| 1 | Hire and labour charges for supply,fixing and dismantling of Pedastal Fan on existing support (2 days) |
| 2 | Hire charges for maintaining of Pedastal Fan (14 days) |
| 3 | Hire and labour charges for supply, fixing and dismantling 48\\" Ceiling fan on the existing clamp or support (2 days) |
| 4 | Hire charges for maintaining of 48\\" Ceiling fan (14 days) |
| 5 | Hire and labour charges for supply, fixing and dismantling of 4'40W patty tube light on the existing clamp or support(2 days) |
| 6 | Hire charges for maintaining of 4'40W patty tube light (14 days) |
| 7 | Hire and labour charges for supply, fixing and dismantling of 15A / 5A plug sets (2 days) |
| 8 | Hire charges for maintaining of 5A / 5A plug sets from. (14 Days) |
| 9 | Hire and labour charges for supply, fixing and dismantling of 200W LED fitting with suitable cross arm on existing support (2 days) |
| 10 | Hire charges for maintaining of 200W LED fitting (14 days) |
| 11 | Hire and labour charges for supply, fixing and dismantling of 20A AC plug sets (2 days) |
| 12 | Hire charges for maintaining of 20A AC plug sets for 14 days |
| 13 | Hire and labour charges for supply laying off and dismantling of 3 1/2 x 150 sqmm LTUG Cable (2 days) |
| 14 | Hire charges for maintaining of 3 1/2 x 150 sqmm LTUG Cable (14 days) |
| 15 | Hire and labour charges for supply laying off and dismantling of 3 1/2 x 120 sqmm LTUG Cable (2 days) |
| 16 | Hire charges for maintaining of 3 1/2 x 120 sqmm LTUG Cable (14 days) |
| 17 | Hire and labour charges for supply laying off and dismantling of 3 1/2 x 70 sqmm LTUG Cable (2 days) |
| 18 | Hire charges for maintaining of 3 1/2 x 70 sqmm LTUG Cable (14 days) |
| 19 | Hire and labour charges for supply laying off and dismantling of 3 1/2 x 50 sqmm LTUG Cable (2 days) |
| 20 | Hire charges for maintaining of 3 1/2 x 50 sqmm LTUG Cable (14 days) |
| 21 | Hire and labour charges for supply run off and dismantling of 4 of 17/19 sq mm wire (2 days) |
| 22 | Hire charges for maintaining of 4 of 17/19 sq mm wire (14 days) |
| 23 | Hire and labour charges for supply run off and dismantling of 4 of 19/16 sq mm wire (2 days) |
| 24 | Hire charges for maintaining of 4 of 19/16 sq mm wire (14 days) |
| 25 | Hire and labour charges for supply run off and dismantling of 4 of 7/16 sq mm wire (2 days) |
| 26 | Hire charges for maintaining of 4 of 7/16 sq mm wire (14 days) |
| 27 | Hire and labour charges for supply run off and dismantling of 4 of 19/18 sq mm wire (2 days) |
| 28 | Hire charges for maintaining of 4 of 19/18 sq mm wire (14 days) |
| 29 | Hire and labour charges for supply run off and dismantling of 4 of 7/18 sq mm wire (2 days) |
| 30 | Hire charges for maintaining of 4 of 7/18 sq mm wire (14 days) |
| 31 | Hire and labour charges for supply run off and dismantling of 2 of 7/20 wire(2 days) |
| 32 | Hire charges for maintaining of 2 of 7/20 wire (14 days) |
| 33 | Hire and labour charges for supply run off and dismantling of 2 of 2.5 sqmm wire (2 days) |
| 34 | Hire charges for maintaining of 2 of 2.5sqmm wire (14 days) |
| 35 | Hire and labour charges for supply run off and dismantling of 2 of 4 sqmm wire (2 days) |
| 36 | Hire charges for maintaining of 2 of 4sqmm wire (14 days) |
| 37 | Hire and labour charges for supply run off and dismantling of 2 of 6 sqmm wire(2 days) |
| 38 | Hire charges for maintaining of 2 of 6 sqmm wire (14 days) |
| 39 | Hire and labour charges for supply,fixing and dismantling of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc., (2 days) |
| 40 | Hire charges for maintaining of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc., on (43 Days) (14 days) |
| 41 | Hire and labour charges for supply,fixing and dismantling of Earth pipe (one trial day and 1 end days ) (SR)(2 days) |
| 42 | Hire charges for maintaining of Earth pipe for (14 days) |
| 43 | Hire and labour charges for supply,fixing and dismantling of 6mtr GI post for Focus light fitting (2 days) |
| 44 | Hire charges for maintaining of of 6mtr GI post for Focus light fitting (14 days) |
| 45 | Hire and labour charges for supply,fixing and dismantling 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar (2 days) |
