| 1 | Details of Supply (A) 40 MVA III (New T/F) |
| 2 | PG clamp made of Aluminum Alloy fitted with 04 Nos. suitable size of GI Nut & Bolts with washer suitable for Moose to Moose conductor. |
| 3 | PG clamp made of Aluminum Alloy fitted with 04 Nos. suitable size of GI Nut & Bolts with washer suitable for Moose to Panther conductor. |
| 4 | PG clamp made of Aluminum Alloy fitted with 04 Nos. suitable size of GI Nut & Bolts with washer suitable for Panther to Panther conductor. |
| 5 | 33KV CT Junction Box |
| 6 | Fire Fighting CO2 Type of 22.5 KG |
| 7 | Supply of flexible copper bond (rope type) of size 450mm long, 16mm dia & both side copper lugs heaving hole of 16mm dia and complete with nut-bolt & washer. |
| 8 | Supply of laminated strip type copper bond of size 700mm long, 16mm dia & both side copper lugs heaving hole of 18mm dia and complete with nut-bolt & washer for using in transformer neutral bushing to earth. |
| 9 | HDG Nut Bolt & washer size of 16*40 |
| 10 | HDG Nut Bolt & washer size of 16*45 |
| 11 | HDG Nut Bolt & washer size of 16*50 |
| 12 | HDG Nut Bolt & washer size of 16*35 |
| 13 | 75*10mm MS Flat (TATA JINDAL SAIL ONLY) |
| 14 | 50*6mm MS Flat (TATA JINDAL SAIL ONLY) |
| 15 | 25*6mm MS Flat (TATA JINDAL SAIL ONLY) |
| 16 | Cable tray 75mm |
| 17 | Cable tray 225/250mm |
| 18 | Supply of Bajaj/Syska/CGL/Standard make 150 Watt Edge LED street light. |
| 19 | Supply for 40 MVA T/F II & 33KV Sec Isolator |
| 20 | Supply of bolted type tension fitting with turn buckle and all accessories for single Moose conductor for 132 kv 40 T/F II Jack bus. |
| 21 | Supply of bolted type tension fitting without turn buckle and all accessories for single Moose conductor for 132 kv 40 T/F II Jack bus. |
| 22 | Supply of bolted type tension gun fitting with turn buckle and all accessories for twin Moose conductor for 33KV Mainbus. |
| 23 | Supply of bolted type tension gun fitting without turn buckle and all accessories for twin Moose conductor for 33KV Mainbus. . |
| 24 | PG clamp made of Aluminum Alloy fitted with 04 Nos. suitable size of GI Nut & Bolts with washer suitable for Panther to Panther conductor. |
| 25 | PG clamp made of Aluminum Alloy fitted with 04 Nos. suitable size of GI Nut & Bolts with washer suitable for Moose to MOOSE conductor. |
| 26 | 70KN Porcelain Disc |
| 27 | Supply of 02 no. U Bolted Type Single suspenstion fitting assembly suitable for twin ACSR Moose conductors complete with hardware fitting, socket eye, Ball Hook, Yoke Plate, J-Hook etc. as per technical specification as per sample. |
| 28 | Details of Work (B) |
| 29 | Following works are required for complete erection of 132 KV& 33KV Transformer bay at 132 KV S/S Shankargarh Road under Electy. Trans. Division-III, Prayagraj. |
| 30 | Shorting, counting and shifting of galvanized structure to loading point and loading it on vehicle at EFU-Naini, Prayagraj. |
| 31 | Carriage of above 5.28 MT structure from EFU Naini, Prayagraj to 132 KV S/S Shankargarh Road approx. distance 50km. (vehicle, man, materials provided by contractor at his own cost) |
| 32 | Unloading, shorting, counting member wise and stacking properly galv. structure at the store of 132 KV S/S Shankargarh |
| 33 | Removal of all oil,grease,dust from black ungalvanized structure using a solvent or detergent then use mechanical cleaning to expose metals.After complete dry surface and free from dust.Apply Zinc rich primers containing high level of metallic zinc(85-95% zinc by weight in dry film) and Apply it with the help of spray machine with the help of skilled helper. Also apply one coat of epoxy intermediate paint and lastly apply one coat of polyurethane aliphatic finish. |
| 34 | Erection of auxiliary structure for installation of 132KV & 33KV BSI, LSI, PT, CT, LA and all associated structures for 132/33KV 40 MVA T/F bay, including shifting of all material i.e. structure part ,nuts, bolt ,washers etc from substation store to erection site. Matching of holes,matching of member if required shall be done by contractor. |
| 35 | Loading & Carriage of MS round Bar 36/40mm , 300MTR from following substations others S/S to 132 KV S/S Shankargarh |
| 36 | Unloading of MS round Bar 36/40mm , 300 at 132KV Shankargarh approx. |
