| 1 | Civil works |
| 2 | STRUCTURAL WORK - Rate shall be inclusive of dewatering work (pumping out and removing slush) while execution in under water condition. For all civil work silica sand to be used further all work such as civil, mep, landscape etc subject to approval of Engineer in charge & architect. Earth Work -Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil |
| 3 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil |
| 4 | Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil |
| 5 | Add extra for Disposing off the excavated stuff of above items for lead of (A) 50 m to 100 m |
| 6 | Add extra for Disposing off the excavated stuff of above items for lead of (B) 100 m to 200 m |
| 7 | Add extra for Disposing off the excavated stuff of above items for lead of (C) 200 m to 300 m |
| 8 | Add extra for Disposing off the excavated stuff of above items for lead of (D) 300 m to 400 m |
| 9 | Add extra for Disposing off the excavated stuff of above items for lead of (E) 5KM |
| 10 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. |
| 11 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. |
| 12 | REINFORCE CONCRETE WORK - Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained) |
| 13 | Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained) (Cement level 450 kg ) |
| 14 | Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained) (Cement level 475 kg ) |
| 15 | Providing and laying in position Ready Mixed M-350 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash(Min cement level as per latest IS 456 shall be maintained) (Cement level 500 kg ) Please Enable Macros to View BoQ information |
| 16 | Providing and laying in position Ready Mixed M-350 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash(Min cement level as per latest IS 456 shall be maintained) (Cement level 500 kg ) Please Enable Macros to View BoQ information |