| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5coarse sand : 10graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shutteringand finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 5 | Construction of granular sub-base by providing close graded Materialconforming to specifications, mixing in a mechanical mix plant at OMC,carriage of mixed material by tippers to work site, for all leads & lifts,spreading in uniform layers of specified thickness with motor grader onprepared surface and compacting with vibratory power roller to achievethe desired density, complete as per specifications and directions ofEngineer-in-Charge.With material conforming to Grade-I (size range 75 mm to0.075 mm) having CBR Value-30 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. |
| 8 | Carriage of material by M.T of side including loading unloading complete Sand 10 Km and Stone Agg 10 Km |
| 9 | carriage of excavated earth Please Enable Macros to View BoQ information |