| 37 | Laying of 36/40mm MS round bar,800mm below ground level in soil including excavation of trech, cutting,welding/painting,its back filling and all other associated work for 132/33 kv Transformer bay at 132kv s/s Shankargarh. MS round bar will be provided by department. |
| 38 | Fabrication of 4mtr long electrode of 36/40mm dia MS round bar having 150mm long conical shape and fixing vertically below the earthmat level and its weildingwith main earth mat and its painting. |
| 39 | Shifting of material from store to erection place in switchyard of following equipments-132 KV & 33 KV( CB, LA, CT, PI, BSI and all associated material ) as per requirements. |
| 40 | Erection of following equipments as per instruction of JE/SDO manual/hydra of various equipments including shifting from store to erection site including all other associated work to complete the job satisfactorily:- |
| 41 | 132 KV Bus isolator |
| 42 | 132 KV SF-6 circuit breaker |
| 43 | 132 KV C.T |
| 44 | 132 KV C.T junction box |
| 45 | 33 KV Bus isolator with junction box |
| 46 | 33 KV CT |
| 47 | 33 KV CT junction box |
| 48 | 33KV Vacuum circuit breaker |
| 49 | 120 KV LA |
| 50 | 30 KV LA |
| 51 | Splitting of main bus and Jumpering of equipments, 132 KV & 33 KV BSI, CB, CT, LA and also jumpering to Main Bus as required with the help of Panther/moose conductor and suitable clamps/connectors including, cutting, bending, shaping etc. of the Conductor as per Site Requirement. Connector & other hardware fitting provided by department. |
| 52 | Earthing of following main and auxilliary structure,equipments and panels and cable trench with the help of specified size MS flat along with cutting,bending and straightening of MS flat to give it proper shape,painting of all type of joints,risers,strips,with one coat of red oxide primer and two coat of green enamel paint in all side of surfaces as per drawing of earthing and standard practice including cost of all required consumables material ,T&P, Labour etc. |
| 53 | Earthing with 75*10mm MS Flat |
| 54 | Earthing with 50*6mm MS Flat |
| 55 | Earthing with 25*6mm MS Flat |
| 56 | Excavation of Trench in Rectangular shape around L.A. structures for Mesh Earthing for 03 Nos. 120KV LAS by Fabrication of 06 Nos. 4 Meter long Electrodes with 36mm/40mm dia. M.S. Round having 150 mm long conical Shape, its Piercing Vertically in Ground with top 800 mm below ground level, Jointing Electrodes with 75*10 mm M.S. Flat by proper Welding. Two No. risers of 75*10 mm M.S. Flat shall be welded with existing main earth mat to Auxiliary structure, one separate riser will be taken from the laid earth mat to corresponding L.A. through surge counter for making of proper Mesh. Painting of the Shielding| Mesh/Earthing Strips with anti-corrosive Paint and back filling of excavated trench including the cost of labour, T&P etc. |
| 57 | Excavation of Trench in Rectangular shape around L.A. structures for Mesh Earthing for 03 Nos. 30KV LAS by Fabrication of 04 Nos. 4 Meter long Electrodes with 36/40mm dia. M.S. Round having 150 mm long conical Shape, its Piercing Vertically in Ground with top 800 mm below ground level, Jointing Electrodes with 75*10 mm M.S. Flat by proper Welding. Two No. risers of 75*10 mm M.S. Flat shall be welded with existing main earth mat to Auxiliary structure, one separate riser will be taken from the laid earth mat to corresponding L.A. through surge counter for making of proper Mesh. Painting of the Shielding Mesh/Earthing Strips with anti-corrosive Paint and back filling of excavated trench including the cost of labour, T&P etc. |
| 58 | Laying and termination of following size of unarmoured control cable from control room to equipment cable rack (CB,CT etc) via cable trenches and fixing of it with the help of 25x3mm aluminium strip and 6mm dia GI nut and bolts on cable rack up to termination point by cable tray including tag wielding on equipments as per AE/JE direction and all associated works to complete the job satisfactorily. |
| 59 | 10Cx2.5 sqmm. |
| 60 | 6Cx2.5 sqmm. |
| 61 | 4Cx2.5 sqmm. |
| 62 | 2Cx2.5 sqmm. |
| 63 | Cable termination at VCB/CT/PT/BSI Junction Boxes,Marshalling box,OLTC and other associated work to C&R Panel and CT/PT turrets to CT/PT Junction boxes with proper ferruling & dressing (Ferrule provided by contractor). |
| 64 | 2x2.5 mm2 |
| 65 | 4x2.5 mm2 |
| 66 | 6x2.5 mm2 |
| 67 | 10Cx2.5 sqmm. |
| 68 | Erection of control & relay panel for 40MVA T/F including shifting from store to erection site and proper earthing of panel and all associated work to complete the job satisfactorily. This work also include termination of all control cable in panel and associated equipments such as CB, LSI,BSI, CT,PT and all associated works. |
| 69 | Providing & fixing equipment names plate of MS Sheet 16 gauge of size 200x300 mm with hole of S/S in the top centre for fastering & writing name of equipment black colour after painting sheet with 02 coat of red primer & 01 coat Yellow colour. |
| 70 | Providing & fixing bay name display board of MS Sheet 16 gase size 400x250 mm with the help of MS pipe having inner frame approx. size 2\\"x1\\" with welding of two legs of MS angle of 03 feet and writing name of bay black colour after painting sheet with 02 coat of red primer & 01 coat yellow colour both side of display board including digging, grounting, concreating (1:2:4 Ratio), 1.5 feet from ground level & all associated work to installed Bay name display board. |
| 71 | Providing and fixing of protective wire mesh net of 1\\"*1\\" size having 4mm thickness between 40MVA T/F and LV side 33KV LA,fabrication of wire mesh frame the work including cutting,strengthening,welding and drilling of angle of size 5m*4m making 4m*3.5m size pocket for fixing net in frame. Top side fabrication the channel for fixing of post insulator 2*22kv top side to pass the jumper for reducing the load of LV side bushing. Digging the pit for foundation of size 12\\"*12\\"*24\\" and grouting the frame with cement stone,and sand in ratio 1:2:4(angle,MS flat shall be provided by department )free of cost. |
| 72 | Dismantaling of existing equipment/structures of 40 MVA TF II bay including shifting of material from workplace to store place. |
| 73 | Destringing of 132 KV Jack bus bar of ACSR Panther Conductor between 132 KV Mainbus to 40 MVA TF II including de-hoisting of disc insulators ,tension string with tension fitting from gantary (01 job per phase) |
| 74 | 145 KV SF 6 CB with structure of 40MVA TF II |
| 75 | Determination shifting of Control Cables with Proper ferruling of above dismantled 145 KV CB |
| 76 | 132 KV Isolator |
| 77 | 132 KV Tandem isolator |
| 78 | Safely dismantling of Lattice type structures including sorting, stocking, counting & loading etc. |
| 79 | BTI(01SET),BBL (02 SET),DKR(02SET),ABR (01set),ALP( 10set) |
| 80 | Dismantaling & Shifting of old 250KVA Station TF by opening 03 nos jumpers and clamp and LV side cable from its plinth to the store. |
| 81 | 33 KV Station TF Isolators . |
| 82 | 145 KV Post Isolator with with structure |
| 83 | Opening of exixting Jumpers of 132/33KV 40MVA TF II |
| 84 | Erection/Termination of following structure/equipments including their shifting from S/S store to erection. |
| 85 | Lattice type structure(04 Nos DKR,02 ABR,04 APR, 04TMR/YMR, 01 Nos CGR, 02 Nos CCR, 03 Nos ABL & 5 Nos ALP) |
| 86 | 145 KV BSI with Post insulator |
| 87 | 145KV SF6 CB |
| 88 | 145 KV Post insulator |
| 89 | 33KV Isolator with junction box |
| 90 | Interconnection ,laying & termination of of various size control Cables between C&R Panel and 145 KV CB after shifting of of CB with proper ferrule |
| 91 | Lifting of old 250KVA Station TF and placing on plinth by manpower and hydra work also includes jumpering of 03 nos jumpers and connect LT cable of ACDB with providing and precing new 03 nos lug making proper earthing. |
| 92 | Stringing of 132 KV Jack bus of with ACSR Single Moose Conductor including hoisting of disc insulators, tension string with tension fitting from gantary (01 job per phase) |
| 93 | Jumpering of equipments of 132/33KV 40MVA TF II with the help of ACSR Moose/Panther as per site requirement |
| 94 | Shifting of power cable from store to work place & laying of 33kV, 1-core 630mm2, XLPE copper conductor Power Cable to connect 33kV side of T/F (200 meter) |
| 95 | Installation of 33KV, 630 mm2, XLPE Power Cable outdoor termination kit for all six phases (06 Set). (01 set = 2 phases) (01 job include 3-phases of cables) [ Please Enable Macros to View BoQ information |