| 46 | Hirecharges for maintaining of 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar (14 days) |
| 47 | Hire and labour charges for supply,fixing and dismantling 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch(2 days) |
| 48 | Hire charges for maintaining of 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch (14 days) |
| 49 | Hire and labour charges for supply,fixing and dismantling 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch (2 days) |
| 50 | Hire charges for maintaining of 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch (14 days) |
| 51 | Hire and labour charges for supply,fixing and dismantling of 12 way SP MCB Distribution Board with 32A SPN MCB & 10 Nos. 10-32A SP MCB Switch (2 days) |
| 52 | Hirecharges for maintaining of12 way SP MCB Distribution Board with 32A DP MCB & 10 Nos. 10-32A SP MCB Switch (14 days) |
| 53 | Hire and labour charges for supply,fixing and dismantling of Exhaust Fan (2 days) |
| 54 | Hire charges for maintaining of Exhaust Fan (14 days) |
| 55 | Hire and labour charges for supply,fixing and dismantling of 2 KVA inverter with 4 hours backup (2 days) |
| 56 | Hire charges for maintaining of 2 KVA inverter with 4 hours backup (14 days) |
| 57 | Hire and labour charges for supply,fixing and dismantling 250 A Change over switch for DG Set (2 days) |
| 58 | Hire charges for maintaining of 250 A Change over switch for 13 days(8x14) |
| 59 | Hire and labour charges for supply,fixing and dismantling 400 A Change over switch for DG Set(2 days) |
| 60 | Hire charges for maintaining of 400 A Change over switch (14 days) |
| 61 | Hire and labour charges for supply,fixing and dismantling of 125 KVA Generator set (2 days) |
| 62 | Hire charges for maintaining of 125 KVA Generator set (14 days) |
| 63 | Hire and labour charges for supply, fixing and dismantling of 250 KVA Generator set (2 days) |
| 64 | Hire charges for maintaining of 250 KVA Generator set (14 days) |
| 65 | Hire and labour charges for supply, fixing and dismantling 2 TR split type AC units including erection, gas filling, Testing dismantling and transportation charges (for observer Room) (2 days) |
| 66 | Hire charges for maintaining of 2 TR split type AC units (14 days) |
| 67 | Hire and labour charges for supply, fixing and dismantling stabilizer for AC units dismantling and transportation charges (2 days) |
| 68 | Hire charges for maintaining of stabilizer for AC units (14 days) |
| 69 | Hire and labour charges for supply,fixing and dismantling Fire Alarm Panel(4 zone Panel) and transportation charges (2 days) |
| 70 | Hire charges for maintaining of Fire Alarm Panel(4 zone Panel) (14 days) |
| 71 | Hire and labour charges for supply,fixing and dismantling Smoke Detector and transportation charges (2 days) |
| 72 | Hire charges for maintaining of Smoke Detector (14 days) |
| 73 | Hire and labour charges for supply,fixing and dismantling Manual Call point and transportation charges (2 days) |
| 74 | Hire charges for maintaining of Manual Call point (14 days) |
| 75 | Hire and labour charges for supply,fixing and dismantling Hooter and transportation charges(2 days) |
| 76 | Hire charges for maintaining of Hooter (14 days) |
| 77 | Hire and labour charges for supply, fixing and dismantling 2 Core 1.5 Sqmm Copper Armoured Cable (2 days) |
| 78 | Hire charges for maintaining of 2 Core 1.5 Sqmm Copper Armoured Cable (14 days) |
| 79 | Hire and labour charges for supply,fixing and dismantling of GI Shed of size 15 ft x 10ft with necessary angle iron arrangements (2 days) |
| 80 | Hire charges for maintaining GI Shed of size 15 ft x 10ft with necessary angle iron arrangements (14 days) |
| 81 | Hire and labour charges for supply,fixing and dismantling of 65 inches LED TV for observers room and Media Centre (2 days) |
| 82 | Hire charges for maintaining of 65 inches LED TV for observers room and Media Centre (14 days) |
| 83 | Hire and labour charges for supply,fixing of Lighting Arrestor(2 days) |
| 84 | Hire charges for maintaining of Lighting Arrestor (14 days) |
| 85 | Hire and labour charges for supply,fixing of 400A ATS Panel(2 days) |
| 86 | Hire charges for maintaining of 400A ATS Panel (14 days) |
| 87 | GST @ 18 % Please Enable Macros to View BoQ information |