding Clamp for ST Pole SP-55 with N&B |
| 3 | Stay Clamp for ST Pole SP-55 with Nut & Bolt |
| 4 | 11 KV Go Switch_D |
| 5 | Bolt & Nuts off size |
| 6 | C-Wedge Clamp for ACSR Rabbit Conductor |
| 7 | Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. |
| 8 | GI Strip 40x6 mm 0.0 |
| 9 | Carriage of following type of Material from store centre/JE store to site of work distance approximate 21 -50 km. With loading & unloading complete: - a) ST Pole SP-55 (Galvanized) Nos 34.0 20.0 48.0 102.0 0.0 b) Stock Material Qtl 24.33 15.0 20.0 59.33 0.0 |
| 10 | Head load cartage of following material from road to site (0-1 Km) a) ST Pole SP-55 (Galvanized) Nos 34.0 20.0 48.0 102.0 0.0 b) Stock Material Qtl 24.33 15.0 20.0 59.33 0.0 |
| 11 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 12 | Erection of following Double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. a) ST Pole SP-55 (Galvanized) Nos 17.0 10.0 24.0 51.0 0.0 |
| 13 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual. |
| 14 | Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. |
| 15 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESPO sehedule and local approved drawing. |
| 16 | Erection and Earthing of support with M.S. Earth rod of 2.5 meter long including excavation of pit and digging of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 17 | Making of section pole for existing LT/HT/33KV line complete in all respect. |
| 18 | Painting of poles with angle and channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. ST Pole SP-55 Nos 34.0 20.0 48.0 102.0 0.0 |
| 19 | Jumpering Section Pole |
| 20 | Mounting & Fixing of TPMO on double pole structures including making of connections complete work |
| 21 | Fixing of Accessories |
| 22 | Fixing of Channel, Angle on Pole |
| 23 | Excavation, Erection of stay set complete work. |
| 24 | Route cleareance by cutting of tree branches/pruning, lopping and chopping of trees for LT, 11 & 33 KV line |
| 25 | Fixing Wedge Clamp for Rabbit-Rabbit Con. |
| 26 | Installation & Fixing of Chemical Earthing Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |