| 1 | Total amount of Sch 'A' Sec-I (BUILDING WORKS ) Lump sum price worked out by the contractor for \\" BUILDING WORKS \\" as listed in schedule 'A' Part-I |
| 2 | Total amount of Sch 'A' Sec-II (SITE CLEARANCE, SITE DEVELOPEMENT & MISC. EARTH WORKS) Lump sum price worked out by the contractor for \\" SITE CLEARANCE & EARTH WORKS \\" as listed in schedule 'A' Part-II |
| 3 | Total amount of Sch 'A' Sec-III (INTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for \\" INTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-III |
| 4 | Total amount of Sch 'A' Sec-IV (ARBORICULTURE WORKS) Lump sum price worked out by the contractor for \\"ARBORICULTURE WORKS \\" as listed in schedule 'A' Part-IV |
| 5 | Total amount of Sch 'A' Sec-V (SEWAGE DISPOSAL WORKS ) Lump sum price worked out by the contractor for \\" SEWAGE DISPOSAL WORKS \\" as listed in schedule 'A' Part-V |
| 6 | Total amount of Sch 'A' Sec-VI (ROAD, HARDSTANDING AND CULVERT WORKS ) Lump sum price worked out by the contractor for \\" ROAD, HARDSTANDING AND CULVERT WORKS \\" as listed in schedule 'A' Part-VI |
| 7 | Total amount of Sch 'A' Sec-VII ( AREA DRAINAGE WORKS ) Lump sum price worked out by the contractor for \\"AREA DRAINAGE WORKS \\" as listed in schedule 'A' Part-VII |
| 8 | Total amount of Sch 'A' Sec-VIII (FENCING WORKS ) Lump sum price worked out by the contractor for \\"FENCING WORKS \\" as listed in schedule 'A' Part-VIII |
| 9 | Total amount of Sch 'A' Sec-IX (EXTERNAL WATER SUPPLY WORKS ) Lump sum price worked out by the contractor for \\"EXTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-IX |
| 10 | Total amount of Sch 'A' Sec-X (LIGHTING PROTECTION WORKS) Lump sum price worked out by the contractor for \\"LIGHTING PROTECTION WORKS \\" as listed in schedule 'A' Part-X |
| 11 | Total amount of Sch 'A' Sec-XI (LIFT WORKS) Lump sum price worked out by the contractor for \\"LIFT WORKS \\" as listed in schedule 'A' Part-XI |
| 12 | Total amount of Sch 'A' Sec-XII (DG SET WORKS) Lump sum price worked out by the contractor for \\"DG SET WORKS \\" as listed in schedule 'A' Part-XII |
| 13 | Total amount of Sch 'A' Sec-XIII (RAINWATER HARVESTING WORKS) Lump sum price worked out by the contractor for \\"RAINWATER HARVESTING WORKS \\" as listed in schedule 'A' Part-XIII |
| 14 | Total amount of Sch 'A' Sec-XIV (HOT WATER WORKS) Lump sum price worked out by the contractor for \\"HOT WATER WORKS \\" as listed in schedule 'A' Part-XIV |
| 15 | Total amount of Sch 'A' Sec-XV (EXT ELECTRIFICATION WORKS) Lump sum price worked out by the contractor for \\"EXT ELECTRIFICATION WORKS \\" as listed in schedule 'A' Part-XV |
| 16 | Total amount of Sch 'A' Sec-XVI (FIRE FIGHTING AND FIRE ALARM WORKS) Lump sum price worked out by the contractor for \\"FIRE FIGHTING AND FIRE ALARM WORKS \\" as listed in schedule 'A' Part-XVI |
| 17 | Total amount of Sch 'A' Sec-XVII (INTERNAL ELECTRIFICATION WORKS) Lump sum price worked out by the contractor for \\"INTERNAL ELECTRIFICATION WORKS \\" as listed in schedule 'A' Part-XVII |
| 18 | Schedule 'A'Section-XVIII (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col. 6 siginifies this fact only. |
| 19 | M&L for HDPE DWC PVC pipe 150mm dia in SN4 stifness class laid in trenches complete all as specified and directed. |
| 20 | M&L HDPE DWC PVC pipe 200 mm dia in SN4 stiffness class laid in tenches complete all as specified and as directed. |
| 21 | Factory made RCC Manhole cover 80mm thick including steel frame work of 560mm dia , all as per IS and manufacture design instructions all as specified. |
| 22 | Supply and mixing properly manure/cowdung with excavated earth to make mixture of earth and manure to a ratio of 2:1 and surface dressing the area to true level and required slope for grass plantation or to make plant/flower beds Please Enable Macros to View BoQ information |
| 23 | Supply and mixing properly manure/cowdung with excavated earth to make mixture of earth and manure to a ratio of 2:1 and surface dressing the area to true level and required slope for grass plantation or to make plant/flower beds Please Enable Macros to View BoQ information |