| 1 | Excavation in earth work and disposal of all excavated earth up to a lead of 20mtrs (twenty metres) and lift up to 1.50 mrs (one point fifty metres) disposing earth to be leveled and neatly dressed |
| 2 | Removal of slips in all kinds of soil including saturated soil but excluding boulders & rock protion req. belasting) up to a distance of 20mtrs. Disposing unserviceable material and neatly dressing the surface.with in all leads and lifts as directed by the Engineer-in-charge. |
| 3 | Clearing Jungle including uprooting of rank vegetations, grass, brush wood, trees and saplings of grith upto 30 cm |
| 4 | Cement concrete lining 15cm thick or less for irrigation channels,using cement concrete 1:3:6 (1cement: 3 sand: 6 graded stone aggregate 40mm (Forty millimeter nominal size) and curing complete excluding cost of from work in foundation and plinth with in all leads & lifts as per entire satisfication of Engineer-in-Charge. |
| 5 | Hand mixed concrete lining in bed |
| 6 | Hand mixed concrete lining on hill side |
| 7 | Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge. |
| 8 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like with in all leads aand lifts as per the direction of the Engineer in Charge. |
| 9 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts as per the directions of the Engineer in charge. |
| 10 | Providing andf laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification. |
| 11 | Boulder filling behind R/wall & B/wall within all leads and lifts and as directed by the Engineer-in-charge. |
| 12 | Providing and fixing of Finolex pipe 50mm dia. In R/Wall including all re-fitting i/e elbowa, sockets etc. with in all leads aand lifts as per the direction of the Engineer in Charge. |
| 13 | Laying, butt welding and testing of ISI marked steel tubes plain ended in trenches of following dia as per IS 1239-2001, including jointing the pipes butt welding at both standards/approved specifications including manufacturing reducers/tapers, all short pices and bends as per site requirement and made from parent tubes ( to be measurer and paid alongwith pipes. Bends shall be manufactured in such a way that not more than 111/4 degree deflection is caused by a single cut and internal dia is not reduced including hydraulic testing to the entire satisfaction of Engineer-in-charge. The damaged portion of galvanization due welding shall be provided with anticorrosive treatment by providing two coats of bituminous paint over priming coat as per AWWA specification C-203 1978. (Earth work to be measure & paid for separately). |
| 14 | 100mm dia |
| 15 | Providing and laying cement concrete 1:2:4 (1cement :2 Sand: 4 graded stone aggregate 20 mm (Twenty millimeter nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Column, pillar & post upto floor two level with in all leads & lifts as per direction of Engineer - in charge. |
| 16 | Providing and fixing of mild steel/ tor steel reinfircement for rainforced concrete work I/C bending, binding and placing in position complete upto floor two level with in all leads and lifts as per the direction of the Engineer in Please Enable Macros to View BoQ information |